TE19.26 - 95 St. Joseph Street - Construction Staging Area

Decision Type:
ACTION
Status:
Adopted
Schedule Type:
Delegated
Ward:
11 - University - Rosedale

Community Council Decision

The Toronto and East York Community Council:

 

1. Authorized the closure of the south sidewalk and a 2 metre wide portion of the south side, eastbound curb lane on St. Joseph Street, between a point 39 metres west of Bay Street and a point 87 metres further west, from February 1, 2025 to December 1, 2029, inclusive.

 

2. Rescinded the existing parking prohibition in effect at all times from Monday to Friday, on the south sides of St. Joseph Street, between a point 25 metres west of Bay Street and a point 150 metres further west.

 

3. Rescinded the existing maximum two-hour parking regulation in effect at all times on Sunday, on the south side of St. Joseph Street, between a point 25 metres west of Bay Street and a point 150 metres further west.

 

4. Prohibited stopping at all times on the south side of St. Joseph Street, between a point 25 metres west of Bay Street and a point 150 metres further west.

 

5. Directed the applicant to sweep the construction site, adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe.

 

6. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night.

 

7. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications.

 

8. Directed the applicant to install appropriate signage and request the applicant to maintain all sightlines to ensure that pedestrians, cyclists and motorists safety is considered at all times.

 

9. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public.

 

10. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and the Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public.

 

11. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.

 

12. Directed the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure within the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work.

 

13. Directed that St. Joseph Street be returned to its pre-construction traffic and parking regulations when the project is complete.

 

14. Directed the applicant to provide monthly community meetings, to discuss any concerns raised by the community.

Origin

(November 15, 2024) Report from the Director, Traffic Management, Transportation Services

Summary

This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision.

 

The Daniels Corporation is constructing a 40-storey mixed-use building (senior residence/condominium) building at 95 St. Joseph Street. The site is located on the south side of St. Joseph Street, approximately 39 metres west of Bay Street.

 

Transportation Services is requesting authorization to close the south sidewalk and a 2 metre wide portion of the eastbound curb lane on St. Joseph Street for a period of 58 months, from February 1, 2025 to December 1, 2029, in order to facilitate construction staging operations. Pedestrian movements on the south side of St. Joseph Street, abutting the site, will be restricted, thus pedestrians will be redirected to the sidewalk on the north side of the roadway.  

Background Information

(November 15, 2024) Report and Attachment 1 from the Director, Traffic Management, Transportation Services on 95 St. Joseph Street - Construction Staging Area
https://www.toronto.ca/legdocs/mmis/2025/te/bgrd/backgroundfile-251556.pdf