Item - 2025.EY21.9

Tracking Status

  • This item was considered by Etobicoke York Community Council on April 2, 2025 and was adopted without amendment. City Council has delegated authority for this matter to the Etobicoke York Community Council and therefore, the decision is final.
  • See also By-law 259-2025

EY21.9 - Nordin Avenue (1156 The Queensway) - Construction Staging Area

Decision Type:
ACTION
Status:
Adopted
Schedule Type:
Delegated
Ward:
3 - Etobicoke - Lakeshore

Community Council Decision

The Etobicoke York Community Council:

 

1. Authorized the closure of the east sidewalk and a 2.2 metre wide portion of the northbound curb lane on Nordin Avenue, between The Queensway and a point 47 metres further north, and provision of a temporary pedestrian walkway within the closed portion of the northbound curb lane, from April 30, 2025 to June 30, 2027, inclusive.

 

2. Prohibited stopping at all times on the east side of Nordin Avenue, between The Queensway and a point 47 metres north.

 

3. Directed the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe.

 

4. Directed the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA).

 

5. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night.

 

6. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications.

 

7. Directed the applicant to install appropriate signage and request the applicant to maintain all sightlines to ensure that pedestrians, cyclists and motorists safety is considered at all times.

 

8. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public.

 

9. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public.

 

10. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired.

 

11. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.

 

12. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor.

 

13. Directed the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure within the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work.

 

14. Directed that Nordin Avenue, The Queensway and Woolgar Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.

 

15. Directed the applicant to provide monthly community meetings, to discuss any concerns raised by the community.

Origin

(March 14, 2025) Report from the Director, Traffic Management, Transportation Services

Summary

This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision.

 

ELM Developments is constructing an 11-storey residential building at 1156 The Queensway. The site is located on the north side The Queensway, between Nordin Avenue and Woolgar Avenue.

 

Transportation Services is requesting authorization to close the east sidewalk and a 2.2 metre wide portion of the northbound curb lane on the east side of Nordin Avenue for a period of 26 months, from April 30, 2025 to June 30, 2027, in order to facilitate construction staging operations. Pedestrians will be redirected into a 2.1 metre wide covered and protected walkway within the closed portion of the northbound curb lane on Nordin Avenue. The proposed stopping prohibition on the east side of Nordin Avenue will result in the loss of total four (maximum three-hours) parking spaces.

Background Information

(March 14, 2025) Report and Attachment 1 from the Director, Traffic Management, Transportation Services on Nordin Avenue (1156 The Queensway) - Construction Staging Area
https://www.toronto.ca/legdocs/mmis/2025/ey/bgrd/backgroundfile-253559.pdf

Motions

Motion to Adopt Item moved by Councillor Amber Morley (Carried)