TE12.42 - 1404-1428 Yonge Street - Construction Staging Area
- Decision Type:
- ACTION
- Status:
- Deferred
- Ward:
- 12 - Toronto - St. Paul's
Community Council Decision
The Toronto and East York Community Council:
1. Deferred consideration of the Item until the May 7, 2024 meeting of the Toronto and East York Community Council.
Origin
Summary
City Council on December 13, 14, and 15, 2023, referred Item TE9.45 to the January 24, 2024 meeting of the Toronto and East York Community Council.
Summary from the report and attachment 1 (October 30, 2023) from the Director, Traffic Management, Transportation Services on 1404-1428 Yonge Street - Construction Staging Area
As the Toronto Transit Commission (TTC) operates a transit service on Yonge Street, City Council approval of this report is required.
YSC Development Corp is constructing a 50-storey condominium building at 1404-1428 Yonge Street. The site is located on the west side of Yonge Street between St Clair Avenue West and Farnham Avenue.
Transportation Services is requesting approval to close the west sidewalk, the southbound bike lane, a portion of the southbound lane, and the northbound bike lane on Yonge Street for a period of 35 months, from November 30, 2023 to October 31, 2026 to facilitate construction staging operations. Pedestrian movements on the west side of Yonge Street, abutting the site, will be maintained in a minimum 1.8 metre-wide covered and protected walkway. The southbound and northbound bike lanes will be closed, and signage will be posted informing cyclists the bike lane ends in advance of the construction staging area and shared lane pavement markings will be installed advising cyclists and motorists to merge into a single traffic lane in the vicinity of the work zone.
The construction staging area will result in the loss of four parking machine on-street spaces on the west side of Yonge Street.
Background Information
https://www.toronto.ca/legdocs/mmis/2024/te/bgrd/backgroundfile-243690.pdf
(October 30, 2023) Report and Attachment 1 from the Director, Traffic Management, Transportation Services on 1404-1428 Yonge Street - Construction Staging Area
https://www.toronto.ca/legdocs/mmis/2024/te/bgrd/backgroundfile-243691.pdf
Communications
Motions
That consideration of the item be deferred until May 7, 2024 meeting of the Toronto and East York Community Council.