Item - 2024.NY19.21
Tracking Status
- This item was considered by North York Community Council on December 3, 2024 and was adopted with amendments. City Council has delegated authority for this matter to the North York Community Council and therefore, the decision is final.
- See also By-law 1289-2024
NY19.21 - 109 Erskine Avenue - Construction Staging Area
- Decision Type:
- ACTION
- Status:
- Amended
- Schedule Type:
- Delegated
- Ward:
- 15 - Don Valley West
Community Council Decision
North York Community Council:
1. Authorized the closure of the south sidewalk and a 2.4 metre wide portion of the eastbound curb lane on Erskine Avenue, between a point 27 metres west of Redpath Avenue and a point 30 metres further west, and a provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane, from December 4, 2024 to September 30, 2025.
2. Prohibited stopping at all times on the south side of Erskine Avenue, between a point 27 metres west of Redpath Avenue and a point 30 metres further west.
3. Directed the applicant to pressure wash or sweep (weather permitting) the construction site and adjacent sidewalks and roadways daily, or more frequently as needed and to be cleared of any construction debris and made safe.
4. Directed the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA).
5. Directed the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night.
6. Directed the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications.
7. Directed the applicant to install appropriate signage and request the applicant to install converging mirrors to ensure that pedestrians, cyclists and motorists safety is considered at all times.
8. Directed the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public.
9. Directed the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public.
10. Directed the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired.
11. Directed the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.
12. Directed the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor.
13. Directed the applicant, in consultation with Transportation Services, to maintain any bicycle lanes, and install appropriate signage to inform drivers and cyclists of any changes to the bicycle lanes.
14. Directed that Erskine Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.
15. Directed the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure with the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work.
16. Directed the applicant to provide monthly community meetings, to discuss any concerns raised by the community.
Decision Advice and Other Information
North York Community Council:
1. Requested the Director, Traffic Management, Transportation Services to work with the applicant on options to shorten the proposed duration of the road occupation and report back to North York Community Council in September 2025.
Origin
Summary
This staff report is about a matter that Community Council has delegated authority from City Council to make a final decision.
LCG Residential Builders Ltd., is constructing a 22-storey residential building at 109 Erskine Avenue. The site is located on the south side of Erskine Avenue, approximately 350 metres east of Yonge Street and one parcel west of the southwest corner of Erskine Avenue and Redpath Avenue.
Transportation Services is requesting authorization to temporarily close a portion of the eastbound curb lane and the south sidewalk on Erskine Avenue for a period of 17 months, from December 4, 2024 to April 30, 2026, in order to enable construction staging operations for the development. Pedestrians will be redirected into a 1.7 metre covered and protected walkway within the closed portion of the eastbound lane on the south side of Erskine Avenue. It should be noted that construction of the development is currently in progress, operating under a monthly Street Occupation Permit.
Background Information
https://www.toronto.ca/legdocs/mmis/2024/ny/bgrd/backgroundfile-250671.pdf
Motions
The North York Community Council:
1. Delete Recommendation 1 in the report (November 15, 2024 ) from the Director, Traffic Management, Transportation Services,
Recommendation to be deleted
1. North York Community Council authorize the closure of the south sidewalk and a 2.4 metre wide portion of the eastbound curb lane on Erskine Avenue, between a point 27 metres west of Redpath Avenue and a point 30 metres further west, and a provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane, from December 4, 2024 to April 30, 2026 inclusive.
and adopt instead instead the following recommendation:
1. North York Community Council authorize the closure of the south sidewalk and a 2.4 metre wide portion of the eastbound curb lane on Erskine Avenue, between a point 27 metres west of Redpath Avenue and a point 30 metres further west, and a provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane, from December 4, 2024 to September 30, 2025.
That North York Community Council:
1. Request the Director, Traffic Management, Transportation Services to work with the applicant on options to shorten the proposed duration of the road occupation and report back to North York Community Council in September 2025.