Item - 2024.EY14.12

Tracking Status

  • City Council adopted this item on June 26 and 27, 2024 without amendments and without debate.
  • This item was considered by the Etobicoke York Community Council on June 3, 2024 and adopted without amendment. It will be considered by City Council on June 26 and 27, 2024.
  • See also By-law 653-2024

EY14.12 - 16-26 Earlington Avenue and 4161- 4169 Dundas Street West - Construction Staging Area

Decision Type:
ACTION
Status:
Adopted on Consent
Ward:
3 - Etobicoke - Lakeshore

City Council Decision

City Council on June 26 and 27, 2024, adopted the following:

 

1. City Council authorize the closure of the south sidewalk and a 2.5 metre wide portion of the eastbound curb lane on Dundas Street West, between Earlington Avenue and a point 51 metres west and provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane, from July 1, 2024 to July 31, 2025, inclusive.

 

2. City Council prohibit stopping at all times on the west side of Earlington Avenue, between Dundas Street West and a point 101 metres south.

 

3. City Council direct the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe.

 

4. City Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act.

 

5. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night.

 

6. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications.

 

7. City Council direct the applicant to install appropriate signage and request the applicant to maintain all sightlines to ensure that pedestrians, cyclists and motorists safety is considered at all times.

 

8. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public.

 

9. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public.

 

10. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired.

 

11. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.

 

12. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor.

 

13. City Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure within the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work.

 

14. City Council direct that Dundas Street West and Earlington Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.

Background Information (Community Council)

(May 23, 2024) Report and Attachment 1 from the Director, Traffic Management, Transportation Services on 16-26 Earlington Avenue and 4161- 4169 Dundas Street West - Construction Staging Area
https://www.toronto.ca/legdocs/mmis/2024/ey/bgrd/backgroundfile-246246.pdf
(May 29, 2024) Letter from Councillor Amber Morley
https://www.toronto.ca/legdocs/mmis/2024/ey/bgrd/backgroundfile-246247.pdf

EY14.12 - 16-26 Earlington Avenue and 4161- 4169 Dundas Street West - Construction Staging Area

Decision Type:
ACTION
Status:
Adopted
Ward:
3 - Etobicoke - Lakeshore

Community Council Recommendations

The Etobicoke York Community Council recommends that:  

 

1. City Council authorize the closure of the south sidewalk and a 2.5 metre wide portion of the eastbound curb lane on Dundas Street West, between Earlington Avenue and a point 51 metres west and provision of a temporary pedestrian walkway within the closed portion of the eastbound curb lane, from July 1, 2024 to July 31, 2025, inclusive.

 

2. City Council prohibit stopping at all times on the west side of Earlington Avenue, between Dundas Street West and a point 101 metres south.

 

3. City Council direct the applicant to sweep the construction site and adjacent sidewalks and roadways daily, or more frequently as needed to be cleared of any construction debris and made safe.

 

4. City Council direct the applicant to construct and maintain a fully covered, protected and unobstructed walkway for all pedestrians, including for those with mobility devices, for the entire duration of the construction staging area permit to the satisfaction of the City engineer and ensure it is compliant with the Accessibility for Ontarians with Disabilities Act (AODA).

 

5. City Council direct the applicant to ensure that the existing sidewalks or the proposed pedestrian walkway have proper enhanced lighting to ensure safety and visibility at all times of the day and night.

 

6. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications.

 

7. City Council direct the applicant to install appropriate signage and request the applicant to maintain all sightlines to ensure that pedestrians, cyclists and motorists safety is considered at all times.

 

8. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public.

 

9. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public.

 

10. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired.

 

11. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.

 

12. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor.

 

13. City Council direct the applicant to cooperate with and provide all necessary assistance to the City Engineers, staff and representatives carrying out operation, maintenance, and construction activities to municipal infrastructure within the vicinity of the construction staging area, and at no cost to the City to remove any staging to accommodate the necessary municipal infrastructure work.

 

14. City Council direct that Dundas Street West and Earlington Avenue be returned to its pre-construction traffic and parking regulations when the project is complete.

Origin

(May 23, 2024) Report from the Director, Traffic Management, Transportation Services

Summary

As the Toronto Transit Commission (TTC) operates a transit service on Dundas Street West, City Council approval of this report is required.

 

Dunpar Developments Inc. has undertaken the construction of a 10-storey residential building and 10 townhouse units at 16-26 Earlington Avenue and 4161-4169 Dundas Street West. The site is located on the southwest corner of Dundas Street West and Earlington Avenue.

 

Transportation Services is requesting authorization to close the south sidewalk and a 2.5 metre wide portion of the south side eastbound curb lane on Dundas Street West for a period of 13 months, from July 1, 2024 to July 31, 2025, to facilitate construction staging operations. Pedestrian movements on the south side of Dundas Street West, abutting the site, will be maintained in 1.9 metre wide covered and protected walkway.

Background Information

(May 23, 2024) Report and Attachment 1 from the Director, Traffic Management, Transportation Services on 16-26 Earlington Avenue and 4161- 4169 Dundas Street West - Construction Staging Area
https://www.toronto.ca/legdocs/mmis/2024/ey/bgrd/backgroundfile-246246.pdf
(May 29, 2024) Letter from Councillor Amber Morley
https://www.toronto.ca/legdocs/mmis/2024/ey/bgrd/backgroundfile-246247.pdf

Motions

Motion to Add New Business at Committee moved by Councillor Stephen Holyday (Carried)

Motion to Adopt Item moved by Councillor Amber Morley (Carried)
Source: Toronto City Clerk at www.toronto.ca/council