Item - 2022.NY33.44

Tracking Status

NY33.44 - Thomas Clark Way Extension Progress Update

Decision Type:
ACTION
Status:
Adopted
Ward:
17 - Don Valley North

Community Council Decision

North York Community Council:

 

1. Received the report (June 10, 2022) from the Director, Project Design and Management, Transportation Services for information.

Origin

(June 10, 2022) Report from the Director, Project Design and Management, Transportation Services

Summary

Thomas Clark Way is a planned street that will serve the community located to the southeast of the Bayview Avenue and Sheppard Avenue East intersection. The street will extend approximately 200 metres (m) between Kenaston Gardens in the west and Rean Drive in the east, with a two-way stop-controlled intersection at Barberry Place.  The street will have a right-of-way width varying between 16.5m and 20.0m with a paved surface of 8.5 m, including wide sidewalks on both sides of the street and grassed boulevard space.

 

Portions of Thomas Clark Way have been constructed between Rean Drive and Barberry Place and between Barberry Place and Kenaston Gardens. These sections are dedicated as a future public road but are not yet assumed by the City. The remaining segment of Thomas Clark Way will be delivered by the City. Detailed design for the remaining segment is underway and anticipated to be completed by Q1 2023. Construction is anticipated to begin in 2023.

Background Information

(June 10, 2022) Report from the Director, Project Design and Management, Transportation Services on Thomas Clark Way Extension Progress Update
https://www.toronto.ca/legdocs/mmis/2022/ny/bgrd/backgroundfile-227197.pdf

Motions

1 - Motion to Adopt Item moved by Councillor Shelley Carroll (Carried)
Source: Toronto City Clerk at www.toronto.ca/council