EY28.18 - Construction Staging Area - 300-304 The East Mall

Decision Type:
ACTION
Status:
Amended
Wards:
2 - Etobicoke Centre, 3 - Etobicoke - Lakeshore

City Council Decision

City Council on December 15, 16 and 17, 2021, adopted the following:

 

1. City Council authorize the closure of the west sidewalk on The East Mall, between Bloor Street West and Gibbs Road, from December 16, 2021 to November 30, 2024.

 

2. City Council authorize the closure of the south sidewalk on Gibbs Road, between The East Mall and a point approximately 134 metres west, from December 16, 2021 to November 30, 2024.

 

3. City Council rescind the existing parking prohibition in effect at all times on both sides of Gibbs Street, between The East Mall and Highway 427 northbound ramp.

 

4. City Council rescind the existing stopping prohibition in effect at all times on the south side of Gibbs Street, between The East Mall and a point 61 metres west.

 

5. City Council prohibit stopping at all times on the south side of Gibbs Street, between The East Mall and Highway 427 northbound ramp.

 

6. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways daily, or more frequently as needed, to keep clear of any construction debris and made safe.

 

7. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local Business Improvement Areas and resident associations in advance of any physical road modifications.

 

8. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrian, cyclist and motorist safety is considered at all times.

 

9. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public.

 

10. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public.

 

11. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired.

 

12. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.

 

13. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor. 

Background Information (Community Council)

(November 3, 2021) Report and Attachment 1 from the Acting Director, Traffic Management, Transportation Services on Construction Staging Area - 300-304 The East Mall
https://www.toronto.ca/legdocs/mmis/2021/ey/bgrd/backgroundfile-172842.pdf

Motions (City Council)

1 - Motion to Adopt Item as Amended moved by Councillor Stephen Holyday (Carried)

That City Council adopt the following recommendations in the report (November 3, 2021) from the Acting Director, Traffic Management, Transportation Services:

 

1. City Council authorize the closure of the west sidewalk on The East Mall, between Bloor Street West and Gibbs Road, from December 16, 2021 to November 30, 2024.

 

2. City Council authorize the closure of the south sidewalk on Gibbs Road, between The East Mall and a point approximately 134 metres west, from December 16, 2021 to November 30, 2024.

 

3. City Council rescind the existing parking prohibition in effect at all times on both sides of Gibbs Street, between The East Mall and Highway 427 northbound ramp.

 

4. City Council rescind the existing stopping prohibition in effect at all times on the south side of Gibbs Street, between The East Mall and a point 61 metres west.

 

5. City Council prohibit stopping at all times on the south side of Gibbs Street, between The East Mall and Highway 427 northbound ramp.

 

6. City Council direct the applicant to pressure wash the construction site and adjacent sidewalks and roadways daily, or more frequently as needed, to keep clear of any construction debris and made safe.

 

7. City Council direct the applicant to clearly consult and communicate all construction, parking and road occupancy impacts with local business improvement areas and resident associations in advance of any physical road modifications.

 

8. City Council direct the applicant to install appropriate signage and converging mirrors to ensure that pedestrian, cyclist and motorist safety is considered at all times.

 

9. City Council direct the applicant to provide a sufficient number of traffic control persons as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, on a daily basis to control construction vehicle access and egress to and from the site and maintain a safe environment for the public.

 

10. City Council direct the applicant to provide a sufficient number of pay-duty Police Officers as determined by the Work Zone Coordinator and Toronto Police Construction Liaison Officer, during large scale concrete pours and large scale material deliveries to control vehicle access and egress to and from the site and maintain a safe environment for the public.

 

11. City Council direct the applicant to install cane detection within the covered and protected walkway to guide pedestrians who are visually impaired.

 

12. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.

 

13. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor.

EY28.18 - Construction Staging Area - 300-304 The East Mall

Decision Type:
ACTION
Status:
Without Recs
Wards:
2 - Etobicoke Centre, 3 - Etobicoke - Lakeshore

Community Council Recommendations

The Etobicoke York Community Council: 

 

1. Forwards the item to City Council without recommendations.

Decision Advice and Other Information

The Etobicoke York Community Council:

 

1. Requested that the appropriate staff meet with the applicant, representatives from Bloorlea Middle School, and with the Ward Councillor to resolve concerns regarding dust emissions from the site.

Origin

(November 3, 2021) Report from the Acting Director, Traffic Management, Transportation Services

Summary

As the Toronto Transit Commission (TTC) operates a transit service on The East Mall, City Council approval of this report is required.

 

PCL Constructors Canada Inc. is constructing 29 and 10 storey rental towers at 300-304 The East Mall. The site is located on the west side of The East Mall between Gibbs Road and Bloor Street West.

 

Transportation Services is requesting approval to close the west sidewalk on The East Mall and the south sidewalk on Gibbs Road for a period of 36 months (i.e., December 16, 2021 to November 30, 2024) to facilitate construction staging operations. Pedestrian movements on the west side of The East Mall and on the south side of Gibbs Road abutting the site will be restricted and pedestrians will be directed to the east side sidewalk of The East Mall and to the north side sidewalk of Gibbs Road respectively.

 

There will be no impact on the traffic lanes on The East Mall or Gibbs Road.

 

During the course of the preparation of this report, staff noted that there is a discrepancy between the posted stopping prohibition signs on the north and south sides of Gibbs Road and the existing parking regulations. Recommendations 3, 4 and 5 will correct these inconsistencies.

Background Information

(November 3, 2021) Report and Attachment 1 from the Acting Director, Traffic Management, Transportation Services on Construction Staging Area - 300-304 The East Mall
https://www.toronto.ca/legdocs/mmis/2021/ey/bgrd/backgroundfile-172842.pdf

Motions

1 - Motion to forward item Without Recommendations moved by Councillor Stephen Holyday (Carried)

That the Etobicoke York Community Council: 

 

1. Forward the item to City Council without recommendations.

 

2. Request that the appropriate staff meet with the applicant, representatives from Bloorlea Middle School, and with the Ward Councillor to resolve concerns regarding dust emissions from the site.