Item - 2021.BA169.4

Tracking Status

  • This item was considered by Bid Award Panel on December 22, 2021 and was adopted without amendment.

BA169.4 - Award of Ariba Document Number 3082157835 to The Municipal Infrastructure Group Ltd. for the Professional Engineering Services during Detailed Design, Construction, and Post Construction for Abandoning the Existing Transmission Watermains for Engineering and Construction Division

Decision Type:
ACTION
Status:
Adopted
Wards:
3 - Etobicoke - Lakeshore, 11 - University - Rosedale, 12 - Toronto - St. Paul's

Panel Decision

The Bid Award Panel adopted the following:

 

1.  Bid Award Panel grant authority to award the contract in accordance with the Contract Details set out in the report (December 16, 2021) from the Chief Procurement Officer:

 

Solicitation Number:

Request for Proposal, Ariba Document Number 3082157835, Contract Number RFP-21ECS-LU-03TT

 

Description:

Professional Engineering Services during Detailed Design, Construction and Post Construction for Abandoning the Existing Transmission Watermains on Boulton Drive, St. George Street and Seventh Street and Road Resurfacing on Boulton Drive and Seventh Street.

 

Recommended Supplier:

The Municipal Infrastructure Group Ltd.

 

Contract Award Value:

$2,048,529 net of all applicable taxes and charges

$2,314,838 including HST and all applicable charges

$2,084,583 net of HST recoveries

 

Contract is expected to start on January 1, 2022 and end on February 28, 2027.

Origin

(December 16, 2021) Report from the Chief Procurement Officer

Summary

Solicitation Issued: August 30, 2021                Solicitation Closed: October 8, 2021

Number of Addenda Issued: Nine (9)

Number of Bids: Two (2)

 

Table 2: Summary of Proposals Received

 

Supplier Name

CIMA Canada Inc

The Municipal Infrastructure Group Ltd

Background Information

(December 16, 2021) Report from the Chief Procurement Officer on Award of Ariba Document Number 3082157835 to The Municipal Infrastructure Group Ltd. for the Professional Engineering Services during Detailed Design, Construction, and Post Construction for Abandoning the Existing Transmission Watermains for Engineering and Construction Division
https://www.toronto.ca/legdocs/mmis/2021/ba/bgrd/backgroundfile-174514.pdf

Motions

Motion to Adopt Item (Carried)

Moved by Stephanie Fernandes.

 

Vote (Adopt Item)

Result:

Majority Required

Yes:

Stephanie Fernandes, David McLeod, Anita Pathmanathan

No:

 

Absent:

Jay Paleja (Chair)

 

Source: Toronto City Clerk at www.toronto.ca/council