Item - 2019.PA6.3
Tracking Status
- Due to a lack of quorum, Toronto Parking Authority did not consider this item.
PA6.3 - Modifications to Operations, Municipal Car Park 58, 9 Bedford Road - Construction Contract Award
- Status:
- No Quorum
- Ward:
- 11 - University - Rosedale
Decision Advice and Other Information
Due to lack of quorum, the Board did not consider this item.
Origin
(June 3, 2019) Report from the Acting President, Toronto Parking Authority
Summary
A tender package, including all technical requirements, material, and labour, was prepared by McIntosh Perry Limited as previously approved by the TPA (Internal Memorandum, November 7, 2017). McIntosh Perry Limited tendered the work on behalf of the TPA to 11 pre-qualified general contractors on May 1, 2019. The call closed on May 22, 2019 and four bids were received and considered as listed below in the ascending order without the HST.
Table 1: Summary of Bids Received (net of applicable taxes)
|
General Contractors |
Amount |
Percentage |
|
Alto Restoration Ltd. |
$555,200 |
100 |
|
CanMar Contracting Ltd. |
$597,300 |
108 |
|
Structural Contracting Ltd. |
$641,550 |
116 |
|
Martinway Contracting Ltd. |
$1,018,000 |
183 |
Background Information
(June 3, 2019)
Report from the Acting President, Toronto Parking Authority on Modifications to Operations, Municipal Car Park 58, 9 Bedford Road - Construction Contract Award
https://www.toronto.ca/legdocs/mmis/2019/pa/bgrd/backgroundfile-133896.pdf
(May 27, 2019) Attachment 1 - Consultant's Bid Review and Recommendations including a Bid Comparison Sheet
https://www.toronto.ca/legdocs/mmis/2019/pa/bgrd/backgroundfile-133897.pdf
https://www.toronto.ca/legdocs/mmis/2019/pa/bgrd/backgroundfile-133896.pdf
(May 27, 2019) Attachment 1 - Consultant's Bid Review and Recommendations including a Bid Comparison Sheet
https://www.toronto.ca/legdocs/mmis/2019/pa/bgrd/backgroundfile-133897.pdf