Item - 2019.BA30.2
Tracking Status
- This item was considered by Bid Award Panel on June 19, 2019 and was adopted without amendment.
BA30.2 - Award of Request for Proposal 9117-18-5099 to Associated Engineering (Ont.) Ltd. for Engineering Services for the Rehabilitations of Reid Manor Pedestrian Bridge (ID604) and Van Dusen Pedestrian Bridge over Mimico Creek (ID605)
- Decision Type:
- ACTION
- Status:
- Adopted
- Ward:
- 3 - Etobicoke - Lakeshore
Panel Decision
The Bid Award Panel adopted the following:
1. Bid Award Panel grant authority to award the contract in accordance with the Contract Details set out in the report (June 11, 2019) from the Chief Purchasing Officer:
Call Number:
Request for Proposal 9117-18-5099
Description:
For the Engineering Design Services and Services During Construction for the Rehabilitations of Reid Manor Pedestrian Bridge (ID604) and Van Dusen Pedestrian Bridge over Mimico Creek (ID605).
Recommended Proponent:
Associated Engineering (Ont.) Ltd.
Contract Award Value:
$866,078 net of all applicable taxes and charges
$978,668 including HST and all applicable charges
$881,321 net of HST recoveries
Contract is expected to start on June 28, 2019 and end no later than December 31, 2023.
Origin
Summary
Call Issued: December 14, 2018 Call Closed: February 5, 2019
Number of Addenda Issued: Seven (7)
Number of Bids: Seven (7)
Table 2: Summary of Proposals Received for Request for Proposal 9117-18-5099
|
Proponent Name |
|
Associated Engineering (Ont.) Ltd. |
|
CH2M Hill Canada Limited operating as Jacobs * |
|
Doug Dixon & Associates Inc. |
|
HDR Corporation * |
|
Moon-Matz Ltd. ** |
|
Morrison Hershfield Limited |
|
WSP Canada Group Limited *** |
* Bid price was corrected for mathematical errors. Purchasing and Materials Management has verified that the mathematical errors were corrected.
** Proponent did not meet the minimum technical threshold score of 75 percent (60/80 points).
*** Bid did not meet mandatory requirement in the Request for Proposal and was declared non-compliant.
Range of Scores:
Of the five proposals which passed the minimum technical threshold of 75 percent, the highest scoring proposal received 90.5 percent while the lowest scoring proposal received 80.2 percent.
Background Information
https://www.toronto.ca/legdocs/mmis/2019/ba/bgrd/backgroundfile-134656.pdf
Motions
Moved by Michael Moretti.