Item - 2017.TE25.68
Tracking Status
- City Council adopted this item on July 4, 5, 6 and 7, 2017 without amendments.
- This item was considered by Toronto and East York Community Council on June 13, 2017 and was adopted with amendments. It will be considered by City Council on July 4, 5, 6 and 7, 2017.
TE25.68 - Construction Staging Area - 324-332 Richmond Street West
- Decision Type:
- ACTION
- Status:
- Adopted
- Ward:
- 20 - Trinity-Spadina
City Council Decision
City Council on July 4, 5, 6 and 7, 2017, adopted the following:
1. City Council approve the closure of the north sidewalk on Richmond Street West, between a point 36 metres east of Peter Street and a point 48 metres further east from July 10, 2017 to March 31, 2019.
2. City Council approve the closure of the north bike lane and curb lane on Richmond Street West, between a point 16.5 metres east of Peter Street and a point 92 metres further east and the provision of a protected bike lane and sidewalk within the closed north side curb lane from July 10, 2017 to March 31, 2019.
3. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.
4. City Council direct the applicant to work with the STEPS Initiative to provide and install public art, including mural artwork, on every elevation of the hoarding board with adequate spotlighting for night-time illumination, at sole cost to the applicant and to the satisfaction of the Ward Councillor.
5. City Council direct Richmond Street West be returned to its pre-construction traffic regulations and lane configurations when the project is completed.
Background Information (Community Council)
https://www.toronto.ca/legdocs/mmis/2017/te/bgrd/backgroundfile-104526.pdf
Motions (City Council)
Vote (Adopt Item) Jul-07-2017 9:48 AM
| Result: Carried | Majority Required - TE25.68 - Adopt the item |
|---|---|
| Total members that voted Yes: 34 | Members that voted Yes are Paul Ainslie, Maria Augimeri, Jon Burnside, John Campbell, Christin Carmichael Greb, Gary Crawford, Joe Cressy, Janet Davis, Glenn De Baeremaeker, Frank Di Giorgio, Sarah Doucette, John Filion, Michael Ford, Mary Fragedakis, Mark Grimes, Jim Hart, Michelle Holland, Stephen Holyday, Jim Karygiannis, Norman Kelly, Mike Layton, Chin Lee, Giorgio Mammoliti, Josh Matlow, Mary-Margaret McMahon, Joe Mihevc, Denzil Minnan-Wong, Frances Nunziata (Chair), Cesar Palacio, Gord Perks, Neethan Shan, Michael Thompson, John Tory, Kristyn Wong-Tam |
| Total members that voted No: 0 | Members that voted No are |
| Total members that were Absent: 11 | Members that were absent are Ana Bailão, Shelley Carroll, Josh Colle, Vincent Crisanti, Justin J. Di Ciano, Paula Fletcher, Pam McConnell, James Pasternak, Anthony Perruzza, Jaye Robinson, David Shiner |
TE25.68 - Construction Staging Area - 324-332 Richmond Street West
- Decision Type:
- ACTION
- Status:
- Amended
- Ward:
- 20 - Trinity-Spadina
Community Council Recommendations
The Toronto and East York Community Council recommends that:
1. City Council approve the closure of the north sidewalk on Richmond Street West, between a point 36 metres east of Peter Street and a point 48 metres further east from July 10, 2017 to March 31, 2019.
2. City Council approve the closure of the north bike lane and curb lane on Richmond Street West, between a point 16.5 metres east of Peter Street and a point 92 metres further east and the provision of a protected bike lane and sidewalk within the closed north side curb lane from July 10, 2017 to March 31, 2019.
3. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.
4. City Council direct the applicant to work with the STEPS Initiative to provide and install public art, including mural artwork, on every elevation of the hoarding board with adequate spotlighting for night-time illumination, at sole cost to the applicant and to the satisfaction of the Ward Councillor.
5. City Council direct Richmond Street West be returned to its pre-construction traffic regulations and lane configurations when the project is completed.
Origin
Summary
As the Toronto Transit Commission (TTC) operates a transit service on Richmond Street West, City Council approval of this report is required.
Petaluma Building Group is constructing a 25-storey residential condominium building at 324-332 Richmond Street West, located on the north side of Richmond Street West between John Street and Peter Street.
Transportation Services is requesting approval to close the sidewalk, bike lane and curb lane on the north side of Richmond Street West for a period of 21 months in order to enable construction of the above mentioned development. Pedestrian and bicycle operations will be maintained within the closed portion of the existing bike lane and curb lane on Richmond Street West.
Background Information
https://www.toronto.ca/legdocs/mmis/2017/te/bgrd/backgroundfile-104526.pdf
Motions
Amend Recommendation 4, so that it reads:
“City Council direct the applicant to work with the STEPS Initiative to provide and install public art, including mural artwork, on every elevation of the hoarding board with adequate spotlighting for night-time illumination, at sole cost to the applicant and to the satisfaction of the Ward Councillor."