MM27.47 - 5220-5254 Yonge Street, 78 Ellerslie Avenue, 32 Churchill Avenue and 55 Horsham Avenue - Official Plan, Zoning, Site Plan, and Rental Housing Demolition Applications - by Councillor David Shiner, seconded by Councillor Christin Carmichael Greb

Decision Type:
ACTION
Status:
Amended
Ward:
23 - Willowdale

City Council Decision

City Council on March 28 and 29, 2017 adopted the following:

 

A. City Council amend its decision of July 11, 12 and 13, 2012 (NY 17.45) by deleting Part 4.a.iv and deleting Parts 1, 2, 4.a.v, 4.a.ix, 4.a.x, 5.i, 7, 9, 10 and replacing them with the following:

 

1.  City Council amend the North York Centre Secondary Plan, substantially in accordance with the draft Official Plan Amendment attached as Attachment 4 to the report (March 21, 2017) from the Chief Planner and Executive Director, City Planning.

 
2.  City Council amend North York Zoning By-law 7625, substantially in accordance with the draft Zoning By-law Amendment attached as Attachment 5 to the report (March 21, 2017) from the Chief Planner and Executive Director, City Planning.

 
3.  Before introducing the necessary Bills for the Official Plan and Zoning By-law Amendments to City Council for enactment:
 

a.  the Owner shall enter into an agreement with the City pursuant to Section 37 of the Planning Act, to the satisfaction of the Chief Planner and Executive Director, City Planning and the City Solicitor, to secure and provide the facilities, services and/or matters as generally outlined below:

 

v.  a minimum of 31.99 square metres for a bicycle shower and change facility, located below grade;

 
ix.  the provision of a minimum of 324.59 square metres of Social Facility Space for the City fronting on an east-west publicly accessible mews, substantially in accordance with revised Term Sheet attached to motion 1a by Councillor Shiner and any further amendments as deemed appropriate by the Director, Real Estate Services, in consultation with the local Councillor; 

 
x.  the provision and maintenance on the site of not less than 7 new rental replacement dwelling units as rental housing units for at least 20 years, comprising 4 one-bedroom and 3 two-bedroom units with affordable rents. The rental replacement dwelling units shall generally be of the same type and size as contained in the existing buildings on the subject site at the date of enactment of the zoning by-law amendment. The applicant shall provide tenant relocation assistance for tenants in the existing buildings in accordance with the detailed terms as set out in the draft zoning by-law amendment attached as Attachment 5 to the report (March 21, 2017) from the Chief Planer and Executive Director, City Planning; and
 

xii.  the Owner shall construct and maintain the development in accordance with Tier 1 (and Tier 2 if applicable) performance measures of the updated Toronto Green Standard, as adopted by Toronto City Council at its meeting held on July 16, 2013;

 

xiii. the superstructure of the office tower, within the meaning of the Ontario Building Code, will be completed and the Social Facility Space will be completed and conveyed to the City prior to any residential occupancy of the proposed residential condominium or occupancy of the proposed office tower, whichever is earlier;

  

b.  The following matters are also recommended to be secured in the Section 37 Agreement as a legal convenience to support development:

 

i.  the area of the "Social Facility Space" in the amount of 324.59 square metres, as proposed in the development proposal at 5220-5254 Yonge Street (referenced as Planning Applications: 09 165755 NNY 23 OZ, Site Plan Application: 10 247876 NNY 23 SA, Rental Housing Demolition Application: 09 165759 NNY 00 RH) shall be exempt from the payment of Development Charges at the time of building permit issuance for the development proposal. The Section 37 Agreement in relation to the development proposal shall require the owner to secure the development charge otherwise payable until such time as the Social Facility Space is conveyed to the City;  

 
ii.  prior to the issuance of final site plan approval, the Owner agrees to convey to the City to the satisfaction of the City Solicitor, for nominal consideration, an east-west pedestrian access easement; 
 

iii.  the City shall be entitled to program the pedestrian access easement area for public open space uses congruent with the uses of the Social Facility Space;
 

iv.  the Pedestrian Mews shall provide a pedestrian access easement for members of the public to visit the mews area to attend City programming of the easement area and for members of the public to access the Social Facility Space, Young Hearts Child Care Centre at 5176 Yonge Street and Gibson House Museum at 5172 Yonge Street;
 

v.  the easement for the Pedestrian Mews shall be provided on the terms and conditions set out in the revised Term Sheet for Social Facility Space attached to motion 1a by Councillor Shiner;
 

vi.  the Owner shall relocate the existing 900 mm storm sewer as shown on the Proposed Site Servicing Plan C-5, prepared by R. V. Anderson Associates Limited, dated December 28, 2016, by installing a new 900 mm storm sewer, connecting to the City's existing storm sewer at the southwest corner of the Site and travelling northbound within the Site along its western boundary within a 9.0 metre wide easement to connect to a proposed 2134 mm x 3048 mm concrete box culvert and a 600 mm concrete pipe on Ellerslie Avenue, ultimately connecting  to the existing 1200 mm storm concrete pipe on Yonge Street;
 

vii.  the Owner shall enter into a Municipal Infrastructure Agreement with the City prior to the commencement of the works described in Part 3.b.vi. above;
 

viii.  the Owner acknowledges that installation of the works described in Part 3.b.vi. above will require adjustments to the elevation of lands immediately to the west of the Development (55 Ellerslie Avenue) and installations related thereto. The Owner acknowledges and agrees that the City will not enter into a Municipal Infrastructure Agreement with the Owner and will not permit work to commence with respect to proposed municipal infrastructure that requires adjustments to the elevation of lands immediately to the west of the Development unless the Owner provides written permission from the owner of such lands authorizing the Owner to adjust the grades of such lands;
 

ix.  in the event that the installation of the services described in Part 3.b.vi. above is not feasible as a result of conflicts between the proposed municipal storm sewer and existing municipal sewers, watermains and utilities located on Ellerslie Avenue, the Owner acknowledges that redesign of the servicing requirements may be required, which redesign may require the Owner to relocate part or all of the municipal storm sewer currently proposed within Ellerslie Avenue onto the Site itself. In this regard the Owner acknowledges that revisions to the built form of the Development may be required and that the City is not bound by this Agreement to accept zoning revisions that may be required to accomplish a redesign of the proposed servicing approach;
 

x.  prior to entering into a Municipal Infrastructure Agreement, the Owner shall submit a financial guarantee to secure the completion of such works in the form of an irrevocable letter of credit or certified cheque in the amount of $1,810,000.00 to the City of Toronto; 
 

xi.  prior to entering into a Municipal Infrastructure Agreement, the Owner shall provide, a payment of $102,265.00 to Engineering and Construction Services, representing the 5 percent Engineering and Inspection Review Fee;

 
xii.  prior to entering into a Municipal Infrastructure Agreement, the Owner shall provide a payment of $125,000 to the City towards the cost of maintenance of the facilities described in Part 3.b.vi. above;
 

xiii.  the Owner agrees that it shall not apply for and shall not be entitled to a Building Permit, including a permit for excavation, piling or shoring with respect to the Development until it has completed construction of the proposed municipal sewer described in Part 3.b.vi. above and the proposed municipal sewer is determined to be operational by the Director, Engineering and Construction Services;
 

xiv.  the Owner shall design and install an overland flow route to accept surface stormwater overland flow from Ellerslie Avenue at the northwest corner of the Site, travelling southbound within the Site along the proposed private lane and then eastbound below the raised walkway surface of the proposed Pedestrian Mews to Yonge Street. The Owner shall provide appropriate safeguards and necessary grading modifications in order to protect all adjacent properties while maintaining the overland flow route along the west edge of the subject property. The owners on title to the Site, with the exception of the City as owner, shall have primary responsibility to maintain and repair the areas subject to surface stormwater flow;
 

xv.  prior to site plan approval, the Owner shall transfer a storm sewer easement to the City, to the satisfaction of the City Solicitor, relating to the storm sewer referenced in Part 3.b.xiii. above;
 

xvi.  prior to site plan approval, the Owner shall transfer a surface stormwater flow easement to the City, to the satisfaction of the City Solicitor, relating to the surface stormwater flow area referenced in Part 3.b.xiii. above;
 

xvii.  prior to site plan approval, the Owner shall make arrangements satisfactory to the Director, Engineering and Construction Services and the City Solicitor to reconfigure the existing sanitary sewer easement, relating to required modifications to the existing municipal sanitary sewer located at the southwest corner of these lands as shown on the Proposed Site Servicing Plan C-5, prepared by R. V. Anderson Associates Limited, dated December 28, 2016;
 

xviii.  notwithstanding the grant of the surface stormwater easement, the Owner and its successors in title, with the exception of the City as owner, shall be responsible and the City shall not be responsible for the ongoing functionality, maintenance or repair of the areas designed to carry surface stormwater on the Site. In the event that the City determines, in its sole discretion, to access such areas, this shall be limited to addressing emergency circumstances, the City shall provide the Owner with advance notice thereof, but the City will not be responsible to reinstate the installed surface over which stormwater flows. Further, the Owner agrees that, should the City determine that the problem arose as a result of lack of maintenance or improper maintenance by the Owner, the City shall be entitled to charge back the cost of such emergency response measures to the Owner;
 

xix.  the Owner, with the exception of City as owner, hereby indemnifies the City with respect to claims made by third parties for damages or for personal injury which may arise from the installation, maintenance and effectiveness of the surface stormwater facilities as described in this Agreement; 
 

xx.  prior to the occupancy of any unit within the Development, the Owner shall convey to the satisfaction of the City Solicitor and the Director, Engineering and Construction Services a pedestrian and vehicular access easement across the north-south driveway shown on the Ground Floor Plan A2.6 prepared by Kirkor Architects and Planners and dated December 28, 2016  adjacent to the western property line of the Site to provide access to Young Hearts Child Care Centre at 5176 Yonge Street and Gibson House Museum at 5172 Yonge Street;
 

xxi.  in the event that the proposed inlet grating on Ellerslie Avenue draining into the proposed 2134 mm x 3048 mm concrete box culvert and a 600 mm concrete pipe on Ellerslie Avenue needs to be redesigned, including its possible relocation, the Owner agrees to attend to this to the satisfaction of the Executive Director, Engineering and Construction Services at no cost to the City;
 

xxii.  prior to the issuance of the first above-grade building permit for the lands, the Owner shall provide the following: 

 
a.  a letter of credit in the amount of $1,200,000 dollars, being the full value of the unfinished Social Facility Space; and

 
b.  a letter of credit in the amount of $1,300,000 dollars, being 125 percent of the full value of the estimated costs to finish the Social Facility Space;

 
xxiii.  prior to the issuance of any building permit, including a permit for excavation, piling or shoring with respect to the Development, a letter of credit in the amount of $1,810,000 dollars, to secure the completion of the works required to relocate the existing 900mm storm sewer, plus an engineering fee of $102,000 and a maintenance fee of $125,000 -- all of which  relate to relocation of the existing storm sewer, which facility is characterized as a matter required to implement the development of the proposal and not as a community benefit; and

  
xxiv.  prior to site plan approval, the Owner shall provide to the City a letter of credit in  an amount sufficient to construct and finish the east-west  pedestrian access easement to be conveyed to the City as provided in Part 3.b. above. 
 

4.  City Council approve the application to demolish the existing residential buildings that contain 7 existing rental dwelling units located at 5250, 5252 and 5254 Yonge Street pursuant to Municipal Code Chapters 667 and 363 subject to the following conditions under Chapter 667 which provide for replacement of the rental dwelling units:

 

i.  the owner shall provide and maintain 7 rental replacement dwelling units comprising of 4 one-bedroom and 3 two-bedroom units in the development and as illustrated in the floor plans dated November 3, 2016 provided by the applicant, for a period of at least 20 years. All 7 rental replacement dwelling units shall have affordable rents for at least 10 years beginning from the date that each rental replacement dwelling unit is first occupied.
 

5.  City Council approve in principle the Term Sheet attached motion 1a by Councillor Shiner, regarding the provision of Social Facility Space, subject to any further amendments to the Term Sheet as deemed appropriate by the Director, Real Estate Services in consultation with the local Councillor, and the terms be incorporated into the Section 37 Agreement.

 

6.  City Council approve in principle the plans as indicated on the drawings noted in Attachment 6 to the report (March 21, 2017) from the Chief Planner and Executive Director, City Planning, subject to the Draft Conditions of Site Plan Approval listed in Attachment 6 to the report (March 21, 2017) from the Chief Planner and Executive Director, City Planning.

 

7.  City Council delegate back to the Chief Planner and Executive Director, City Planning or designate the authority to issue final Site Plan Approval.

 

8.  City Council authorize City officials to take all necessary steps, including the execution of agreements and documents, to give effect to Council's decision.

 

9.  City Council determine that no further notice be required under Sections 17 and 34(17) of the Planning Act given the minor revisions to the draft bills.

 

10.  City Council request the Deputy City Manager, Cluster B to monitor the status of this application and City Council authorize the Deputy City Manager to bring forward any further reports to City Council should there be any concerns or issues in implementing the conditions and/or requirements of this development application.

Background Information (City Council)

Member Motion MM27.47
https://www.toronto.ca/legdocs/mmis/2017/mm/bgrd/backgroundfile-102226.pdf
(March 21, 2017) Report from the Chief Planner and Executive Director, City Planning Division on 5220-5254 Yonge Street, 78 Ellerslie Avenue, 32 Churchill Avenue and 55 Horsham Avenue - Official Plan, Zoning, Site Plan, and Rental Housing Demolition Applications
https://www.toronto.ca/legdocs/mmis/2017/mm/bgrd/backgroundfile-102227.pdf
Revised Term Sheet attached to motion 1a by Councillor Shiner
https://www.toronto.ca/legdocs/mmis/2017/mm/bgrd/backgroundfile-102506.pdf

Communications (City Council)

(March 27, 2017) Letter from Joel D. Farber, Fogler Rubinoff LLP on behalf of G Group 5220 Yonge Ltd. (MM.New.MM27.47.1)
https://www.toronto.ca/legdocs/mmis/2017/mm/comm/communicationfile-67917.pdf

Motions (City Council)

Motion to Waive Referral (Carried)

Speaker Nunziata advised Council that the provisions of Chapter 27, Council Procedures, require that Motion MM27.47 be referred to the North York Community Council. A two-thirds vote of the Council Members present is required to waive referral.

Vote (Waive Referral) Mar-29-2017 5:29 PM

Result: Carried Two-Thirds Required - MM27.47 - Waive referral
Total members that voted Yes: 35 Members that voted Yes are Paul Ainslie, Maria Augimeri, Ana Bailão, Jon Burnside, John Campbell, Christin Carmichael Greb, Joe Cressy, Janet Davis, Glenn De Baeremaeker, Justin J. Di Ciano, Frank Di Giorgio, Sarah Doucette, John Filion, Paula Fletcher, Michael Ford, Mary Fragedakis, Mark Grimes, Michelle Holland, Stephen Holyday, Jim Karygiannis, Norman Kelly, Chin Lee, Giorgio Mammoliti, Josh Matlow, Pam McConnell, Mary-Margaret McMahon, Joe Mihevc, Frances Nunziata (Chair), Cesar Palacio, Gord Perks, Anthony Perruzza, Jaye Robinson, Neethan Shan, David Shiner, Michael Thompson
Total members that voted No: 0 Members that voted No are
Total members that were Absent: 10 Members that were absent are Shelley Carroll, Josh Colle, Gary Crawford, Vincent Crisanti, Mike Layton, Denzil Minnan-Wong, Ron Moeser, James Pasternak, John Tory, Kristyn Wong-Tam

1a - Motion to Adopt Item as Amended moved by Councillor David Shiner (Carried)

That City Council amend its decision of July 11, 12 and 13, 2012 (NY 17.45) by deleting Part 4.a.iv and deleting Parts 1, 2, 4.a.v, 4.a.ix, 4.a.x, 5.i, 7, 9, 10 and replacing them with the following:

 

1.  City Council amend the North York Centre Secondary Plan, substantially in accordance with the draft Official Plan Amendment attached as Attachment No. 4 to the report (March 21, 2017) from the Chief Planner and Executive Director, City Planning.

 
2.  City Council amend North York Zoning By-law No. 7625, substantially in accordance with the draft Zoning By-law Amendment attached as Attachment No. 5 to the report (March 21, 2017) from the Chief Planner and Executive Director, City Planning.

 
3.  Before introducing the necessary Bills for the Official Plan and Zoning By-law Amendments to City Council for enactment:
 

a.  the owner shall enter into an agreement with the City pursuant to Section 37 of the Planning Act, to the satisfaction of the Chief Planner and City Solicitor, to secure and provide the facilities, services and/or matters as generally outlined below:

 

v.  a minimum of 31.99 square metres for a bicycle shower and change facility, located below grade;

 
ix.  the provision of a minimum of 324.59 square metres of Social Facility Space for the City fronting on an east-west publicly accessible mews, substantially in accordance with revised Term Sheet attached to this motion and any further amendments as deemed appropriate by the Director of Real Estate Services, in consultation with the local Councillor; 

 
x.  The provision and maintenance on the site of not less than 7 new rental replacement dwelling units as rental housing units for at least 20 years, comprising 4 one-bedroom and 3 two-bedroom units with affordable rents. The rental replacement dwelling units shall generally be of the same type and size as contained in the existing buildings on the subject site at the date of enactment of the zoning by-law amendment. The applicant shall provide tenant relocation assistance for tenants in the existing buildings in accordance with the detailed terms as set out in the draft zoning by-law amendment attached as Attachment No. 5; and
 

xii.  The Owner shall construct and maintain the development in accordance with Tier 1 (and Tier 2 if applicable) performance measures of the updated Toronto Green Standard, as adopted by Toronto City Council at its meeting held on July 16, 2013;

 

xiii. The superstructure of the office tower, within the meaning of the Ontario Building Code, will be completed and the Social Facility Space will be completed and conveyed to the City prior to any residential occupancy of the proposed residential condominium or occupancy of the proposed office tower, whichever is earlier;

  

b.  The following matters are also recommended to be secured in the Section 37 Agreement as a legal convenience to support development:

 

i.  The area of the "Social Facility Space" in the amount of 324.59 square metres, as proposed in the development proposal at 5220-5254 Yonge Street (referenced as Planning Applications: 09 165755 NNY 23 OZ, Site Plan Application: 10 247876 NNY 23 SA, Rental Housing Demolition Application: 09 165759 NNY 00 RH) shall be exempt from the payment of Development Charges at the time of building permit issuance for the development proposal. The Section 37 Agreement in relation to the development proposal shall require the owner to secure the development charge otherwise payable until such time as the Social Facility Space is conveyed to the City;  

 
ii.  Prior to the issuance of final site plan approval, the Owner agrees to convey to the City to the satisfaction of the City Solicitor, for nominal consideration, an east-west pedestrian access easement; 
 

iii.  The City shall be entitled to program the pedestrian access easement area for public open space uses congruent with the uses of the Social Facility Space;
 

iv.  The Pedestrian Mews shall provide a pedestrian access easement for members of the public to visit the mews area to attend City programming of the easement area and for members of the public to access the Social Facility Space, Young Hearts Child Care Centre at 5176 Yonge Street and Gibson House Museum at 5172 Yonge Street;
 

v.  The easement for the Pedestrian Mews shall be provided on the terms and conditions set out in the revised Term Sheet for Social Facility Space attached to this motion;
 

vi.  The Owner shall relocate the existing 900 mm storm sewer as shown on the Proposed Site Servicing Plan C-5, prepared by R. V. Anderson Associates Limited, dated December 28, 2016, by installing a new 900 mm storm sewer, connecting to the City's existing storm sewer at the southwest corner of the Site and travelling northbound within the Site along its western boundary within a 9.0m wide easement to connect to a proposed 2134 mm x 3048 mm concrete box culvert and a 600 mm concrete pipe on Ellerslie Avenue, ultimately connecting  to the existing 1200 mm storm concrete pipe on Yonge Street;
 

vii.  The Owner shall enter into a Municipal Infrastructure Agreement with the City prior to the commencement of the works described in (vi);
 

viii.  The Owner acknowledges that installation of the works described in section (vi) will require adjustments to the elevation of lands immediately to the west of the Development (55 Ellerslie Avenue) and installations related thereto. The Owner acknowledges and agrees that the City will not enter into a Municipal Infrastructure Agreement with the Owner and will not permit work to commence with respect to proposed municipal infrastructure that requires adjustments to the elevation of lands immediately to the west of the Development unless the Owner provides written permission from the owner of such lands authorizing the Owner to adjust the grades of such lands;
 

ix.  In the event that the installation of the services described in section (vi) is not feasible as a result of conflicts between the proposed municipal storm sewer and existing municipal sewers, watermains and utilities located on Ellerslie Avenue, the Owner acknowledges that redesign of the servicing requirements may be required, which redesign may require the Owner to relocate part or all of the municipal storm sewer currently proposed within Ellerslie Avenue onto the Site itself. In this regard the Owner acknowledges that revisions to the built form of the Development may be required and that the City is not bound by this Agreement to accept zoning revisions that may be required to accomplish a redesign of the proposed servicing approach.
 

x.  Prior to entering into a Municipal Infrastructure Agreement, the Owner shall submit a financial guarantee to secure the completion of such works in the form of an irrevocable letter of credit or certified cheque in the amount of $1,810,000.00 to the City of Toronto; 
 

xi.  Prior to entering into a Municipal Infrastructure Agreement, the Owner shall provide, a payment of $102,265.00 to Engineering and Construction Services, representing the 5% Engineering & Inspection Review Fee;

 
xii.  Prior to entering into a Municipal Infrastructure Agreement, the Owner shall provide a payment of $125,000 to the City towards the cost of maintenance of the facilities described in (vi);
 

xiii.  The Owner agrees that it shall not apply for and shall not be entitled to a Building Permit, including a permit for excavation, piling or shoring with respect to the Development until it has completed construction of the proposed municipal sewer described in (vi) and the proposed municipal sewer is determined to be operational by the Director, Engineering and Construction Services;
 

xiv.  The Owner shall design and install an overland flow route to accept surface stormwater overland flow from Ellerslie Avenue at the northwest corner of the Site, travelling southbound within the Site along the proposed private lane and then eastbound below the raised walkway surface of the proposed Pedestrian Mews to Yonge Street. The Owner shall provide appropriate safeguards and necessary grading modifications in order to protect all adjacent properties while maintaining the overland flow route along the west edge of the subject property. The owners on title to the Site, with the exception of the City as owner, shall have primary responsibility to maintain and repair the areas subject to surface stormwater flow;
 

xv.  Prior to site plan approval, the Owner shall transfer a storm sewer easement to the City, to the satisfaction of the City Solicitor, relating to the storm sewer referenced in (xiii);
 

xvi.  Prior to site plan approval, the Owner shall transfer a surface stormwater flow easement to the City, to the satisfaction of the City Solicitor, relating to the surface stormwater flow area referenced in (xiii);
 

xvii.  Prior to site plan approval, the Owner shall make arrangements satisfactory to the Director, Engineering and Construction Services and the City Solicitor to reconfigure the existing sanitary sewer easement, relating to required modifications to the existing municipal sanitary sewer located at the south west corner of these lands as shown on the Proposed Site Servicing Plan C-5, prepared by R. V. Anderson Associates Limited, dated December 28, 2016;
 

xviii.  Notwithstanding the grant of the surface stormwater easement, the Owner and its successors in title, with the exception of the City as owner, shall be responsible and the City shall not be responsible for the ongoing functionality, maintenance or repair of the areas designed to carry surface stormwater on the Site. In the event that the City determines, in its sole discretion, to access such areas, this shall be limited to addressing emergency circumstances, the City shall provide the Owner with advance notice thereof, but the City will not be responsible to reinstate the installed surface over which stormwater flows. Further, the Owner agrees that, should the City determine that the problem arose as a result of lack of maintenance or improper maintenance by the Owner, the City shall be entitled to charge back the cost of such emergency response measures to the Owner;
 

xix.  The Owner, with the exception of City as owner, hereby indemnifies the City with respect to claims made by third parties for damages or for personal injury which may arise from the installation, maintenance and effectiveness of the surface stormwater facilities as described in this Agreement; 
 

xx.  Prior to the occupancy of any unit within the Development, the Owner shall convey to the satisfaction of the City Solicitor and the Director of Engineering and Construction Services a pedestrian and vehicular access easement across the north-south driveway shown on the Ground Floor Plan A2.6 prepared by Kirkor Architects and Planners and dated December 28, 2016  adjacent to the western property line of the Site to provide access to Young Hearts Child Care Centre at 5176 Yonge Street and Gibson House Museum at 5172 Yonge Street;
 

xxi.  In the event that the proposed inlet grating on Ellerslie Ave draining into the proposed 2134 mm x 3048 mm concrete box culvert and a 600 mm concrete pipe on Ellerslie Avenue needs to be redesigned, including its possible relocation, the Owner agrees to attend to this to the satisfaction of the Executive Director, ECS at no cost to the City;
 

xxii.  Prior to the issuance of the first above-grade building permit for the lands, the owner shall provide the following: 

 
a.  A letter of credit in the amount of $1,200,000 dollars, being the full value of the unfinished Social Facility Space; and

 
b.  A letter of credit in the amount of $1,300,000 dollars, being 125% of the full value of the estimated costs to finish the Social Facility Space.

 
xxiii.  Prior to the issuance of any Building Permit, including a permit for excavation, piling or shoring with respect to the Development, a letter of credit in the amount of $1,810,000 dollars, to secure the completion of the works required to relocate the existing 900mm storm sewer, plus an engineering fee of $102,000 and a maintenance fee of $125,000 -- all of which  relate to relocation of the existing storm sewer, which facility is characterized as a matter required to implement the development of the proposal and not as a community benefit; and

  
xxiv.  Prior to site plan approval, the Owner shall provide to the City a letter of credit in  an amount sufficient to construct and finish the east-west  pedestrian access easement to be conveyed to the City as provided in Recommendation 3 b. 
 

4.  City Council approve the application to demolish the existing residential buildings that contain 7 existing rental dwelling units located at 5250, 5252 and 5254 Yonge Street pursuant to Municipal Code Chapters 667 and 363 subject to the following conditions under Chapter 667 which provide for replacement of the rental dwelling units:

 

i.  the owner shall provide and maintain 7 rental replacement dwelling units comprising of 4 one-bedroom and 3 two-bedroom units in the development and as illustrated in the floor plans dated November 3, 2016 provided by the applicant, for a period of at least 20 years. All 7 rental replacement dwelling units shall have affordable rents for at least 10 years beginning from the date that each rental replacement dwelling unit is first occupied;
 

5.  City Council approve in principle the Term Sheet attached to this motion, regarding the provision of Social Facility Space, subject to any further amendments to the Term Sheet as deemed appropriate by the Director of Real Estate in consultation with the local Councillor, and the terms be incorporated into the Section 37 agreement.

 

6.  City Council approve in principle the plans as indicated on the drawings noted in Attachment 6 to the report (March 21, 2017) from the Chief Planner and Executive Director, City Planning, subject to the Draft Conditions of Site Plan Approval listed in Attachment 6.

 

7.  City Council delegate back to the Chief Planner and Executive Director, City Planning, or her designate the authority to issue final Site Plan Approval.

 

8.  City Council authorizes City officials to take all necessary steps, including the execution of agreements and documents, to give effect to the above-noted recommendations.

 

9.  City Council determine that no further notice be required under Sections 17 and 34(17) of the Planning Act given the minor revisions to the draft bills.

Vote (Adopt Item as Amended) Mar-29-2017 6:44 PM

Result: Carried Majority Required - MM27.47 - Shiner - motion 1a
Total members that voted Yes: 35 Members that voted Yes are Paul Ainslie, Maria Augimeri, Ana Bailão, Jon Burnside, John Campbell, Christin Carmichael Greb, Gary Crawford, Joe Cressy, Vincent Crisanti, Janet Davis, Glenn De Baeremaeker, Justin J. Di Ciano, Frank Di Giorgio, Sarah Doucette, John Filion, Paula Fletcher, Michael Ford, Mary Fragedakis, Mark Grimes, Stephen Holyday, Jim Karygiannis, Norman Kelly, Mike Layton, Chin Lee, Josh Matlow, Pam McConnell, Mary-Margaret McMahon, Joe Mihevc, Frances Nunziata (Chair), Cesar Palacio, Gord Perks, Anthony Perruzza, Neethan Shan, David Shiner, Michael Thompson
Total members that voted No: 0 Members that voted No are
Total members that were Absent: 10 Members that were absent are Shelley Carroll, Josh Colle, Michelle Holland, Giorgio Mammoliti, Denzil Minnan-Wong, Ron Moeser, James Pasternak, Jaye Robinson, John Tory, Kristyn Wong-Tam

1b - Motion to Adopt Item as Amended moved by Councillor David Shiner (Carried)

That City Council request the Deputy City Manager, Cluster B to monitor the status of this application and the Deputy City Manager be authorized to bring forward any further reports to City Council should there be any concerns or issues in implementing the conditions and/or requirements of this development application.

Vote (Adopt Item as Amended) Mar-29-2017 6:46 PM

Result: Carried Majority Required - MM27.47 - Shiner - motion 1b
Total members that voted Yes: 35 Members that voted Yes are Paul Ainslie, Maria Augimeri, Ana Bailão, Jon Burnside, John Campbell, Christin Carmichael Greb, Gary Crawford, Joe Cressy, Vincent Crisanti, Janet Davis, Glenn De Baeremaeker, Justin J. Di Ciano, Frank Di Giorgio, Sarah Doucette, John Filion, Paula Fletcher, Michael Ford, Mary Fragedakis, Mark Grimes, Stephen Holyday, Jim Karygiannis, Norman Kelly, Mike Layton, Chin Lee, Josh Matlow, Pam McConnell, Mary-Margaret McMahon, Joe Mihevc, Frances Nunziata (Chair), Cesar Palacio, Gord Perks, Anthony Perruzza, Neethan Shan, David Shiner, Michael Thompson
Total members that voted No: 0 Members that voted No are
Total members that were Absent: 10 Members that were absent are Shelley Carroll, Josh Colle, Michelle Holland, Giorgio Mammoliti, Denzil Minnan-Wong, Ron Moeser, James Pasternak, Jaye Robinson, John Tory, Kristyn Wong-Tam