EX29.25 - Operating Variance Report for the Nine Month Period Ended September 30, 2017

Decision Type:
ACTION
Status:
Amended
Wards:
All

City Council Decision

City Council on December 5, 6, 7 and 8, 2017, adopted the following:

 

1.  City Council approve the budget adjustments detailed in Appendix F to the report (November 20, 2017) from the Interim Chief Financial Officer to amend the 2017 Approved Operating Budget between Programs that have no impact to the 2017 Approved Net Operating Budget of the City.

 

2.  City Council direct that City Programs and Agencies projecting year-end over-spending continue to identify and undertake mitigation strategies to address projected year-end over-expenditures.

 

3.  City Council authorize the Treasurer to advance $3.9 million from the City's working capital to the Toronto Zoo to finance 2017 payroll and other obligations.

 

4.  City Council direct that, upon City Council approval of the Operating Variance Report for the Twelve Month Period Ending December 31, 2017, the advance to the Toronto Zoo be repaid to working capital as part of the year end settlements.

Background Information (Committee)

(November 20, 2017) Report and Appendices A to G from the Acting Chief Financial Officer on Operating Variance Report for the Nine Month Period Ended September 30, 2017
https://www.toronto.ca/legdocs/mmis/2017/ex/bgrd/backgroundfile-109109.pdf

Background Information (City Council)

(December 5, 2017) Supplementary report from the Interim Chief Financial Officer on Cash Advance to the Toronto Zoo (EX29.25b)
https://www.toronto.ca/legdocs/mmis/2017/cc/bgrd/backgroundfile-109784.pdf

Motions (City Council)

1 - Motion to Amend Item (Additional) moved by Councillor Gord Perks (Carried)

That City Council adopt the following recommendations contained in the supplementary report (December 5, 2017) from the Interim Chief Financial Officer [EX29.25b]:

 

1. The Treasurer be authorized to advance $3.9 million from the City's working capital to the Toronto Zoo to finance 2017 payroll and other obligations.

 

2. Upon Council approval of the Operating Variance Report for the Twelve Month Period Ending December 31, 2017, the advance to the Toronto Zoo be repaid to working capital as part of the year end settlements.

Vote (Amend Item (Additional)) Dec-07-2017 2:24 PM

Result: Carried Majority Required - EX29.25 - Perks - motion 1
Total members that voted Yes: 31 Members that voted Yes are Paul Ainslie, Maria Augimeri, Ana Bailão, Jon Burnside, John Campbell, Christin Carmichael Greb, Shelley Carroll, Gary Crawford, Joe Cressy, Janet Davis, Justin J. Di Ciano, Frank Di Giorgio, Sarah Doucette, Jim Hart, Jim Karygiannis, Norman Kelly, Mike Layton, Chin Lee, Giorgio Mammoliti, Mary-Margaret McMahon, Joe Mihevc, Denzil Minnan-Wong, Frances Nunziata (Chair), Cesar Palacio, Gord Perks, Anthony Perruzza, Jaye Robinson, Neethan Shan, John Tory, Lucy Troisi, Kristyn Wong-Tam
Total members that voted No: 9 Members that voted No are Glenn De Baeremaeker, John Filion, Paula Fletcher, Michael Ford, Mary Fragedakis, Stephen Holyday, Josh Matlow, James Pasternak, David Shiner
Total members that were Absent: 5 Members that were absent are Josh Colle, Vincent Crisanti, Mark Grimes, Michelle Holland, Michael Thompson

Motion to Adopt Item as Amended (Carried)

Vote (Adopt Item as Amended) Dec-07-2017 2:25 PM

Result: Carried Majority Required - EX29.25 - Adopt the item as amended
Total members that voted Yes: 37 Members that voted Yes are Paul Ainslie, Maria Augimeri, Ana Bailão, Jon Burnside, John Campbell, Christin Carmichael Greb, Shelley Carroll, Gary Crawford, Joe Cressy, Janet Davis, Glenn De Baeremaeker, Justin J. Di Ciano, Frank Di Giorgio, Sarah Doucette, John Filion, Michael Ford, Jim Hart, Stephen Holyday, Jim Karygiannis, Norman Kelly, Mike Layton, Chin Lee, Giorgio Mammoliti, Mary-Margaret McMahon, Joe Mihevc, Denzil Minnan-Wong, Frances Nunziata (Chair), Cesar Palacio, James Pasternak, Gord Perks, Anthony Perruzza, Jaye Robinson, Neethan Shan, David Shiner, John Tory, Lucy Troisi, Kristyn Wong-Tam
Total members that voted No: 3 Members that voted No are Paula Fletcher, Mary Fragedakis, Josh Matlow
Total members that were Absent: 5 Members that were absent are Josh Colle, Vincent Crisanti, Mark Grimes, Michelle Holland, Michael Thompson

25a - Operating Variance Report for the Nine Month Period Ended September 30, 2017

Background Information (Committee)
(November 27, 2017) Letter from the Budget Committee on Operating Variance Report for the Nine Month Period Ended September 30, 2017
https://www.toronto.ca/legdocs/mmis/2017/ex/bgrd/backgroundfile-109451.pdf

EX29.25 - Operating Variance Report for the Nine Month Period Ended September 30, 2017

Decision Type:
ACTION
Status:
Adopted
Wards:
All

Committee Recommendations

The Executive Committee recommends that:

 

1.  City Council approve the budget adjustments detailed in Appendix F to the report (November 20, 2017) from the Acting Chief Financial Officer to amend the 2017 Approved Operating Budget between Programs that have no impact to the 2017 Approved Net Operating Budget of the City.

 

2.  City Programs and Agencies projecting year-end over-spending continue to identify and undertake mitigation strategies to address projected year-end over-expenditures.

Origin

(November 20, 2017) Report from the Acting Chief Financial Officer

Summary

The purpose of this report is to provide City Council with the operating variance for the nine month period ended September 30, 2017 as well as projections to year-end. This report also requests City Council's approval for amendments to the 2017 Approved Operating Budget between Programs that have no impact on the City's 2017 Approved Net Operating Budget.

 

The following table summarizes the financial position of Tax Supported Operations as of the third fiscal quarter and projection at year-end:

 

Figure 1: Tax Supported Operating Net Variance Summary ($ Millions)

 

Variance

September 30, 2017

Over/(Under)

Projected Y/E 2017

Over/(Under)

$

%

$

%

Gross Expenditures

(181.4)

-2.4%

(193.4)

-1.8%

Revenues

66.7

1.4%

(51.6)

-0.8%

Net Expenditures

(248.1)

-8.3%

(141.8)

-3.5%

Less: Toronto Building

(16.8)

201.3%

(12.5)

117.0%

Less: Children's Services

(8.6)

12.9

(12.0)

14.9%

Net Expenditures (Excl. Toronto Building and Children's Services)

(222.8)

-7.6%

(117.3)

-3.0%

 

In accordance with the Building Code Act, the surplus from Toronto Building must be contributed to the Building Code Act Service Improvement Reserve Fund to create and maintain systems and processes which enable service delivery timelines and reporting requirements of the Province's Bill 124, Building Code Statute Law Amendment Act, and 2002 Legislation to be met.

 

It is important to note, Children's Services year-end under-expenditure of $12.000 million net is related to Provincial / Federal growth funding to provide 825 new child care subsidies to support growth as directed by City Council on July 4, 2017 (EX26.30). A corresponding in-year adjustment is included in the Appendix F of the report for a one-time contribution to the Child Care Expansion Reserve Fund.

 

Year-to-Date Spending Results:

 

As noted in Figure 1 above, for the nine month period ended September 30, 2017, Tax Supported Operations reported a favourable net variance of $248.103 million or 8.3 percent and are projecting a year-end surplus of $141.822 million or 3.5 percent.

 

The year-to-date net under-spending was primarily driven by:

 

- Over-achieved Municipal Land Transfer Tax revenue due to higher than anticipated real estate market activity ($93.809 million net).
 

- Under-expenditure by the Toronto Transit Commission of $80.356 million net primarily as a result of lower departmental material expenditures, labour costs, and accident claims of $67.755 million net within Conventional Service, and fewer customer journeys than planned within Wheel Trans of $12.601 million net.
 

- Under-spending by Transportation Services driven by lower contract costs and decreased salt usage in the winter maintenance program ($18.103 million net).
 

- Over-achieved revenue in Toronto Building primarily due to the increasing number of building permit applications ($16.792 million net).
 

- Increased revenue from Supplementary Taxes due to a change in the historical supplementary roll delivery date compared to plan ($15.936 million net).
 

Favourable variances in other Programs and Agencies are primarily due to under-spending in salaries and benefits as a result of vacant positions. The majority of the vacant positions are expected to be filled by year-end, while other new vacant positions may occur throughout the system. More detailed explanations at the Program / Agency level can be found in the complement section of this report.

 

Year-End Spending Projections:

 

Based on this current trend, the City is projecting a net favourable year-end variance of $141.822 million or 3.5 percent. The key drivers for the expected year-end net position are largely due to the following:

 

- Higher than budgeted Municipal Land Transfer Tax revenue as a result of higher than expected sales revenue ($85.000 million net).
 

- Toronto Transit Commission - Conventional Service's under-spending of $35.076 million net is mainly related to labour expenses, employee benefits, PRESTO fees, lower diesel fuel consumption, utilities, depreciation, which are partially offset by passenger revenue increase due to the current trend of customers switching from pass-based fare media to single-ride fare media, and not requiring the budgeted reserve draw of $14.000 million. While, Wheel - Trans Service favourable variance of $14.259 million net is attributed to fewer customer journeys than budgeted. As a whole, Toronto Transit Commission is projecting a favourable year-end variance of $49.335 million net.
 

Consistent with the City's financial management practices and policies, Programs and Agencies projecting an unfavourable year-end variance are required to identify and implement mitigation strategies where possible to address any projected shortfalls.

 

It is important to note that the City's projected year-end under-spending of $141.822 million is primarily attributed to the projected higher Municipal Land Transfer Tax revenues of $85.000 million. After isolating Toronto Building projected net revenue, Municipal Land Transfer Tax over-achieved revenue accounts for 66 percent of the total City's favourable variance for year-end.

 

Rate Supported Programs:

 

As noted in Figure 2 below, for the nine month period ended September 30, 2017, Rate Supported Operations reported a favourable net variance of $14.431 million or 34.3 percent and are projecting a year-end surplus of $2.886 million.

 

Figure 2: Rate Supported Net Variance Summary ($ Millions)

 

Rate Supported Programs

September 30, 2017

Projected Y/E 2017

Over/(Under)

Over/(Under)

Solid Waste Management Services

2.6

(1.3)

Toronto Parking Authority

0.3

0.7

Toronto Water

(17.4)

(2.2)

Total Variance

(14.4)

(2.9)

 

The key year-to-date net under-spending in Rate Supported Program was driven by:

 

The negative variance in Solid Waste Management Services of $2.628 million net or 30.4 percent is primarily due to over-spending on contracted services, inter-divisional charges for fleet maintenance, debt service charges as well as earlier than planned reserve contributions.
 

The negative revenue in Toronto Parking Authority of $0.306 million net or 0.7 percent is primarily due to lower than planned off-street parking revenues and loss of sponsorship revenue in the Bike Share Program.

 
The positive revenue in Toronto Water of $17.365 million net is primarily due to advance postings of sale of water and industrial waste agreement revenues, as well as an overall increase in the volume demand for new sewer service connections and private water agreements.
 

Complement:

 

Figure 3: 2017 Year-To-Date Vacancy Rate

 

Program/Agency

2017 Year-to-Date

Operating Vacancy %

Capital Vacancy %

Budgeted Gapping %

Operating* Vacancy Rate (After Gapping)

City Operations

3.8%

23.6%

2.4%

1.3%

Agencies

3.5%

19.3%

3.4%

0.1%

Corporate Accounts**

9.0%

0.0%

0.0%

9.0%

Total Levy Operations

3.7%

20.7%

2.9%

0.8%

Rate Supported Programs

7.7%

17.7%

3.0%

4.8%

Grand Total

3.9%

20.6%

2.9%

1.0%

 

*Vacancy after Gapping % is based on operating positions only.

**Corporate Accounts are largely driven by Parking Enforcement Unit vacancies.

 

As of September 30, 2017, the City recorded an operating vacancy rate of 1.0 percent after gapping for an approved complement of 50,910.6 operating positions. The year-to-date vacancy rate for capital positions was 20.6 percent for an approved complement of 3,599.5 positions.

 

Figure 4: 2017 Year-End Projected Vacancy Rate

 

Program/Agency

2017 Year-End Projection

Operating Vacancy %

Capital Vacancy %

Budgeted Gapping %

Operating* Vacancy Rate (After Gapping)

City Operations

2.7%

17.1%

2.4%

0.3%

Agencies

2.8%

7.8%

3.4%

0.0%

Corporate Accounts**

9.0%

0.0%

0.0%

9.0%

Total Levy Operations

2.8%

10.9%

2.9%

0.0%

Rate Supported Programs

7.2%

7.7%

3.0%

4.3%

Grand Total

3.1%

10.9%

2.9%

0.2%

 

*Vacancy after Gapping % is based on operating positions only.

**Corporate Accounts are largely driven by Parking Enforcement Unit vacancies.

 

The year-end operating vacancy rate after gapping is projected to be 0.2 percent for an approved complement of 50,912.6 operating positions. The forecasted vacancy rate for capital positions is projected to be 10.9 percent for an approved complement of 3,461.5 positions.

 

A detailed overview of the third quarter complement is provided in the Approved Complement Section of this report.

Background Information

(November 20, 2017) Report and Appendices A to G from the Acting Chief Financial Officer on Operating Variance Report for the Nine Month Period Ended September 30, 2017
https://www.toronto.ca/legdocs/mmis/2017/ex/bgrd/backgroundfile-109109.pdf

Motions

Motion to Adopt Item moved by Councillor David Shiner (Carried)

25a - Operating Variance Report for the Nine Month Period Ended September 30, 2017

Origin
(November 27, 2017) Letter from the Budget Committee
Summary

The purpose of this report is to provide City Council with the operating variance for the nine month period ended September 30, 2017 as well as projections to year-end. This report also requests City Council's approval for amendments to the 2017 Approved Operating Budget between Programs that have no impact on the City's 2017 Approved Net Operating Budget.

 

The following table summarizes the financial position of Tax Supported Operations as of the third fiscal quarter and projection at year-end:

 

Figure 1: Tax Supported Operating Net Variance Summary ($ Millions)

Variance

September 30, 2017

Over/(Under)

Projected Y/E 2017

Over/(Under)

$

%

$

%

Gross Expenditures

(181.4)

-2.4%

(193.4)

-1.8%

Revenues

66.7

1.4%

(51.6)

-0.8%

Net Expenditures

(248.1)

-8.3%

(141.8)

-3.5%

Less: Toronto Building

(16.8)

201.3%

(12.5)

117.0%

Less: Children's Services

(8.6)

12.9

(12.0)

14.9%

Net Expenditures (Excl. Toronto Building and Children's Services)

(222.8)

-7.6%

(117.3)

-3.0%

 

In accordance with the Building Code Act, the surplus from Toronto Building must be contributed to the Building Code Act Service Improvement Reserve Fund to create and maintain systems and processes which enable service delivery timelines and reporting requirements of the Province's Bill 124, Building Code Statute Law Amendment Act, and 2002 Legislation to be met.

 

It is important to note, Children's Services year-end under-expenditure of $12.000 million net is related to Provincial / Federal growth funding to provide 825 new child care subsidies to support growth as directed by City Council on July 4, 2017 (EX26.30). A corresponding in-year adjustment is included in the Appendix F of the report for a one-time contribution to the Child Care Expansion Reserve Fund.

 

Year-to-Date Spending Results:

 

As noted in Figure 1 above, for the nine month period ended September 30, 2017, Tax Supported Operations reported a favourable net variance of $248.103 million or 8.3 percent and are projecting a year-end surplus of $141.822 million or 3.5 percent.

 

The year-to-date net under-spending was primarily driven by:

 

- Over-achieved Municipal Land Transfer Tax revenue due to higher than anticipated real estate market activity ($93.809 million net).
 

- Under-expenditure by the Toronto Transit Commission of $80.356 million net primarily as a result of lower departmental material expenditures, labour costs, and accident claims of $67.755 million net within Conventional Service, and fewer customer journeys than planned within Wheel Trans of $12.601 million net.
 

- Under-spending by Transportation Services driven by lower contract costs and decreased salt usage in the winter maintenance program ($18.103 million net).
 

- Over-achieved revenue in Toronto Building primarily due to the increasing number of building permit applications ($16.792 million net).
 

- Increased revenue from Supplementary Taxes due to a change in the historical supplementary roll delivery date compared to plan ($15.936 million net).
 

Favourable variances in other Programs and Agencies are primarily due to under-spending in salaries and benefits as a result of vacant positions. The majority of the vacant positions are expected to be filled by year-end, while other new vacant positions may occur throughout the system. More detailed explanations at the Program / Agency level can be found in the complement section of this report.

 

Year-End Spending Projections:

 

Based on this current trend, the City is projecting a net favourable year-end variance of $141.822 million or 3.5 percent. The key drivers for the expected year-end net position are largely due to the following:

 

- Higher than budgeted Municipal Land Transfer Tax revenue as a result of higher than expected sales revenue ($85.000 million net).
 

- Toronto Transit Commission - Conventional Service's under-spending of $35.076 million net is mainly related to labour expenses, employee benefits, PRESTO fees, lower diesel fuel consumption, utilities, depreciation, which are partially offset by passenger revenue increase due to the current trend of customers switching from pass-based fare media to single-ride fare media, and not requiring the budgeted reserve draw of $14.000 million. While, Wheel - Trans Service favourable variance of $14.259 million net is attributed to fewer customer journeys than budgeted. As a whole, Toronto Transit Commission is projecting a favourable year-end variance of $49.335 million net.
 

Consistent with the City's financial management practices and policies, Programs and Agencies projecting an unfavourable year-end variance are required to identify and implement mitigation strategies where possible to address any projected shortfalls.

 

It is important to note that the City's projected year-end under-spending of $141.822 million is primarily attributed to the projected higher Municipal Land Transfer Tax revenues of $85.000 million. After isolating Toronto Building projected net revenue, Municipal Land Transfer Tax over-achieved revenue accounts for 66 percent of the total City's favourable variance for year-end.

 

Rate Supported Programs:

 

As noted in Figure 2 below, for the nine month period ended September 30, 2017, Rate Supported Operations reported a favourable net variance of $14.431 million or 34.3 percent and are projecting a year-end surplus of $2.886 million.

 

Figure 2: Rate Supported Net Variance Summary ($ Millions)

Rate Supported Programs

September 30, 2017

Projected Y/E 2017

Over/(Under)

Over/(Under)

Solid Waste Management Services

2.6

(1.3)

Toronto Parking Authority

0.3

0.7

Toronto Water

(17.4)

(2.2)

Total Variance

(14.4)

(2.9)

 

The key year-to-date net under-spending in Rate Supported Program was driven by:

 

The negative variance in Solid Waste Management Services of $2.628 million net or 30.4 percent is primarily due to over-spending on contracted services, inter-divisional charges for fleet maintenance, debt service charges as well as earlier than planned reserve contributions.
 

The negative revenue in Toronto Parking Authority of $0.306 million net or 0.7 percent is primarily due to lower than planned off-street parking revenues and loss of sponsorship revenue in the Bike Share Program.

 
The positive revenue in Toronto Water of $17.365 million net is primarily due to advance postings of sale of water and industrial waste agreement revenues, as well as an overall increase in the volume demand for new sewer service connections and private water agreements.
 

Complement:

 

Figure 3: 2017 Year-To-Date Vacancy Rate

Program/Agency

2017 Year-to-Date

Operating Vacancy %

Capital Vacancy %

Budgeted Gapping %

Operating* Vacancy Rate (After Gapping)

City Operations

3.8%

23.6%

2.4%

1.3%

Agencies

3.5%

19.3%

3.4%

0.1%

Corporate Accounts**

9.0%

0.0%

0.0%

9.0%

Total Levy Operations

3.7%

20.7%

2.9%

0.8%

Rate Supported Programs

7.7%

17.7%

3.0%

4.8%

Grand Total

3.9%

20.6%

2.9%

1.0%

 

*Vacancy after Gapping % is based on operating positions only.

**Corporate Accounts are largely driven by Parking Enforcement Unit vacancies.

 

As of September 30, 2017, the City recorded an operating vacancy rate of 1.0 percent after gapping for an approved complement of 50,910.6 operating positions. The year-to-date vacancy rate for capital positions was 20.6 percent for an approved complement of 3,599.5 positions.

 

Figure 4: 2017 Year-End Projected Vacancy Rate

Program/Agency

2017 Year-End Projection

Operating Vacancy %

Capital Vacancy %

Budgeted Gapping %

Operating* Vacancy Rate (After Gapping)

City Operations

2.7%

17.1%

2.4%

0.3%

Agencies

2.8%

7.8%

3.4%

0.0%

Corporate Accounts**

9.0%

0.0%

0.0%

9.0%

Total Levy Operations

2.8%

10.9%

2.9%

0.0%

Rate Supported Programs

7.2%

7.7%

3.0%

4.3%

Grand Total

3.1%

10.9%

2.9%

0.2%

 

*Vacancy after Gapping % is based on operating positions only.

**Corporate Accounts are largely driven by Parking Enforcement Unit vacancies.

 

The year-end operating vacancy rate after gapping is projected to be 0.2 percent for an approved complement of 50,912.6 operating positions. The forecasted vacancy rate for capital positions is projected to be 10.9 percent for an approved complement of 3,461.5 positions.

 

A detailed overview of the third quarter complement is provided in the Approved Complement Section of this report.

Background Information
(November 27, 2017) Letter from the Budget Committee on Operating Variance Report for the Nine Month Period Ended September 30, 2017
https://www.toronto.ca/legdocs/mmis/2017/ex/bgrd/backgroundfile-109451.pdf