NY8.45 - Final Report - Zoning By-law Amendment and Subdivision Applications - 4700 Keele Street - South/East of The Pond Road and Sentinel Road

Decision Type:
ACTION
Status:
Amended
Ward:
8 - York West

City Council Decision

City Council on September 30, October 1 and 2, 2015, adopted the following:

 

1. City Council amend Zoning By-law No. 7625, for the lands at 4700 Keele Street, southeast of The Pond Road and Sentinel Road, substantially in accordance with the draft Zoning By-law Amendment attached as Attachment 13 to the report (September 3, 2015) from the Director, Community Planning, North York District, subject to Section 5 of Schedule 5 Section 37 Conditions of the draft Zoning By-law Amendment being deleted and replaced with the following:

 

"5. The Hoover House will be addressed as follows:

 

i. On or before December 31, 2015 or such other date as the Manager, Heritage Preservation Services may agree to in writing, the owner, at its expense shall provide a Stabilization and Protection Plan for the Hoover House prepared by a qualified heritage consultant, including a schedule of work and an estimate of costs and complete the work as set out in the approved Stabilization and Protection Plan, including providing a letter of substantial completion prepared and signed by a qualified heritage consultant confirming that the work has been completed in accordance with the approved Stabilization and Protection Plan and that an appropriate standard of conservation has been maintained, all to the satisfaction of the Manager, Heritage Preservation Services;

 

ii. On or before the earlier of December 31, 2016 or such other date as the Manager, Heritage Preservation Services may agree to in writing, and prior to any residential use of any building permitted under the implementing zoning by-law amendment, the owner, at its expense, shall provide a Conservation and Maintenance Plan for the Hoover House prepared by a qualified heritage consultant, including a schedule of work and an estimate of costs, and complete the work as set out in the approved Conservation and Maintenance Plan, including providing a letter of substantial completion prepared and signed by a qualified heritage consultant confirming that the work has been completed in accordance with the approved Conservation and Maintenance Plan and that an appropriate standard of conservation has been maintained, all to the satisfaction of the Manager, Heritage Preservation Services;

 

iii. On or before the earlier of the date the section 37 Agreement for the lands is entered into with the City and registered, and December 31, 2015 or such other date as the Manager, Heritage Preservation Services may agree to in writing, the owner, at its expense, shall enter into and register a Heritage Easement Agreement with the City for the property at 4700 Keele Street known as the Hoover House, subject to and in accordance with the approved Conservation and Maintenance Plan, all to the satisfaction of the Manager, Heritage Preservation Services, and the City Solicitor; and

 

iv. The Owner shall pay all costs associated with the implementation of the approved Stabilization and Protection Plan, and the approved Conservation and Maintenance Plan and any related heritage studies needed to determine a compatible future use for the Hoover House."

 

2. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment as may be required.

 

3. In accordance with the delegated approval under By-law No. 229-2000, as amended, City Council be advised that the Chief Planner and Executive Director, City Planning intends to approve Phase 1 of the draft plan of subdivision as generally illustrated on Attachment 2 to the report (September 3, 2015) from the Director, Community Planning, North York District, subject to:

 

a. The conditions as generally listed in Attachment 14 to the report (September 3, 2015) from the Director, Community Planning, North York District, which except as otherwise noted must be fulfilled prior to final approval and the release of the plan of subdivision for registration;

 

b. Any such revisions to the proposed subdivision plan or any such additional modified conditions as the Chief Planner and Executive Director, City Planning may deem to be appropriate to address matters arising from the ongoing technical review of this development; and

 

c. Draft plan approval not being issued until the necessary zoning is in full force and effect.

 

4. Before introducing the necessary Zoning Bill to City Council for enactment, City Council require the Owner to enter into an Agreement pursuant to Section 37 of the Planning Act to secure the following:

 

a. That the applicant participate in the City's Public Art Program and provide a cash contribution in the amount of $400,000 in accordance with a Public Art Plan submitted by the owner to the satisfaction of the City.  The cash contribution shall be paid prior to the issuance of the first above grade building permit for buildings on lands identified in Schedule 1 of the draft by-law.

 

b. Prior to the issuance of the first above grade building permit for buildings on lands identified in Schedule 1 of the draft by-law, that the applicant be required to make a financial contribution paid to the City in the amount of $250,000 to be used for streetscape improvements and local parks upgrades to be determined by staff in conjunction with the Ward Councillor.

 

c. Prior to the issuance of the first above grade building permit for buildings on lands identified in Schedule 1 of the draft by-law, the Owner shall make a cash contribution to the City in the amount of $204,195 to be used for the provision of a local community recreational facility and $147,491 for day care facilities. The financial contribution amount shall be indexed upwardly in accordance with the Statistics Canada Non-Residential Construction Price Index for Toronto for the period from the date of the registration of the Section 37 Agreement to the date of payment for the local community recreational facilities and daycare facilities. The Section 37 agreement will set out the allocation of contributions for the local community recreational facilities and daycare facilities.

 

d. The owner shall provide affordable rental housing for 60 students as part of the private academic accommodations in Buildings C1 and C2 in accordance with the following provisions which shall be further set out in the Section 37 agreement with the City:

 

i. The affordable rental housing will comprise 60 bedroom accommodations    within a range of residence unit types comprising bachelor, 1, 2, 3 and 4 bedrooms.

 

ii. The owner will maintain the private academic accommodations in Buildings C1 and C2 as rental housing, with no application for condominium registration or for conversion to non-rental housing purposes.

 

iii. Affordable rents will be charged to the tenants who occupy one of the 60 bedroom accommodations for a period of 15 years following the initial occupancy of each of buildings C1 and C2, providing that the affordable rental bedroom accommodations commence occupancy at the same time, subject to the provisions in Parts 4.d.iv and v below.

 

iv. The affordable rents will be based on an average rent level of approximately $900 monthly derived from an average rent for comparable existing student residence accommodations on the York University campus set for the academic year commencing September 2016, adjusted further to reflect differences in lease terms and arrangements for television services in the private academic accommodations, and varied by residence unit type and to reflect single or shared bedroom accommodations.

 

v. Rents may be increased annually by the provincial Rent Increase Guideline during the 15 year period.

 

vi. After the expiry of the 15 year period, rents charged to tenants newly occupying one of the 60 affordable rental bedroom accommodations will not be subject to restrictions by the City of Toronto under the terms of the Section 37 Agreement entered into under this by-law.

 

vii. Eligibility criteria for students who rent one of the 60 affordable rental bedroom accommodations will require that such student is receiving financial assistance under the Ontario Student Assistance Program.

 

viii. The residence units which contain affordable rental bedroom accommodations shall be furnished and equipped with kitchen and bathroom facilities.

 

e.  The Hoover House will be addressed as follows:

 

i. On or before December 31, 2015 or such other date as the Manager, Heritage Preservation Services may agree to in writing, the owner, at its expense shall provide a Stabilization and Protection Plan for the Hoover House prepared by a qualified heritage consultant, including a schedule of work and an estimate of costs and complete the work as set out in the approved Stabilization and Protection Plan, including providing a letter of substantial completion prepared and signed by a qualified heritage consultant confirming that the work has been completed in accordance with the approved Stabilization and Protection Plan and that an appropriate standard of conservation has been maintained, all to the satisfaction of the Manager, Heritage Preservation Services;

 

ii. On or before the earlier of December 31, 2016 or such other date as the Manager, Heritage Preservation Services may agree to in writing, and prior to any residential use of any building permitted under the implementing zoning by-law amendment, the owner, at its expense, shall provide a Conservation and Maintenance Plan for the Hoover House prepared by a qualified heritage consultant, including a schedule of work and an estimate of costs, and complete the work as set out in the approved Conservation and Maintenance Plan, including providing a letter of substantial completion prepared and signed by a qualified heritage consultant confirming that the work has been completed in accordance with the approved Conservation and Maintenance Plan and that an appropriate standard of conservation has been maintained, all to the satisfaction of the Manager, Heritage Preservation Services;

 

iii. On or before the earlier of the date the Section 37 Agreement for the lands is entered into with the City and registered, and December 31, 2015 or such other date as the Manager, Heritage Preservation Services may agree to in writing, the owner, at its expense, shall enter into and register a Heritage Easement Agreement with the City for the property at 4700 Keele Street known as the Hoover House, subject to and in accordance with the approved Conservation and Maintenance Plan, all to the satisfaction of the Manager, Heritage Preservation Services, and the City Solicitor; and

 

iv. The Owner shall pay all costs associated with the implementation of the approved Stabilization and Protection Plan, and the approved Conservation and Maintenance Plan and any related heritage studies needed to determine a compatible future use for the Hoover House.

 

f. A minimum of 110 square metres of gross floor area shall be provided on the ground floor of  a building on Block 'A' (Building C1 or C2), as shown on Schedule 4 of the draft by-law, for the purpose of providing a community bike centre, which space shall be made available for a nominal rent for a period of not less than 5 years following occupancy of the building to a not-for-profit organization for the purpose of providing a community bike centre or other community-oriented use mutually agreed upon by the City and the owner.

 

The following matters are also recommended to be secured in the Section 37 Agreement as a legal convenience to support development:

 

g. Parkland dedication

 

i. The Owner shall remediate, construct to base park condition, and convey a 1.24 hectare park as part of the development of the subdivision (Phase 1 and Phase 2 of the subdivision).  The park remediation, construction and conveyance shall be phased as follows: a 0.6595 hectare portion of the park will be conveyed prior to the earlier of within three months of first residential occupancy of Phase 1 of the subdivision and December 30th, 2017, and the remaining 0.5805 hectare portion will be conveyed prior to the issuance of the first above grade building permit for Phase 2 of the draft plan of subdivision identified in Attachment 2 to the report (September 3, 2015) from the Director, Community Planning, North York District.

 

ii. Prior to the issuance of the first above grade building permit for buildings on lands identified in Schedule 1 of the draft by-law (Phase 1), the Owner shall submit a reference plan identifying the boundaries of the 0.6595 hectare Phase 1 park, and the 0.5805 hectare Phase 2 park, generally located on the lands identified as Block B-2 on Schedule 4 of the draft by-law.  Prior to the issuance of the first above grade building permit for buildings on lands identified in Schedule 1 of the draft by-law (Phase 1) the Owner agrees to enter into an escrow agreement with the City for the Phase 1 park conveyance and the Phase 2 park conveyance.

 

iii. Prior to the issuance of the first above grade building permit for buildings on lands identified in Schedule 1 of the draft by-law (Phase 1), the Owner shall submit a letter of credit for the value of the 0.6595 ha portion of the park (Phase 1 park) and for the value of base park improvements to the Phase 1 park to secure the conveyance and construction of the park.

           

h. The Owner agrees to construct Street A as generally shown on Schedule 4 of the draft by-law and as follows:

 

i. Street A will be constructed as a 18.5 metre wide public right-of-way extending north-south from The Pond Road to Assiniboine Road and conveyed to the City of Toronto prior to the issuance of the first above grade building permit for development (elementary school and/or community centre) on Block B-1 as generally shown on Schedule 4 of the draft by-law.

 

ii. Any remediation of the lands to be conveyed to the City will be borne by the Owner.

 

iii. The exact location of Street A will be identified in a Reference Plan to the City's satisfaction prior to the issuance of the first above grade building permit of development in Block A as shown on Schedule 4 of the draft by-law.

 

i. Street D (as generally shown on Schedule YDMU-3 (1) of the draft by-law)

 

i. The Owner shall construct, at no cost to the city, the proposed extension of Street D, from Assiniboine Road to The Pond Road, to the satisfaction of the Executive Director, Engineering and Construction Services.

 

ii. Prior to the issuance of the first above grade building permit for Blocks 1 and 2, the Owner shall post a Letter of Credit as security for the value of the lands and construction of the proposed extension of Haynes Avenue from Assiniboine Road to The Pond Road and related municipal servicing equal to 120 percent of the cost of all services to the satisfaction of the Executive Director, Engineering and Construction Services. The submitted Letter of Credit to guarantee the construction of the Haynes Avenue extension from Assiniboine Road to The Pond Road, will be released following construction of the road to the satisfaction of the Executive Director, Engineering and Construction Services, less 20 percent of the total value which will be retained for a two year period as a performance guarantee.

 

iii. Prior to the issuance of the first above grade building permit for Buildings C1 or C2 the Owner shall provide a detailed pavement marking plan for proposed Street D and provide securities for these works, in an amount determined upon receipt of an acceptable pavement markings plan, to the satisfaction of Executive Director, Engineering and Construction Services.

 

iv. The Owner shall conduct an environmental site assessment as per City Directive No. ENV-010-2013 for all streets to be conveyed to the City in accordance with the terms and conditions of the standard subdivision agreement including providing payment for a peer reviewer and the submission of a Record of Site Condition (RSC). These services shall be constructed concurrently as other on-site services or such other timing that is agreed to at the sole discretion of the Executive Director, Engineering and Construction Services.

 

v. The Owner shall convey and dedicate all proposed public roads in Phase 1 (Street D - extension of Haynes Road) as generally shown on Schedule YDMU-3(1) of the draft by-law to the City of Toronto as a Public Highway, free and clear of any and all encumbrances in accordance with the Development Infrastructure Policy and Standards and draft Urban Guidelines for the Southwest Precinct, to the satisfaction of the Executive Director, Engineering and Construction Services and Director, City Planning, North York District.

 

j. Prior to issuance of the first above grade building permit for Blocks 1 and 2, the Owner shall submit a financial guarantee of $200,000 in the form of a letter of credit to Engineering and Construction Services for the traffic signal at the intersection of The Pond Road, Haynes Avenue extension and Seneca Lane.

 

k. Prior to issuance of the first above grade building permit for Blocks 1 and 2, the Owner shall submit a certified cheque in the amount of $30,000 for the future maintenance of The Pond Road, Haynes Avenue extension and Seneca Lane signalized intersection.

 

l. Prior to the issuance of the first above grade building permit for buildings on Phase 1 of the subdivision lands (Attachment 2), excluding a permit for demolition or a rental/sales centre, the owner shall submit a draft Reference Plan of Survey, in metric units and integrated with the Ontario Co-ordinate System, showing as separate PARTS thereof the lands to be conveyed to the City to the Executive Director of Engineering and Construction Services, for review and approval, prior to depositing it in the Land Registry Office, which identifies the following:

 

i. Public Road, Haynes Avenue between Assiniboine Road and The Pond Road; and

 

ii. Public Road, Leitch Avenue/Ian MacDonald Boulevard extension, (between Assiniboine Road and The Pond Road).

 

m. The Owner shall pay for all costs for preparation and registration of reference plan(s).

 

n. Prior to the issuance of the first above grade building permit for Buildings C1 and C2 as identified on Schedule YDMU-3(1) of the draft by-law, the owner shall provide a security (TBD) for the proposed ultimate cross section of The Pond Road [five (5) lane cross section including two (2) bicycle lanes, and two (2) through lanes], between Sentinel Road and Street D to the satisfaction of the Executive Director, Engineering and Construction Services.

 

o. Prior to the issuance of the first above grade building permit for Buildings C1 and C2 the owner shall submit a security (TBD) to the City for the future implementation of a westbound left-turn lane at the Street D and The Pond Road intersection should it be deemed necessary by the General Manager, Transportation Services. The payment shall be refunded back to the Owner two years after the occupancy of Phase 1 (two years from September 1, 2017) should the left turn lane be deemed unnecessary by the General Manager, Transportation Services.

 

p. Obligation to Re-naturalize the Priority Restoration Area

 

i. Prior to Site Plan approval of Buildings C1 or C2 in Schedule YDMU-3(1) of the draft by-law, the Owner shall prepare and submit a "Black Creek Valley Priority Restoration Area Stewardship Plan" for Block C as generally illustrated on Schedule 4, to the satisfaction of Urban Forestry Ravine and Natural Feature Protection.  Once approved, the plan will guide restoration and stewardship activities in the Black Creek Valley Priority Restoration Area.

 

ii. Prior to Site Plan approval of Buildings C1 or C2 in Schedule YDMU-3(1) of the draft by-law, the exact location of the Phase 1 and Phase 2 priority restoration areas and the 10m buffer shall be identified in a Reference Plan to the satisfaction of Urban Forestry Ravine and Natural Feature Protection prior to registration of the Plan of Subdivision. Phase 1 generally includes the northern portion of the Priority Restoration Area (Block C on Schedule 4) and Phase 2 generally includes the southern portion of Block C currently occupied by the Maloca Community Garden.

 

iii. Prior to Site Plan approval of the first development within Phase 1 of Schedule YDMU-3(1) of the draft by-law, the Owner shall submit a security deposit to the satisfaction of Urban Forestry Ravine and Natural Feature Protection to secure the implementation of the "Black Creek Valley Priority Restoration Area Stewardship Plan".

 

iv. Within three months of Occupancy or no later than December 1, 2017 of Buildings C1 or C2 as identified on Schedule YDMU-3(1) of the draft by-law, the Owner will undertake the first phase of stewardship/restoration activities in the Black Creek Valley Priority Restoration Area identified as Block C as illustrated on Schedule 4 of the draft by-law (or as identified in the approved Reference Plan). Stewardship/restoration activities shall be implemented in accordance with the objectives and strategies outlined in the "Black Creek Valley Priority Restoration Area Stewardship Plan" to the satisfaction of Urban Forestry Ravine and Natural Feature Protection.

 

v. Prior to the issuance of the first above grade permit of development within Phase 2 as identified on the draft plan of subdivision (Attachment 2 of the report dated September 3, 2015), or as otherwise agreed to by Urban Forestry Ravine and Natural Feature Protection, the Owner will undertake the second phase of stewardship/restoration activities in the Black Creek Valley Priority Restoration Area identified as Block C as illustrated on Schedule 4 (or as identified in the reference plan). Stewardship/restoration activities shall be implemented in accordance with the objectives and strategies outlined in the "Black Creek Valley Priority Restoration Area Stewardship Plan" to the satisfaction of Urban Forestry Ravine and Natural Feature Protection.

 

vi. Prior to undertaking re-naturalization within the Priority Restoration Area, the Owner shall submit to the satisfaction of City Planning a Stage 3 Archaeological Assessment to determine the boundaries of the archaeological site(s).

 

vii. The Owner pay all costs associated with the implementation of the "Black Creek Valley Priority Restoration Area Stewardship Plan".

 

q. School/Community Recreation Centre

 

i. An area not less than 1.79 hectares on Block B-1 as generally shown on Schedule 4 of the draft by-law will be reserved for a school and/or City of Toronto Community Recreation Facility. It is acknowledged that the City will initiate appropriate capital planning exercises and begin the design and construction of the community recreation centre, if necessary, at such time when a minimum of 4,000 residential units have received planning approvals in the Edge Precincts to ensure construction is completed in a timely manner for the full-build out of the Secondary Plan area, subject to City Council approval.

 

ii. The Owner may be required to convey to the Toronto District School Board, the Toronto Catholic District School Board and/or the City of Toronto a portion of Block B-1 to develop an elementary school and/or community recreation centre at fair market value.

 

r. The lands located to the west of Passy Crescent, identified as Blocks B-1 and B-2 on Schedule 4 of the draft by-law, are reserved for future community use and include a school and community centre and public park. These lands have not been subject to archaeological assessment. Should these lands be subject to any soil disturbance in the future a Stage1-2 Archaeological Assessment would be required by Heritage Preservation Services.

 

s. Prior to undertaking re-naturalization within the lands known as Block C in Schedule 4 of the draft by-law, a Stage 3 Archaeological Assessment will be undertaken for the lands within the re-naturalization area (Block C).

 

t. The Owner shall construct and maintain the development in accordance with Tier 1 performance measures of the Toronto Green Standard, as adopted by Toronto City Council at its meeting held on October 26 and 27, 2009 through the adoption of Planning and Growth Management Committee Item PG32.3.

 

u. The owner shall agree to the registration of a Section 118 Restriction pursuant to the Land Titles Act as the Chief Planner and Executive Director, City Planning determines is appropriate for each of the public streets identified on the Draft Plan of Subdivision on Attachment 2 as well as Street A, park lands (Block B-2) and potential school/community centre lands (Block B-1) identified on Schedule 4 of the draft by-law.

 

v. The Section 37 Agreement must:

 

i. secure such conditions of subdivision approval as the Chief Planner and Executive Director, City Planning determines are appropriate, and

 

ii. Require the Owner to enter into the City's standard Subdivision agreement for Phase 1 and satisfy the pre-registration conditions contained therein by September 1, 2017, or at a later date at the discretion of the Director, Development Engineering and Construction Services.

 

5. City Council authorize the installation of traffic control signals at the intersection of the Pond Road, Street D (Haynes Avenue extension) in co-ordination with the construction of Street D.

 

6.  City Council determine that no further notice be required pursuant to the Planning Act.  

 

7.  City Council authorize the entering into of a Heritage Easement Agreement under Section 37 of the Ontario Heritage Act with the owner of the property at 4700 Keele Street, known as the Hoover House in a form and content satisfactory to the City Solicitor and the Chief Planner and Executive Director, City Planning.

 

8.  City Council authorize the City Solicitor to introduce the necessary bill in Council authorizing the entering into of a Heritage Easement Agreement for the property at the property at 4700 Keele Street, known as the Hoover House.

Public Notice Given

Statutory - Planning Act, RSO 1990

Background Information (Community Council)

(September 3, 2015) Final Report and Attachments 1-14 from the Director, Community Planning, North York District on Zoning By-law Amendment and Subdivision Applications for 4700 Keele Street - South/East of The Pond Road and Sentinel Road
https://www.toronto.ca/legdocs/mmis/2015/ny/bgrd/backgroundfile-83378.pdf
(August 18, 2015) Notice of Pending Report from the Director, Community Planning, North York District on Zoning By-law Amendment and Subdivision Application for 4700 Keele Street
https://www.toronto.ca/legdocs/mmis/2015/ny/bgrd/backgroundfile-82962.pdf

Communications (Community Council)

(August 24, 2015) E-mail from Dennis De Rango, Specialized Services Team Lead, Hydro One (NY.Main.NY8.45.1)
https://www.toronto.ca/legdocs/mmis/2015/ny/comm/communicationfile-54601.pdf

Motions (City Council)

Motion to Amend Item moved by Councillor Anthony Perruzza (Carried)

That:

 

1.  City Council delete Recommendation 1 of the North York Community Council and replace it with the following:

 

1.  City Council amend Zoning By-law No. 7625, for the lands at 4700 Keele Street, southeast of The Pond Road and Sentinel Road, substantially in accordance with the draft Zoning By-law Amendment  attached as Attachment 13 to the report (September 3, 2015) from the Director, Community Planning, North York District subject to Section 5 of Schedule 5 Section 37 Conditions of the draft Zoning By-law Amendment being deleted and replaced with the following:

 

"5. The Hoover House will be addressed as follows:

 

i. On or before December 31, 2015  or such other date as the Manager, Heritage Preservation Services may agree to in writing, the owner, at its expense shall provide a Stabilization and Protection Plan for the Hoover House prepared by a qualified heritage consultant, including a schedule of work and an estimate of costs and complete the work as set out in the approved Stabilization and Protection Plan, including providing a letter of substantial completion prepared and signed by a qualified heritage consultant confirming that the work  has been completed in accordance with the approved Stabilization and Protection Plan and that an appropriate standard of conservation has been maintained, all to the satisfaction of the Manager, Heritage Preservation Services;

 

ii.  On or before the earlier of December 31, 2016 or such other date as the Manager, Heritage Preservation Services may agree to in writing, and prior to any residential use of any building permitted under the implementing zoning by-law amendment, the owner, at its expense, shall provide a Conservation and Maintenance Plan for the Hoover House prepared by a qualified heritage consultant, including a schedule of work and an estimate of costs, and complete the work as set out in the approved Conservation and Maintenance Plan, including providing a letter of substantial completion prepared and signed by a qualified heritage consultant confirming that the work  has been completed in accordance with the approved Conservation and Maintenance Plan and that an appropriate standard of conservation has been maintained, all to the satisfaction of the Manager, Heritage Preservation Services;

 

iii.  On or before the earlier of the date the section 37  Agreement for the lands is entered into with the City and registered, and December 31, 2015 or such other date as the Manager, Heritage Preservation Services may agree to in writing,  the owner, at its expense,  shall enter  into and register a Heritage Easement Agreement with the City for the property at 4700 Keele Street known as the Hoover House, subject to and in accordance with the approved Conservation  and Maintenance Plan,  all to the satisfaction of the Manager, Heritage Preservation Services, and the City Solicitor; and

 

iv. The Owner shall pay all costs associated with the implementation of the approved Stabilization and Protection Plan, and the approved Conservation and Maintenance Plan and any related heritage studies needed to determine a compatible future use for the Hoover House.".

 

2.  City Council amend Recommendation 4 of the North York Community Council by deleting part e. and replacing it with the following:

 

"e. The Hoover House will be addressed as follows:

 

i. On or before December 31, 2015  or such other date as the Manager, Heritage Preservation Services may agree to in writing, the owner, at its expense shall provide a Stabilization and Protection Plan for the Hoover House prepared by a qualified heritage consultant, including a schedule of work and an estimate of costs and complete the work as set out in the approved Stabilization and Protection Plan, including providing a letter of substantial completion prepared and signed by a qualified heritage consultant confirming that the work  has been completed in accordance with the approved Stabilization and Protection Plan and that an appropriate standard of conservation has been maintained, all to the satisfaction of the Manager, Heritage Preservation Services;

 

ii.  On or before the earlier of December 31, 2016 or such other date as the Manager, Heritage Preservation Services may agree to in writing, and prior to any residential use of any building permitted under the implementing zoning by-law amendment, the owner, at its expense, shall provide a Conservation and Maintenance Plan for the Hoover House prepared by a qualified heritage consultant, including a schedule of work and an estimate of costs, and complete the work as set out in the approved Conservation and Maintenance Plan, including providing a letter of substantial completion prepared and signed by a qualified heritage consultant confirming that the work  has been completed in accordance with the approved Conservation and Maintenance Plan and that an appropriate standard of conservation has been maintained, all to the satisfaction of the Manager, Heritage Preservation Services;

 

iii.  On or before the earlier of the date the Section 37 Agreement for the lands is entered into with the City and registered, and December 31, 2015 or such other date as the Manager, Heritage Preservation Services may agree to in writing, the owner, at its expense, shall enter  into and register a Heritage Easement Agreement with the City for the property at 4700 Keele Street known as the Hoover House, subject to and in accordance with the approved Conservation and Maintenance Plan, all to the satisfaction of the Manager, Heritage Preservation Services, and the City Solicitor; and

 

iv. The Owner shall pay all costs associated with the implementation of the approved Stabilization and Protection Plan, and the approved Conservation and Maintenance Plan and any related heritage studies needed to determine a compatible future use for the Hoover House.".

 

3.  City Council determine that no further notice be required pursuant to the Planning Act.  

 

4.  City Council authorize the entering into of a Heritage Easement Agreement under Section 37 of the Ontario Heritage Act with the owner of the property at 4700 Keele Street, known as the Hoover House in a form and content satisfactory to the City Solicitor and the Chief Planner and Executive Director, City Planning.

 

5.  City Council authorize the City Solicitor to introduce the necessary bill in Council authorizing the entering into of a Heritage Easement Agreement for the property at the property at 4700 Keele Street, known as the Hoover House.


Motion to Adopt Item as Amended (Carried)

Vote (Adopt Item as Amended) Oct-02-2015 11:31 AM

Result: Carried Majority Required - NY8.45 - Adopt the item as amended
Total members that voted Yes: 40 Members that voted Yes are Maria Augimeri, Ana Bailão, Michelle Berardinetti, Jon Burnside, John Campbell, Christin Carmichael Greb, Shelley Carroll, Raymond Cho, Josh Colle, Gary Crawford, Joe Cressy, Janet Davis, Justin J. Di Ciano, Frank Di Giorgio, Sarah Doucette, John Filion, Paula Fletcher, Rob Ford, Mark Grimes, Stephen Holyday, Jim Karygiannis, Norman Kelly, Mike Layton, Chin Lee, Josh Matlow, Pam McConnell, Mary-Margaret McMahon, Joe Mihevc, Denzil Minnan-Wong, Ron Moeser, Frances Nunziata (Chair), Cesar Palacio, James Pasternak, Gord Perks, Anthony Perruzza, Jaye Robinson, David Shiner, Michael Thompson, John Tory, Kristyn Wong-Tam
Total members that voted No: 0 Members that voted No are
Total members that were Absent: 5 Members that were absent are Paul Ainslie, Vincent Crisanti, Glenn De Baeremaeker, Mary Fragedakis, Giorgio Mammoliti

NY8.45 - Final Report - Zoning By-law Amendment and Subdivision Applications - 4700 Keele Street - South/East of The Pond Road and Sentinel Road

Decision Type:
ACTION
Status:
Amended
Ward:
8 - York West

Public Notice Given

Statutory - Planning Act, RSO 1990

Community Council Recommendations

North York Community Council recommends that:

 

1. City Council amend Zoning By-law No. 7625, for the lands at 4700 Keele Street, south-east of The Pond Road and Sentinel Road, substantially in accordance with the draft Zoning By-law Amendment attached as Attachment No. 13 to the report (September 3, 2015) from the Director, Community Planning, North York District.

 

2. City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Zoning By-law Amendment as may be required.

 

3. In accordance with the delegated approval under by-law 229-2000, as amended, City Council be advised that the Chief Planner and Executive Director, City Planning intends to approve Phase 1 of the draft plan of subdivision as generally illustrated on Attachment 2 to the report (September 3, 2015) from the Director, Community Planning, North York District, subject to:

 

a. The conditions as generally listed in Attachment 14 to the report (September 3, 2015) from the Director, Community Planning, North York District, which except as otherwise noted must be fulfilled prior to final approval and the release of the plan of subdivision for registration;

 

b. Any such revisions to the proposed subdivision plan or any such additional modified conditions as the Chief Planner and Executive Director, City Planning may deem to be appropriate to address matters arising from the ongoing technical review of this development; and

 

c. Draft plan approval not being issued until the necessary zoning is in full force and effect.

 

4. Before introducing the necessary Zoning Bill to City Council for enactment, City Council require the Owner to enter into an Agreement pursuant to Section 37 of the Planning Act to secure the following:

 

a. That the applicant participate in the City's Public Art Program and provide a cash contibution in the amount of $400,000 in accordance with a Public Art Plan submitted by the owner to the safisfaction of the City.  The cash contribution shall be paid prior to the issuance of the first above grade building permit for buildings on lands identified in Schedule 1 of the draft by-law.

 

b. Prior to the issuance of the first above grade building permit for buildings on lands identified in Schedule 1 of the draft by-law, that the applicant be required to make a financial contribution paid to the City in the amount of $250,000 to be used for streetscape improvements and local parks upgrades to be determined by staff in conjunction with the Ward Councillor.

 

c. Prior to the issuance of the first above grade building permit for buildings on lands identified in Schedule 1 of the draft by-law, the Owner shall make a cash contribution to the City in the amount of $204,195 to be used for the provision of a local community recreational facility and $147,491 for day care facilities. The financial contribution amount shall be indexed upwardly in accordance with the Statistics Canada Non-Residential Construction Price Index for Toronto for the period from the date of the registration of the Section 37 Agreement to the date of payment for the local community recreational facilities and daycare facilities. The Section 37 agreement will set out the allocation of contributions for the local community recreational facilities and daycare facilities.

 

d. The owner shall provide affordable rental housing for 60 students as part of the private academic accommodations in Buildings C1 and C2 in accordance with the following provisions which shall be further set out in the Section 37 agreement with the City:

 

i. The affordable rental housing will comprise 60 bedroom accommodations    within a range of residence unit types comprising bachelor, 1, 2, 3 and 4 bedrooms.

 

ii. The owner will maintain the private academic accommodations in Buildings C1 and C2 as rental housing, with no application for condominium registration or for conversion to non-rental housing purposes.

 

iii. Affordable rents will be charged to the tenants who occupy one of the 60 bedroom accommodations for a period of 15 years following the initial occupancy of each of buildings C1 and C2, providing that the affordable rental bedroom accommodations commence occupancy at the same time, subject to the provisions in 4.d. (iv) and (v).

 

iv. The affordable rents will be based on an average rent level of approximately $900 monthly derived from an average rent for comparable existing student residence accommodations on the York University campus set for the academic year commencing September 2016, adjusted further to reflect differences in lease terms and arrangements for television services in the private academic accommodations, and varied by residence unit type and to reflect single or shared bedroom accommodations.

 

v. Rents may be increased annually by the provincial Rent Increase Guideline during the 15 year period.

 

vi. After the expiry of the 15 year period, rents charged to tenants newly occupying one of the 60 affordable rental bedroom accommodations will not be subject to restrictions by the City of Toronto under the terms of the Section 37 Agreement entered into under this by-law.

 

vii. Eligibility criteria for students who rent one of the 60 affordable rental bedroom accommodations will require that such student is receiving financial assistance under the Ontario Student Assistance Program.

 

viii. The residence units which contain affordable rental bedroom accommodations shall be furnished and equipped with kitchen and bathroom facilities.

 

e. The Hoover House will be addressed as follows:

 

Prior to the issuance of the first above grade building permit for buildings on the lands identified in Schedule 1 of the draft by-law, the Owner shall:

 

i. Provide a Stabilization and Protection Plan for the Hoover House, including a schedule of work and timing for completion, prepared by a qualified heritage consultant, all to the satisfaction of the Manager, Heritage Preservation Services,

 

ii. Provide a Conservation and Maintenance Plan for the Hoover House, including a schedule of work and timing for completion, prepared by a qualified heritage consultant, all to the satisfaction of the Manager, Heritage Preservation Services.

 

iii. Enter into a Heritage Easement Agreement for the property at 4700 Keele Street, known as the Hoover House, subject to and in accordance with the required Stabilization and Protection Plan and Conservation and Maintenance Plan, all to the satisfaction of the Manager, Heritage Preservation Services, including registration of such agreement to the satisfaction of the City Solicitor prior to the registration of the subdivision agreement.

 

iv. Pay all costs associated with the implementation of the Stabilization and Protection Plan, the Conservation and Maintenance Plan and any related heritage studies needed to determine a compatible future use for the Hoover House.

 

f. A minimum of 110 square metres of gross floor area shall be provided on the ground floor of  a building on Block ‘A’ (Building C1 or C2), as shown on Schedule 4 of the draft by-law, for the purpose of providing a community bike centre, which space shall be made available for a nominal rent for a period of not less than 5 years following occupancy of the building to a not-for-profit organization for the purpose of providing a community bike centre or other community-oriented use mutually agreed upon by the City and the owner.

 

The following matters are also recommended to be secured in the Section 37 Agreement as a legal convenience to support development:

 

g. Parkland dedication

 

i. The Owner shall remediate, construct to base park condition, and convey a 1.24 hectare park as part of the development of the subdivision (Phase 1 and Phase 2 of the subdivision).  The park remediation, construction and conveyance shall be phased as follows: a 0.6595 hectare portion of the park will be conveyed prior to the earlier of within three months of first residential occupancy of Phase 1 of the subdivision and December 30th, 2017, and the remaining 0.5805 hectare portion will be conveyed prior to the issuance of the first above grade building permit for Phase 2 of the draft plan of subdivision identified in Attachment 2 to the report (September 3, 2015) from the Director, Community Planning, North York District.

 

ii. Prior to the issuance of the first above grade building permit for buildings on lands identified in Schedule 1 of the draft by-law (Phase 1), the Owner shall submit a reference plan identifying the boundaries of the 0.6595 hectare Phase 1 park, and the 0.5805 hectare Phase 2 park, generally located on the lands identified as Block B-2 on Schedule 4 of the draft by-law.  Prior to the issuance of the first above grade building permit for buildings on lands identified in Schedule 1 of the draft by-law (Phase 1) the Owner agrees to enter into an escrow agreement with the City for the Phase 1 park conveyance and the Phase 2 park conveyance.

 

iii. Prior to the issuance of the first above grade building permit for buildings on lands identified in Schedule 1 of the draft by-law (Phase 1), the Owner shall submit a letter of credit for the value of the 0.6595 ha portion of the park (Phase 1 park) and for the value of base park improvements to the Phase 1 park to secure the conveyance and construction of the park.

           

h. The Owner agrees to construct Street A as generally shown on Schedule 4 of the draft by-law and as follows:

 

i. Street A will be constructed as a 18.5 metre wide public right-of-way extending north-south from The Pond Road to Assiniboine Road and conveyed to the City of Toronto prior to the issuance of the first above grade building permit for development (elementary school and/or community centre) on Block B-1 as generally shown on Schedule 4 of the draft by-law.

 

ii. Any remediation of the lands to be conveyed to the City will be borne by the Owner.

 

iii. The exact location of Street A will be identified in a Reference Plan to the City’s satisfaction prior to the issuance of the first above grade building permit of development in Block A as shown on Schedule 4 of the draft by-law.

 

i. Street D (as generally shown on Schedule YDMU-3 (1) of the draft by-law)

 

i. The Owner shall construct, at no cost to the city, the proposed extension of Street D, from Assiniboine Road to The Pond Road, to the satisfaction of the Executive Director, Engineering and Construction Services.

 

ii. Prior to the issuance of the first above grade building permit for Blocks 1 and 2, the Owner shall post a Letter of Credit as security for the value of the lands and construction of the proposed extension of Haynes Avenue from Assiniboine Road to The Pond Road and related municipal servicing equal to 120% of the cost of all services to the satisfaction of the Executive Director, engineering and Construction Services. The submitted Letter of Credit to guarantee the construction of the Haynes Avenue extension from Assiniboine Road to The Pond Road, will be released following construction of the road to the satisfaction of the Executive Director, Engineering and Construction Services, less 20% of the total value which will be retained for a two year period as a performance guarantee.

 

iii. Prior to the issuance of the first above grade building permit for Buildings C1 or C2 the Owner shall provide a detailed pavement marking plan for proposed Street D and provide securities for these works, in an amount determined upon receipt of an acceptable pavement markings plan, to the satisfaction of Executive Director, Engineering and Construction Services.

 

iv. The Owner shall conduct an environmental site assessment as per City Directive No. ENV-010-2013 for all streets to be conveyed to the City in accordance with the terms and conditions of the standard subdivision agreement including providing payment for a peer reviewer and the submission of a Record of Site Condition (RSC). These services shall be constructed concurrently as other on-site services or such other timing that is agreed to at the sole discretion of the Executive Director, Engineering and Construction Services.

 

v. The Owner shall convey and dedicate all proposed public roads in Phase 1 (Street D – extension of Haynes Road) as generally shown on Schedule YDMU-3(1) of the draft by-law to the City of Toronto as a Public Highway, free and clear of any and all encumbrances in accordance with the Development Infrastructure Policy and Standards and draft Urban Guidelines for the Southwest Precinct, to the satisfaction of the Executive Director, Engineering and Construction Services and Director, City Planning Division, North York District.

 

j. Prior to issuance of the first above grade building permit for Blocks 1 and 2, the Owner shall submit a financial guarantee of $200,000 in the form of a letter of credit to the Engineering and Construction Services Division, City of Toronto, for the traffic signal at the intersection of The Pond Road, Haynes Avenue extension and Seneca Lane.

 

k. Prior to issuance of the first above grade building permit for Blocks 1 and 2, the Owner shall submit a certified cheque in the amount of $30,000 for the future maintenance of The Pond Road, Haynes Avenue extension and Seneca Lane signalized intersection.

 

l. Prior to the issuance of the first above grade building permit for buildings on Phase 1 of the subdivision lands (Attachment 2), excluding a permit for demolition or a rental/sales centre, the owner shall submit a draft Reference Plan of Survey, in metric units and integrated with the Ontario Co-ordinate System, showing as separate PARTS thereof the lands to be conveyed to the City to the Executive Director of Engineering and Construction Services, for review and approval, prior to depositing it in the Land Registry Office, which identifies the following:

 

i. Public Road, Haynes Avenue between Assiniboine Road and The Pond Road; and

 

ii. Public Road, Leitch Avenue/Ian MacDonald Boulevard extension, (between Assiniboine Road and The Pond Road).

 

m. The Owner shall pay for all costs for preparation and registration of reference plan(s).

 

n. Prior to the issuance of the first above grade building permit for Buildings C1 and C2 as identified on Schedule YDMU-3(1) of the draft by-law, the owner shall provide a security (TBD) for the proposed ultimate cross section of The Pond Road [five (5) lane cross section including two (2) bicycle lanes, and two (2) through lanes], between Sentinel Road and Street D to the satisfaction of the Executive Director, Engineering and Construction Services.

 

o. Prior to the issuance of the first above grade building permit for Buildings C1 and C2 the owner shall submit a security (TBD) to the City for the future implementation of a westbound left-turn lane at the Street D and  The Pond Road intersection should it be deemed necessary by the General Manager of Transportation Services. The payment shall be refunded back to the Owner two years after the occupancy of Phase 1 (two years from September 1, 2017) should the left turn lane be deemed unnecessary by the General Manager, Transportation Services.

 

p. Obligation to Re-naturalize the Priority Restoration Area

 

i. Prior to Site Plan approval of Buildings C1 or C2 in Schedule YDMU-3(1) of the draft by-law, the Owner shall prepare and submit a “Black Creek Valley Priority Restoration Area Stewardship Plan” for Block C as generally illustrated on Schedule 4, to the satisfaction of Urban Forestry Ravine and Natural Feature Protection.  Once approved, the plan will guide restoration and stewardship activities in the Black Creek Valley Priority Restoration Area.

 

ii. Prior to Site Plan approval of Buildings C1 or C2 in Schedule YDMU-3(1) of the draft by-law, the exact location of the Phase 1 and Phase 2 priority restoration areas and the 10m buffer shall be identified in a Reference Plan to the satisfaction of Urban Forestry Ravine and Natural Feature Protection prior to registration of the Plan of Subdivision. Phase 1 generally includes the northern portion of the Priority Restoration Area (Block C on Schedule 4) and Phase 2 generally includes the southern portion of Block C currently occupied by the Maloca Community Garden.

 

iii. Prior to Site Plan approval of the first development within Phase 1 of Schedule YDMU-3(1) of the draft by-law, the Owner shall submit a security deposit to the satisfaction of Urban Forestry Ravine and Natural Feature Protection to secure the implementation of the “Black Creek Valley Priority Restoration Area Stewardship Plan”.

 

iv. Within three months of Occupancy or no later than December 1, 2017 of Buildings C1 or C2 as identified on Schedule YDMU-3(1) of the draft by-law, the Owner will undertake the first phase of stewardship/restoration activities in the Black Creek Valley Priority Restoration Area identified as Block C as illustrated on Schedule 4 of the draft by-law (or as identified in the approved Reference Plan). Stewardship/restoration activities shall be implemented in accordance with the objectives and strategies outlined in the “Black Creek Valley Priority Restoration Area Stewardship Plan” to the satisfaction of Urban Forestry Ravine and Natural Feature Protection.

 

v. Prior to the issuance of the first above grade permit of development within Phase 2 as identified on the draft plan of subdivision (Attachment 2 of the report dated September 3, 2015), or as otherwise agreed to by Urban Forestry Ravine and Natural Feature Protection, the Owner will undertake the second phase of stewardship/restoration activities in the Black Creek Valley Priority Restoration Area identified as Block C as illustrated on Schedule 4 (or as identified in the reference plan). Stewardship/restoration activities shall be implemented in accordance with the objectives and strategies outlined in the “Black Creek Valley Priority Restoration Area Stewardship Plan” to the satisfaction of Urban Forestry Ravine and Natural Feature Protection.

 

vi. Prior to undertaking re-naturalization within the Priority Restoration Area, the Owner shall submit to the satisfaction of City Planning a Stage 3 Archaeological Assessment to determine the boundaries of the archaeological site(s).

 

vii. The Owner pay all costs associated with the implementation of the “Black Creek Valley Priority Restoration Area Stewardship Plan”.

 

q. School/Community Recreation Centre

 

i. An area not less than 1.79 hectares on Block B-1 as generally shown on Schedule 4 of the draft by-law will be reserved for a school and/or City of Toronto Community Recreation Facility. It is acknowledged that the City will initiate appropriate capital planning exercises and begin the design and construction of the community recreation centre, if necessary, at such time when a minimum of 4,000 residential units have received planning approvals in the Edge Precincts to ensure construction is completed in a timely manner for the full-build out of the Secondary Plan area, subject to City Council approval.

 

ii. The Owner may be required to convey to the Toronto District School Board, the Toronto Catholic District School Board and/or the City of Toronto a portion of Block B-1 to develop an elementary school and/or community recreation centre at fair market value.

 

r. The lands located to the west of Passy Crescent, identified as Blocks B-1 and B-2 on Schedule 4 of the draft by-law, are reserved for future community use and include a school and community centre and public park. These lands have not been subject to archaeological assessment. Should these lands be subject to any soil disturbance in the future a Stage1-2 Archaeological Assessment would be required by Heritage Preservation Services.

 

s. Prior to undertaking re-naturalization within the lands known as Block C in Schedule 4 of the draft by-law, a Stage 3 Archaeological Assessment will be undertaken for the lands within the re-naturalization area (Block C).

 

t. The Owner shall construct and maintain the development in accordance with Tier 1 performance measures of the Toronto Green Standard, as adopted by Toronto City Council at its meeting held on October 26 and 27, 2009 through the adoption of item PG32.3 of the Planning and Growth Committee.

 

u. The owner shall agree to the registration of a Section 118 Restriction pursuant to the Land Titles Act as the Chief Planner determines is appropriate for each of the public streets identified on the Draft Plan of Subdivision on Attachment 2 as well as Street A, park lands (Block B-2) and potential school/community centre lands (Block B-1) identified on Schedule 4 of the draft by-law.

 

v. The Section 37 Agreement must:

 

i. secure such conditions of subdivision approval as the Chief Planner determines are appropriate, and

 

ii. Require the Owner to enter into the City's standard Subdivision agreement for Phase 1 and satisfy the pre-registration conditions contained therein by September 1, 2017, or at a later date at the discretion of the Director, Development Engineering and Construction Services.

 

5. City Council authorize the installation of traffic control signals at the intersection of the Pond Road, Street D (Haynes Avenue extension) in co-ordination with the construction of Street D.

 

Decision Advice and Other Information

North York Community Council held a statutory public meeting on September 8, 2015 and notice was given in accordance with the Planning Act. No one addressed the North York Community Council on September 8, 2015.

Origin

(September 3, 2015) Report from the Director, Community Planning, North York District

Summary

These applications are subject to the new provisions of the Planning Act and the City of Toronto Act, 2006.

 

The applications propose to establish a plan of subdivision for a 6.22 hectare site and rezone the north-west 1.9 hectares (Phase 1) of the site known municipally as 4700 Keele Street. The subdivision application proposes to establish three development blocks for residential, commercial and institutional uses; a north/south public street to provide vehicular and pedestrian connections through the site from The Pond Road to Assiniboine Road; and a block reserved for a future north/south public road conveyance that will form part of the future extension of Ian MacDonald Boulevard which forms the easterly limit of the subdivision lands.

 

Phase 1 consists of two development blocks. The rezoning on Blocks 1 and 2 of the draft plan of subdivision would permit 487 residence units in two 6-storey private academic accommodations buildings with 2,762m2 of non-residential uses at grade. In total the proposal comprises a total gross floor area of 31,765 m2 and will include 60 affordable beds.

 

This report reviews and recommends approval of the application to amend the Zoning By-law, including the requirement for community benefits in return for increased height and density, in keeping with the provisions of Section 37 of the Planning Act and the policies of the Official Plan; and advises that the Chief Planner and Executive Director, City Planning, intends to approve the Draft Plan of Subdivision subject to the conditions as generally listed in Attachment No. 14.

 

The proposed development also forms part of the Southwest Precinct Plan Study Area, which is currently under review. The Southwest Precinct is envisioned as a medium density urban village with a variety of housing opportunities, shops and services with a neighbourhood square to provide social gathering opportunities and an identity for the precinct. The proposal is consistent with the draft Precinct Plan currently under review.  A report on the Precinct Plan and the accompanying Urban Design Guidelines and supporting strategies will be presented to Community Council in 2016.

Background Information

(September 3, 2015) Final Report and Attachments 1-14 from the Director, Community Planning, North York District on Zoning By-law Amendment and Subdivision Applications for 4700 Keele Street - South/East of The Pond Road and Sentinel Road
https://www.toronto.ca/legdocs/mmis/2015/ny/bgrd/backgroundfile-83378.pdf
(August 18, 2015) Notice of Pending Report from the Director, Community Planning, North York District on Zoning By-law Amendment and Subdivision Application for 4700 Keele Street
https://www.toronto.ca/legdocs/mmis/2015/ny/bgrd/backgroundfile-82962.pdf

Communications

(August 24, 2015) E-mail from Dennis De Rango, Specialized Services Team Lead, Hydro One (NY.Main.NY8.45.1)
https://www.toronto.ca/legdocs/mmis/2015/ny/comm/communicationfile-54601.pdf

Motions

1 - Motion to Amend Item moved by Councillor Anthony Perruzza (Carried)

That North York Community Council:

 

1.  Adopt the staff recommendations in the recommendations section of the report (September 3, 2015) from the Director, Community Planning, North York District, with the following amendment to Recommendation No. 4:

 

a.  That Recommendation 4.a. be deleted and replaced with the following:

 

"4.a.  That the applicant participate in the City's Public Art Program and provide a cash contibution in the amount of $400,000 in accordance with a Public Art Plan submitted by the owner to the safisfaction of the City.  The cash contribution shall be paid prior to the issuance of the first above grade building permit for buildings on lands identified in Schedule 1 of the draft by-law."

 

b.  Add a new Recommendation 4.b. as follows:

 

"4.b.  Prior to the issuance of the first above grade bulding permit for buildings on lands identified in Schedule 1 of the draft by-law, that the applicant be required to make a financial contribution paid to the City in the amount of $250,000 to be used for streetscape improvements and local parks upgrades to be determined by staff in conjunction with the Ward Councillor."


2 - Motion to Amend Item (Additional) moved by Councillor Anthony Perruzza (Carried)

That North York Community Council recommend that:

 

1.  City Council authorize the installation of traffic control signals at the intersection of the Pond Road, Street D (Haynes Avenue extension) in co-ordination with the construction of Street D.