Item - 2014.TE30.62
Tracking Status
- City Council adopted this item on March 20, 2014 without amendments.
- This item was considered by Toronto and East York Community Council on February 25, 2014 and was adopted with amendments. It will be considered by City Council on March 20, 2014.
- See also By-laws 257-2014, 258-2014
TE30.62 - Construction Staging Area - Wellington Street East
- Decision Type:
- ACTION
- Status:
- Adopted
- Ward:
- 28 - Toronto Centre-Rosedale
City Council Decision
City Council on March 20, 2014, adopted the following:
1. City Council approve the closure of the sidewalk and the curb lane on the north side of Wellington Street East, between Scott Street and a point 66.8 metres west of Scott Street, from March 21, 2014 to December 31, 2015.
2. City Council authorize the General Manager, Transportation Services to request the alteration and/or removal of the proposed staging area if required to accommodate the Pan Am festivities during the months of July and August 2015.
3. City Council approve the removal of the existing "Pay & Display" parking regulation on the north side of Wellington Street East, between Scott Street and Yonge Street.
4. City Council rescind the existing "No Stopping, 7:30 a.m. to 9:30 a.m., Mon. to Fri., except Public Holidays" restriction on the north side of Wellington Street East, between Scott Street and a point 71.8 metres west of Scott Street.
5. City Council enact a "No Stopping Anytime" restriction on the north side of Wellington Street East, between Scott Street and a point 71.8 metres west of Scott Street.
6. City Council direct that Wellington Street East be returned to its pre-construction traffic and parking regulations when the project is complete.
7. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.
8. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor.
Background Information (Community Council)
https://www.toronto.ca/legdocs/mmis/2014/te/bgrd/backgroundfile-66720.pdf
Drawing No. 421G-1329 - Construction Staging Area - Wellington Street East
https://www.toronto.ca/legdocs/mmis/2014/te/bgrd/backgroundfile-66721.pdf
Motions (City Council)
Vote (Adopt Item) Mar-20-2014 10:14 AM
| Result: Carried | Majority Required - TE30.62 - Adopt the item |
|---|---|
| Total members that voted Yes: 39 | Members that voted Yes are Paul Ainslie, Maria Augimeri, Ana Bailão, Michelle Berardinetti, Shelley Carroll, Raymond Cho, Josh Colle, Gary Crawford, Vincent Crisanti, Janet Davis, Glenn De Baeremaeker, Mike Del Grande, Frank Di Giorgio, Sarah Doucette, John Filion, Paula Fletcher, Doug Ford, Rob Ford, Mark Grimes, Norman Kelly, Peter Leon, Gloria Lindsay Luby, Josh Matlow, Pam McConnell, Mary-Margaret McMahon, Joe Mihevc, Peter Milczyn, Denzil Minnan-Wong, Ron Moeser, Frances Nunziata (Chair), Cesar Palacio, John Parker, James Pasternak, Gord Perks, Anthony Perruzza, David Shiner, Michael Thompson, Adam Vaughan, Kristyn Wong-Tam |
| Total members that voted No: 0 | Members that voted No are |
| Total members that were Absent: 6 | Members that were absent are Mary Fragedakis, Mike Layton, Chin Lee, Giorgio Mammoliti, Jaye Robinson, Karen Stintz |
TE30.62 - Construction Staging Area - Wellington Street East
- Decision Type:
- ACTION
- Status:
- Amended
- Ward:
- 28 - Toronto Centre-Rosedale
Community Council Recommendations
The Toronto and East York Community Council recommends that:
1. City Council approve the closure of the sidewalk and the curb lane on the north side of Wellington Street East, between Scott Street and a point 66.8 metres west of Scott Street, from March 21, 2014 to December 31, 2015.
2. City Council authorize the General Manager of Transportation Services to request the alteration and/or removal of the proposed staging area if required to accommodate the Pan Am festivities during the months of July and August 2015.
3. City Council approve the removal of the existing "Pay & Display" parking regulation on the north side of Wellington Street East, between Scott Street and Yonge Street.
4. City Council rescind the existing "No Stopping, 7:30 a.m. to 9:30 a.m., Mon. to Fri., except Public Holidays" restriction on the north side of Wellington Street East, between Scott Street and a point 71.8 metres west of Scott Street.
5. City Council enact a "No Stopping Anytime" restriction on the north side of Wellington Street East, between Scott Street and a point 71.8 metres west of Scott Street.
6. City Council direct that Wellington Street East be returned to its pre-construction traffic and parking regulations when the project is complete.
7. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.
8. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor.
Origin
Summary
Bird Construction is constructing a 58-storey condominium at No. 88 Scott Street, on the northwest corner of Wellington Street East and Scott Street. They need to close the north curb lane and sidewalk on Wellington Street East and establish a temporary pedestrian walkway in the north curb lane in order to do their work.
Bird Construction also needs to close the west sidewalk on Scott Street and the south sidewalk on Colborne Street. This matter is dealt with in a companion report "Construction Staging Area - Scott Street" requiring Toronto and East York Community Council approval.
Background Information
https://www.toronto.ca/legdocs/mmis/2014/te/bgrd/backgroundfile-66720.pdf
Drawing No. 421G-1329 - Construction Staging Area - Wellington Street East
https://www.toronto.ca/legdocs/mmis/2014/te/bgrd/backgroundfile-66721.pdf
Motions
That the Toronto and East York Community Council adopt the recommendations in the report (January 30, 2014) from the Director, Transportation Services, Toronto and East York District, subject to adding the following new Recommendations 7 and 8:
7. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site.
8. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for night-time illumination, at their sole cost, to the satisfaction of the Ward Councillor.