Item - 2013.TE23.22
Tracking Status
- City Council adopted this item on May 7, 8, 9 and 10, 2013 with amendments.
- This item was considered by Toronto and East York Community Council on April 9, 2013 and was adopted with amendments. It will be considered by City Council on May 7, 8, 9 and 10, 2013.
TE23.22 - Alteration of a Designated Heritage Property - 72 Wells Hill Avenue
- Decision Type:
- ACTION
- Status:
- Amended
- Ward:
- 21 - St. Paul's
City Council Decision
City Council on May 7, 8, 9 and 10, 2013, adopted the following:
1. City Council approve the proposed alterations to the heritage property at 72 Wells Hill Avenue, in accordance with the drawings prepared by AUDAXarchitecture dated February 25, 2013, subject to the following conditions:
a. Prior to June 30, 2013 the owner shall withdraw the appeal to the Conservation Review Board with respect to the City's Intention to Designate the property at 72 Wells Hill Avenue, to the satisfaction of the Manager, Heritage Preservation Services and the City Solicitor;
b. Prior to the issuance of any heritage permit for the proposal, including a heritage permit related to demolition, shoring, excavation and rebuilding of any building or structure on the subject property, the owner shall provide the following to the satisfaction of the Manager, Heritage Preservation Services:
i. A revised east elevation drawing that retains the main (east) entrance, where a paneled wood door is set in a segmental-arched surround protected by the open hip-roofed porch with brackets, and adjusts the design of the garage to make it distinct from and subordinate to the entrance;
ii. Building permit drawings substantially in accordance with the approved plans, including specifications for heritage conservation work, prepared by the project architect and a qualified heritage consultant;
iii. A licensed Engineer’s letter detailing how the retained portions of the heritage elements will be protected and made structurally sound throughout the construction process;
iv. Protection and conservation specifications for heritage elements including windows (to be replaced in kind and style), wood work, metal work, roofing, front porch, porch canopy and masonry, prepared by a qualified heritage consultant;
v. A landscape plan that maintains mature trees and the existing stone wall along the east perimeter;
vi. Documentation of the portions of the house that are proposed to be demolished, including plans, sections, elevations drawings and photographs; and
vii. A tree protection plan, prepared by a qualified Arborist, that describes the measures to be undertaken during and after construction, to maintain the health of the mature trees on the property; and
c. The owner shall complete the heritage conservation work to the satisfaction of the Manager, Heritage Preservation Services and upon completion of the project provide a Letter of Substantial Completion signed by the project architect and a qualified heritage consultant, accompanied by post construction photo-documentation.
Background Information (Community Council)
https://www.toronto.ca/legdocs/mmis/2013/te/bgrd/backgroundfile-56869.pdf
Communications (Community Council)
(April 9, 2013) Submission from Donald Loucks, Architect Urbanist Heritage Planner, IBI Group (TE.Supp.TE23.22.2)
(April 9, 2013) Letter from Danielle Torbay (TE.Supp.TE23.22.3)
(April 9, 2013) Letter from Robert Levy, President, Casa Loma Residents Association (TE.Supp.TE23.22.4)
Communications (City Council)
Motions (City Council)
That City Council amend Toronto and East York Community council Recommendation 1a by deleting the date "May 31, 2013" and inserting the date "June 30, 2013" so that it now reads as follows:
1. City Council approve the proposed alterations to the heritage property at 72 Wells Hill Avenue, in accordance with the drawings prepared by AUDAXarchitecture dated February 25, 2013, subject to the following conditions:
a. Prior to June 30, 2013 the owner shall withdraw the appeal to the Conservation Review Board with respect to the City's Intention to Designate the property at 72 Wells Hill Avenue, to the satisfaction of the Manager, Heritage Preservation Services and the City Solicitor.
Vote (Amend Item) May-07-2013 10:38 AM
| Result: Carried | Majority Required - TE23.22 - Mihevc - motion 1 |
|---|---|
| Total members that voted Yes: 42 | Members that voted Yes are Paul Ainslie, Maria Augimeri, Ana Bailão, Shelley Carroll, Raymond Cho, Josh Colle, Gary Crawford, Vincent Crisanti, Janet Davis, Glenn De Baeremaeker, Mike Del Grande, Frank Di Giorgio, Sarah Doucette, John Filion, Paula Fletcher, Doug Ford, Rob Ford, Mary Fragedakis, Mark Grimes, Doug Holyday, Norman Kelly, Mike Layton, Chin Lee, Gloria Lindsay Luby, Giorgio Mammoliti, Josh Matlow, Pam McConnell, Mary-Margaret McMahon, Joe Mihevc, Peter Milczyn, Ron Moeser, Frances Nunziata (Chair), Cesar Palacio, John Parker, James Pasternak, Gord Perks, Anthony Perruzza, Jaye Robinson, David Shiner, Michael Thompson, Adam Vaughan, Kristyn Wong-Tam |
| Total members that voted No: 0 | Members that voted No are |
| Total members that were Absent: 3 | Members that were absent are Michelle Berardinetti, Denzil Minnan-Wong, Karen Stintz |
Vote (Adopt Item as Amended) May-07-2013 10:39 AM
| Result: Carried | Majority Required - TE23.22 - Adopt the item as amended |
|---|---|
| Total members that voted Yes: 42 | Members that voted Yes are Paul Ainslie, Maria Augimeri, Ana Bailão, Shelley Carroll, Raymond Cho, Josh Colle, Gary Crawford, Vincent Crisanti, Janet Davis, Glenn De Baeremaeker, Mike Del Grande, Frank Di Giorgio, Sarah Doucette, John Filion, Paula Fletcher, Doug Ford, Rob Ford, Mary Fragedakis, Mark Grimes, Doug Holyday, Norman Kelly, Mike Layton, Chin Lee, Gloria Lindsay Luby, Giorgio Mammoliti, Josh Matlow, Pam McConnell, Mary-Margaret McMahon, Joe Mihevc, Peter Milczyn, Ron Moeser, Frances Nunziata (Chair), Cesar Palacio, John Parker, James Pasternak, Gord Perks, Anthony Perruzza, Jaye Robinson, David Shiner, Michael Thompson, Adam Vaughan, Kristyn Wong-Tam |
| Total members that voted No: 0 | Members that voted No are |
| Total members that were Absent: 3 | Members that were absent are Michelle Berardinetti, Denzil Minnan-Wong, Karen Stintz |
22a - Alteration of a Designated Heritage Property - 72 Wells Hill Avenue
Background Information (Community Council)
https://www.toronto.ca/legdocs/mmis/2013/te/bgrd/backgroundfile-57256.pdf
TE23.22 - Alteration of a Designated Heritage Property - 72 Wells Hill Avenue
- Decision Type:
- ACTION
- Status:
- Amended
- Ward:
- 21 - St. Paul's
Community Council Recommendations
The Toronto and East York Community Council recommends that:
1. City Council approve the proposed alterations to the heritage property at 72 Wells Hill Avenue, in accordance with the drawings prepared by AUDAXarchitecture dated February 25, 2013, subject to the following conditions:
a. Prior to May 31, 2013 the owner shall withdraw the appeal to the Conservation Review Board with respect to the City's Intention to Designate the property at 72 Wells Hill Avenue, to the satisfaction of the Manager, Heritage Preservation Services and the City Solicitor.
b. Prior to the issuance of any heritage permit for the proposal, including a heritage permit related to demolition, shoring, excavation and rebuilding of any building or structure on the subject property, the owner shall provide the following to the satisfaction of the Manager, Heritage Preservation Services:
i. A revised east elevation drawing that retains the main (east) entrance, where a paneled wood door is set in a segmental-arched surround protected by the open hip-roofed porch with brackets, and adjusts the design of the garage to make it distinct from and subordinate to the entrance.
ii. Building permit drawings substantially in accordance with the approved plans, including specifications for heritage conservation work, prepared by the project architect and a qualified heritage consultant.
iii. A licensed Engineer’s letter detailing how the retained portions of the heritage elements will be protected and made structurally sound throughout the construction process.
iv. Protection and conservation specifications for heritage elements including windows (to be replaced in kind and style), wood work, metal work, roofing, front porch, porch canopy and masonry, prepared by a qualified heritage consultant.
v. A landscape plan that maintains mature trees and the existing stone wall along the east perimeter.
vi. Documentation of the portions of the house that are proposed to be demolished, including plans, sections, elevations drawings and photographs.
vii. A tree protection plan, prepared by a qualified Arborist, that describes the measures to be undertaken during and after construction, to maintain the health of the mature trees on the property.
c. The owner shall complete the heritage conservation work to the satisfaction of the Manager, Heritage Preservation Services and upon completion of the project provide a Letter of Substantial Completion signed by the project architect and a qualified heritage consultant, accompanied by post construction photo-documentation.
Decision Advice and Other Information
The Toronto and East York Community Council requested:
1. The Acting Manager, Heritage Preservation Services to submit a report directly to City Council for its meeting on May 7, 2013, confirming that the design and configuration of the proposed garage at 72 Wells Hill Avenue is in compliance with the Zoning By-law.
2. The Acting Manager, Heritage Preservation Services to attend one or two meetings with local residents of the Wells Hill Community to give advice on the research required for a Heritage Conservation District designation and how community volunteers can assist in laying the groundwork for a consultant who will be eventually hired.
Origin
Summary
This report recommends that City Council approve the proposed alteration to the designated heritage property located at 72 Wells Hill Avenue, subject to conditions.
Background Information
https://www.toronto.ca/legdocs/mmis/2013/te/bgrd/backgroundfile-56869.pdf
Communications
(April 9, 2013) Submission from Donald Loucks, Architect Urbanist Heritage Planner, IBI Group (TE.Supp.TE23.22.2)
(April 9, 2013) Letter from Danielle Torbay (TE.Supp.TE23.22.3)
(April 9, 2013) Letter from Robert Levy, President, Casa Loma Residents Association (TE.Supp.TE23.22.4)
Speakers
Motions
The Toronto and East York Community Council:
A. Recommended that:
1. City Council adopt the recommendations in the letter (April 2, 2013) from the Toronto Preservation Board.
B. Requested:
1. The Acting Manager, Heritage Preservation Services to submit a report directly to City Council for its meeting on May 7, 2013, confirming that the design and configuration of the proposed garage at 72 Wells Hill Avenue is in compliance with the Zoning By-law.
2. The Acting Manager, Heritage Preservation Services to attend one or two meetings with local residents of the Wells Hill Community to give advice on the research required for a Heritage Conservation District designation and how community volunteers can assist in laying the groundwork for a consultant who will be eventually hired.
22a - Alteration of a Designated Heritage Property - 72 Wells Hill Avenue
Origin
Summary
The Toronto Preservation Board on March 27, 2013, considered the following:
1. Report (March 12, 2013) from the Director, Urban Design, City Planning Division, respecting Alteration of a Designated Heritage Property - 72 Wells Hill Avenue.
2. E-mail (March 25, 2013) from Brian Barron.
3. Submission (March 27, 2013) from Gianpiero Pugliese, AUDAXarchitecture inc.
The following persons addressed the Toronto Preservation Board:
- Dr. Leonore Loft
- Joel D. Farber, Partner, Fogler, Rubinoff LLP
- Gianpiero Pugliese, AUDAXarchitecture inc. (Submission Filed)
- Kerry Wood
- Lucia LeGuen
- Robert Levy, President, Casa Loma Residents Association
- Howard Adelman
Background Information
https://www.toronto.ca/legdocs/mmis/2013/te/bgrd/backgroundfile-57256.pdf