PW9.5 - Implementation of Findings from Comparative Analysis of Pipe Materials Study for Large Diameter Transmission Watermains

Decision Type:
ACTION
Status:
Adopted
Wards:
All

City Council Decision

City Council on February 6 and 7, 2012, adopted the following:

 

1.         City Council approve the use of alternative pipe materials for large diameter transmission watermains including (i) pre-stressed concrete cylinder pipe (PCCP); (ii) polyvinyl chloride (PVC); (iii) high density polyethylene (HDPE); (iv) steel; and (v) continuously welded steel pipe with a mortar lining, all designed in accordance with American Water Works Association (AWWA) standards.

 

2.         City Council direct staff to:

 

a.         develop and implement a design standard requiring an additional level of protection to the above noted alternative pipe material in locations and areas of the City that are deemed high risk and where failure or damage is unacceptable; and

 

b.         identify these high risk locations or areas requiring additional protection during the Environmental Assessment phase and/or the pre-design phase of any specific large diameter transmission watermain project.

 

3.         City Council direct staff to fully implement Parts 1 and 2 above within 90 days of the passing of this report by Council and that this process be applied to all future large diameter transmission watermain projects within the City of Toronto.

Background Information (Committee)

(October 19, 2011) Report from the General Manager, Toronto Water, and the Executive Director, Technical Services, on Implementation of Findings from Comparative Analysis of Pipe Materials Study
https://www.toronto.ca/legdocs/mmis/2011/pw/bgrd/backgroundfile-41849.pdf
(November 3, 2011) Large Diameter Transmission Watermains - Pipe Materials Study - Presentation
https://www.toronto.ca/legdocs/mmis/2011/pw/bgrd/backgroundfile-42171.pdf

Background Information (City Council)

Communications (Committee)

(November 3, 2011) Submission from Silvio De Gasperis, President, TACC Construction (PW.New.PW9.5.1)

Communications (City Council)

(November 23, 2011) E-mail from Bruce Hollands, Executive Director, PVC Pipe Association (CC.Supp.PW9.5.2)
https://www.toronto.ca/legdocs/mmis/2012/cc/comm/communicationfile-27637.pdf
(November 25, 2011) Letter from Dr. Patrick Moore, Chairman and Chief Scientist, Greenspirit Strategies Ltd. (CC.Supp.PW9.5.3)
https://www.toronto.ca/legdocs/mmis/2012/cc/comm/communicationfile-27638.pdf
(November 24, 2011) E-mail from Marion E. Axmith, Director General, Canadian Plastics Industry Association (CC.Supp.PW9.5.4)
https://www.toronto.ca/legdocs/mmis/2012/cc/comm/communicationfile-27639.pdf
(January 19, 2012) Letter from Tom Moulton, Branch Manager, Emco Corporation (CC.Main.PW9.5.5)
https://www.toronto.ca/legdocs/mmis/2012/cc/comm/communicationfile-28354.pdf
(January 16, 2012) Fax from Isaac Olapade (CC.Main.PW9.5.6)
(January 16, 2012) Fax from Gurminder Ubhi (CC.Main.PW9.5.7)
(January 16, 2012) Fax from Edward Hylton (CC.Main.PW9.5.8)
(January 16, 2012) Fax from Girmay Hagos (CC.Main.PW9.5.9)
(January 16, 2012) Letter from Danielle Smart (CC.Main.PW9.5.10)
(January 16, 2012) Letter from Anita Cheung (CC.Main.PW9.5.11)
(January 16, 2012) Letter from Oren Wenner (CC.Main.PW9.5.12)
(January 16, 2012) Letter from Stephen Shimano (CC.Main.PW9.5.13)
(January 16, 2012) Letter from Anatolie Pihut (CC.Main.PW9.5.14)
(January 16, 2012) Letter from Stephen Ryan (CC.Main.PW9.5.15)
(January 16, 2012) Letter from Maria Occhiuto (CC.Main.PW9.5.16)
(January 16, 2012) Letter from Smaran Das (CC.Main.PW9.5.17)
(January 16, 2012) Letter from John Nashmi (CC.Main.PW9.5.18)
(January 26, 2012) Letter from Mark Orcutt, Royal Building Products, (CC.Supp.PW9.5.19)
https://www.toronto.ca/legdocs/mmis/2012/cc/comm/communicationfile-28399.pdf
(January 16, 2012) Multiple Communications from 450 persons submitting two form letters (CC.Supp.PW9.5.20)
https://www.toronto.ca/legdocs/mmis/2012/cc/comm/communicationfile-28401.pdf
(February 3, 2012) Submission from Councillor Gord Perks, Ward 14, Parkdale - High Park - document entitled "PVC Policies Across the World" (CC.New.PW9.5.21)
https://www.toronto.ca/legdocs/mmis/2012/cc/comm/communicationfile-28414.pdf
(February 3, 2012) Letter from Paul J. Czachor, Vice President and General Manager, Pipe and Fittings Solutions, Royal Builiding Products (CC.New.PW9.5.22)
https://www.toronto.ca/legdocs/mmis/2012/cc/comm/communicationfile-28415.pdf

Motions (City Council)

1 - Motion to Amend Item moved by Councillor Gord Perks (Lost)

That Recommendation 1 in the report (October 19, 2011) from the General Manager, Toronto Water and the Executive Director, Technical Services, be amended by deleting the words "(ii) polyvinyl chloride (PVC)", and renumbering the remaining roman numerals, so that Recommendation 1 now reads as follows:

 

"1.       City Council approve the use of alternative pipe materials for large diameter transmission watermains including (i) pre-stressed concrete cylinder pipe (PCCP); (ii) high density polyethylene (HDPE); (iii) steel; and (iv) continuously welded steel pipe with a mortar lining, all designed in accordance with American Water Works Association (AWWA) standards."

Vote (Amend Item) Feb-06-2012 3:36 PM

Result: Lost Majority Required - PW9.5 - Perks - motion 1
Total members that voted Yes: 17 Members that voted Yes are Maria Augimeri, Shelley Carroll, Raymond Cho, Janet Davis, Glenn De Baeremaeker, Sarah Doucette, Paula Fletcher, Mary Fragedakis, Mike Layton, Chin Lee, Josh Matlow, Pam McConnell, Mary-Margaret McMahon, Joe Mihevc, Gord Perks, Adam Vaughan, Kristyn Wong-Tam
Total members that voted No: 19 Members that voted No are Ana Bailão, Michelle Berardinetti, Gary Crawford, Vincent Crisanti, Frank Di Giorgio, Doug Ford, Rob Ford, Mark Grimes, Doug Holyday, Norman Kelly, Giorgio Mammoliti, Peter Milczyn, Denzil Minnan-Wong, Frances Nunziata (Chair), Cesar Palacio, John Parker, James Pasternak, David Shiner, Karen Stintz
Total members that were Absent: 9 Members that were absent are Paul Ainslie, Josh Colle, Mike Del Grande, John Filion, Gloria Lindsay Luby, Ron Moeser, Anthony Perruzza, Jaye Robinson, Michael Thompson

Motion to Adopt Item (Carried)

Vote (Adopt Item) Feb-06-2012 3:37 PM

Result: Carried Majority Required - PW9.5 - Adopt the item
Total members that voted Yes: 23 Members that voted Yes are Ana Bailão, Michelle Berardinetti, Raymond Cho, Gary Crawford, Vincent Crisanti, Glenn De Baeremaeker, Frank Di Giorgio, Doug Ford, Rob Ford, Mark Grimes, Doug Holyday, Norman Kelly, Chin Lee, Giorgio Mammoliti, Josh Matlow, Peter Milczyn, Denzil Minnan-Wong, Frances Nunziata (Chair), Cesar Palacio, John Parker, James Pasternak, David Shiner, Karen Stintz
Total members that voted No: 13 Members that voted No are Maria Augimeri, Shelley Carroll, Janet Davis, Sarah Doucette, Paula Fletcher, Mary Fragedakis, Mike Layton, Pam McConnell, Mary-Margaret McMahon, Joe Mihevc, Gord Perks, Adam Vaughan, Kristyn Wong-Tam
Total members that were Absent: 9 Members that were absent are Paul Ainslie, Josh Colle, Mike Del Grande, John Filion, Gloria Lindsay Luby, Ron Moeser, Anthony Perruzza, Jaye Robinson, Michael Thompson

PW9.5 - Implementation of Findings from Comparative Analysis of Pipe Materials Study for Large Diameter Transmission Watermains

Decision Type:
ACTION
Status:
Deferred
Wards:
All

City Council Decision

City Council on November 29, 30 and December 1, 2011, deferred consideration of Item PW9.5 to the next regular City Council meeting on February 6 and 7, 2012 or to a special meeting called by the Mayor to consider the items remaining on the agenda.

City Council Decision Advice and Other Information

City Council on December 1, 2011 adopted a motion to defer any remaining Items on the agenda to the next regular meeting of City Council on February 6 and 7, 2012 or to a special meeting called by the Mayor for that purpose.

 

The following Items were subsequently deferred:

 

Planning and Growth Management Committee Item PG9.11

Public Works and Infrastructure Committee Item PW9.5

Public Works and Infrastructure Committee Item PW9.10

New Business Item CC14.7, and

Member Motion MM14.28

Background Information (Committee)

(October 19, 2011) Report from the General Manager, Toronto Water, and the Executive Director, Technical Services, on Implementation of Findings from Comparative Analysis of Pipe Materials Study
https://www.toronto.ca/legdocs/mmis/2011/pw/bgrd/backgroundfile-41849.pdf
(November 3, 2011) Large Diameter Transmission Watermains - Pipe Materials Study - Presentation
https://www.toronto.ca/legdocs/mmis/2011/pw/bgrd/backgroundfile-42171.pdf

Communications (Committee)

(November 3, 2011) Submission from Silvio De Gasperis, President, TACC Construction (PW.New.PW9.5.1)

Communications (City Council)

(November 23, 2011) E-mail from Bruce Hollands, Executive Director, PVC Pipe Association (CC.Supp.PW9.5.2)
https://www.toronto.ca/legdocs/mmis/2011/cc/comm/communicationfile-27051.pdf
(November 25, 2011) Letter from Dr. Patrick Moore, Chairman and Chief Scientist, Greenspirit Strategies Ltd. (CC.Supp.PW9.5.3)
https://www.toronto.ca/legdocs/mmis/2011/cc/comm/communicationfile-27052.pdf
(November 24, 2011) E-mail from Marion E. Axmith, Director General, Canadian Plastics Industry Association (CC.Supp.PW9.5.4)
https://www.toronto.ca/legdocs/mmis/2011/cc/comm/communicationfile-27053.pdf

Motions (City Council)

Motion to Refer Item moved by Councillor Gord Perks (Final)

That City Council refer Item PW9.5 back to the General Manager, Toronto Water, the Executive Director, Technical Services, and the Director, Toronto Environment Office to prepare a report on the life-cycle environmental impacts of PVC to the Public Works and Infrastructure Committee.


Motion to Defer Item moved by Councillor Paul Ainslie (Carried)

That City Council defer any remaining items on the agenda to the next regular meeting on February 6 and 7, 2012 or to a special meeting called by the Mayor for that purpose.

Vote (Defer Item) Dec-01-2011 7:47 PM

Result: Carried Majority Required - Defer remaining items
Total members that voted Yes: 19 Members that voted Yes are Paul Ainslie, Ana Bailão, Michelle Berardinetti, Raymond Cho, Josh Colle, Gary Crawford, Vincent Crisanti, Mike Del Grande, Doug Ford, Rob Ford, Mark Grimes, Doug Holyday, Norman Kelly, Gloria Lindsay Luby, Ron Moeser, Cesar Palacio, John Parker, James Pasternak, Jaye Robinson
Total members that voted No: 16 Members that voted No are Maria Augimeri, Shelley Carroll, Glenn De Baeremaeker, John Filion, Paula Fletcher, Mary Fragedakis, Mike Layton, Josh Matlow, Mary-Margaret McMahon, Joe Mihevc, Peter Milczyn, Frances Nunziata (Chair), Gord Perks, Anthony Perruzza, Adam Vaughan, Kristyn Wong-Tam
Total members that were Absent: 10 Members that were absent are Janet Davis, Frank Di Giorgio, Sarah Doucette, Chin Lee, Giorgio Mammoliti, Pam McConnell, Denzil Minnan-Wong, David Shiner, Karen Stintz, Michael Thompson

PW9.5 - Implementation of Findings from Comparative Analysis of Pipe Materials Study for Large Diameter Transmission Watermains

Decision Type:
ACTION
Status:
Adopted
Wards:
All

Committee Recommendations

The Public Works and Infrastructure Committee recommends that:

 

1.         City Council approve the use of alternative pipe materials for large diameter transmission watermains including (i) pre-stressed concrete cylinder pipe (PCCP); (ii) polyvinyl chloride (PVC); (iii) high density polyethylene (HDPE); (iv) steel; and (v) continuously welded steel pipe with a mortar lining, all designed in accordance with American Water Works Association (AWWA) standards.

 

2.         Should recommendation 1 be adopted, City Council direct staff to:

 

a.         develop and implement a design standard requiring an additional level of protection to the above noted alternative pipe material in locations and areas of the City that are deemed high risk and where failure or damage is unacceptable; and

 

b.         identify these high risk locations or areas requiring additional protection during the Environmental Assessment phase and/or the pre-design phase of any specific large diameter transmission watermain project.

 

3.         City Council direct staff to fully implement the above recommendations, if approved, within 90 days of the passing of this report by Council and that this process be applied to all future large diameter transmission watermain projects within the City of Toronto.

Origin

(October 19, 2011) Report from the General Manager, Toronto Water, and the Executive Director, Technical Services

Summary

This report recommends City Council approve the use of alternative pipe materials for large diameter transmission watermains.  Presently, the standard used by the City of Toronto for large diameter transmission watermains (typically 750mm or larger) is cement mortar lined steel pipe with continuously welded joints, fully encased in poured concrete.  This has been the standard pipe material used for large diameter transmission watermains since the 1950s.

 

The findings of a recent study completed by Cole Engineering Group Ltd. and titled "2011 Comparative Analysis of Pipe Materials Study for Large Diameter Transmission Mains" concludes that although the present City of Toronto standard is very durable, no one pipe material is conclusively better than another.  The study recommends that future construction tenders allow multiple pipe materials which meet performance specifications, such as pre-stressed concrete cylinder pipe (PCCP), steel welded pipe, polyvinyl chloride (PVC) pipe, and high density polyethylene (HDPE) pipe.

 

In addition, it is recognized that critical or high risk locations, require additional protection from external forces.  Specifically, all pipe materials may require the additional protection provided by welded or restrained joints and be encased in material (i.e. concrete or special liners) to protect the pipe in geographic locations where failure or damage to the pipe is unacceptable. Examples of these types of areas include, but are not limited to, locations close to critical infrastructure and other major utilities; significant institutional and commercial neighbourhoods; poor local ground conditions; watercourse and protected areas; and areas without redundancy in the water supply network.

 

In summary, this report proposes a broader group of pipe materials to be allowed for large diameter transmission watermains, provided they can meet the designed performance standard required in that specific situation, and in locations that are considered high risk or operationally critical, that a standard be developed to provide a higher level of protection to the pipe in those locations thus ensuring safe operations and security of water supply.  This approach promotes competition and realizes potential capital cost and construction time savings while ensuring the system performance needs are met.

Background Information

(October 19, 2011) Report from the General Manager, Toronto Water, and the Executive Director, Technical Services, on Implementation of Findings from Comparative Analysis of Pipe Materials Study
https://www.toronto.ca/legdocs/mmis/2011/pw/bgrd/backgroundfile-41849.pdf
(November 3, 2011) Large Diameter Transmission Watermains - Pipe Materials Study - Presentation
https://www.toronto.ca/legdocs/mmis/2011/pw/bgrd/backgroundfile-42171.pdf

Communications

(November 3, 2011) Submission from Silvio De Gasperis, President, TACC Construction (PW.New.PW9.5.1)

Speakers

Bruce Hollands, Executive Director, Uni-Bell PVC Pipe Association
Silvio De Gasperis, President, TACC Construction Ltd. (Submission Filed)
Benoit Tanguay, Engineering Director, Munro Ltd.
Councillor Giorgio Mammoliti

Motions

1 - Motion to Amend Item moved by Councillor Gord Perks (Lost)

That Recommendation 1 in the report (October 19, 2011) from the General Manager, Toronto Water and the Executive Director, Technical Services, be amended by deleting the words "(ii) polyvinyl chloride (PVC)", and renumbering the remaining roman numerals, so that Recommendation 1 now reads as follows:

 

"1.        City Council approve the use of alternative pipe materials for large diameter transmission watermains including (i) pre-stressed concrete cylinder pipe (PCCP); (ii) high density polyethylene (HDPE); (iii) steel; and (iv) continuously welded steel pipe with a mortar lining, all designed in accordance with American Water Works Association (AWWA) standards."


2 - Motion to Adopt Item moved by Councillor David Shiner (Carried)