NY33.46 - Final Report - 470 Sentinel Road and 1, 35 and 40 Fountainhead Road Official Plan Amendment and Rezoning Applications and 35 Fountainhead Road Draft Plan of Subdivision Application

Decision Type:
ACTION
Status:
Amended
Ward:
8 - York West

City Council Decision

City Council on May 11 and 12, 2010, adopted the following:

 

1.         City Council amend the Official Plan substantially in accordance with the draft Official Plan Amendment attached as Attachment No. 9 to the report (October 8, 2009) from the Director, Community Planning, North York District.

 

2.         City Council amend the Zoning By-law for the lands at 470 Sentinel Road and 1, 35 and 40 Fountainhead Road substantially in accordance with the draft Zoning By-law Amendment attached as Attachment No. 10 to the report (October 8, 2009) from the Director, Community Planning, North York District, with the following amendment:

 

a.         That the parking ratios at the existing rental buildings remain as at present.

 

3.         City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Official Plan and Zoning By-law Amendments as may be required.

 

4.         Before introducing the necessary Bills to City Council for enactment, City Council require that the owner of the lands shall enter into an agreement with the City pursuant to Section 37 of the Planning Act, to the satisfaction of the City Solicitor, to secure and provide the following community benefits:

 

a.         the rental tenure of the four existing apartment buildings on the site and the maintenance of their affordable and mid-range rents for a minimum of 25 years from the date any by-law to permit additional development comes into effect, and agreement by the owner that during this time period no application for condominium conversion or application to demolish the existing buildings will be made;

 

b.         design, construct, provide and maintain at its own cost a new private recreation centre building of a minimum 2,200 m2 of gross floor area which is to include a minimum 1,100 m2 private recreation centre facility.  The recreation centre facility is for use by the residents of the existing rental apartment buildings at no cost to the tenants.  The recreation centre facility is to include an indoor swimming pool and change rooms;

 

The recreation centre building is to be constructed as part of Phase 1.  Prior to or together with the issuance of a building permit for Building L, and prior to the issuance of any building permit for Buildings I, J, K, E and F in Phases 2 and 3, construction shall have commenced on the recreation centre building.  The recreation centre facility shall be completed and ready for operation by the completion and occupancy of Building L and prior to the issuance of any building permit for Buildings I, J, K, E and F in Phases 2 and 3;

 

c.         construct and provide, to the satisfaction of Children’s Services Division, in the private recreation centre building a fully furnished and equipped 66 space non-profit child care centre of a minimum 1,100 m2 of gross floor area and a minimum 345 m2 of outdoor play space which will be appropriately surfaced and equipped and subject to City design criteria.  The child care centre is to be secured for a period of 99 years;

 

The child care centre is to be constructed and in operation as part of Phase 1.  Prior to or together with the issuance of a building permit for Building L, and prior to the issuance of any building permit for Buildings I, J, K, E and F in Phases 2 and 3, construction shall have commenced on the child care centre.  The child care centre shall be completed and ready for operation by the completion and occupancy of Building L and prior to the issuance of any building permit for Buildings I, K, E and F in Phases 2 and 3.

 

The owner agrees to provide a monetary contribution, indexed to the Statistics Canada Non-residential Construction Price Index for Toronto from the date this By-law comes into force, to the child care centre of:

 

i.          $150,000 for start up costs; and

ii.         $50,000 to a capital reserve equipment fund to provide for the replacement of equipment

 

by the completion and occupancy of Building L and prior to issuance of any building permit for Buildings I, K, E and F in Phases 2 and 3;

 

d.         the owner agrees to provide to the City a financial contribution of $700,000, indexed to the Statistics Canada Non-residential Construction Price Index for Toronto from the date this By-law comes into force, to be used towards the construction of an artificial outdoor ice rink in Fountainhead Park.  The financial contribution is to be provided as part of Phase 1 prior to the issuance of a building permit for Building L and prior to the issuance of any building permit for Buildings I, J, K, E and F in Phases 2 and 3, to the satisfaction of the General Manager, Parks, Forestry and Recreation;

 

e.         the owner agrees to provide to the City a financial contribution of a maximum of $1 million in instalments, for deposit to the City’s Capital Revolving Fund for Affordable Housing, with each instalment to be paid prior to issuance of the related above-grade building permit.  For Buildings E, F, G, H, I, J, K and L, each instalment amount is based on $1,000 per dwelling unit included in the related building permit to be issued, to a total for all of the buildings not to exceed $1 million, together with the indexing amount for that instalment.  Each instalment shall be indexed to the Statistics Canada New Housing Construction Price Index for Toronto from the date this By-law comes into force to the date of payment;

 

f.          a public art contribution of $250,000, indexed to the Statistics Canada Non-residential Construction Price Index for Toronto from the date this By-law comes into force, in accordance with the City of Toronto’s Percent For Public Art Program;

 

g.         prepare and implement a ravine stewardship plan for the public lands located in the valley and the lands located below and above the staked top-of-bank line being conveyed to the Toronto and Region Conservation Authority, to the satisfaction of the Toronto and Region Conservation Authority and Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division:

 

i.          a Letter of Credit to secure the preparation of the ravine stewardship plan shall be submitted to the Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division prior to master site plan approval, to the satisfaction of the Toronto and Region Conservation Authority and Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division; and

 

ii.         a Letter of Credit guaranteeing the implementation of the ravine stewardship plan shall be submitted to the Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division prior to Phase 1 site plan approval, to the satisfaction of the Toronto and Region Conservation Authority and Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division; and

 

h.         the owner agrees that the above noted facilities, services and/or matters shall be provided with no pass through of related costs to the tenants of the existing buildings.

 

5.         Before introducing the necessary Bills to City Council for enactment, City Council require that the owner of the lands shall enter into an agreement with the City pursuant to Section 37 of the Planning Act, to the satisfaction of the City Solicitor, to secure and provide the following:

 

a.         net improvements to the existing rental buildings that are to be maintained and their related facilities with no pass through of related costs to the tenants, to the satisfaction of the Director, Community Planning, North York District.  These improvements are generally as set out in Attachment 8 and are to have a minimum value of $5 million.  The improvements are to be completed prior to the issuance of a building permit for Buildings E and F in Phase 3;

 

b.         construction shall proceed in accordance with the development Phasing Plan;

 

c.         the owner agrees to convey to the City for nominal consideration:

 

i.          lands for the extension of Fountainhead Road to Finch Avenue;

ii.          lands for road widenings; and

iii.         lands to provide a cul-de-sac at the west end of Fountainhead Road

 

as set out in the Technical Services Division memorandum dated May 14, 2009 to the satisfaction of the Director, Technical Services, North York District;

 

d.         the owner agrees to commence construction of the extension of Fountainhead Road to Finch Avenue including a new signalized intersection, road widenings, and a cul-de-sac at the west end of Fountainhead Road, all as part of Phase 1 and to complete these road works prior to the issuance of any building permit for Buildings I, J, K, E and F in Phases 2 and 3 to the satisfaction of the Director, Technical Services, North York District;

 

e.         develop and implement an appropriate construction mitigation and communications strategy for the tenants of the existing buildings and residents of the new residential buildings at the owner’s cost and expense, to the satisfaction of the Director, Transportation Services, North York District;

 

f.          the owner agrees to provide and maintain a green roof with a continuous coverage of vegetation over at least 50% of the roof of the recreation centre building, to be implemented through site plan approval, to the satisfaction of the Director, Community Planning, North York District;

 

g.         dedicate and convey to the Toronto and Region Conservation Authority for nominal consideration, all the lands below and above the staked top of bank line as shown on Zoning By-law Schedules RM6(182)A, RM6(182)B, and RM6(182)C having an area of approximately 0.475 hectares, to the satisfaction of the Toronto and Region Conservation Authority and the City Solicitor, prior to the registration of the first condominium in Phase 1;

 

h.         prepare and implement a forest stewardship plan for the forested areas on the site north of Fountainhead Road and south of the hydro corridor, to the satisfaction of the Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division:

 

i.          a Letter of Credit to secure the preparation of the forest stewardship plan shall be submitted prior to master site plan approval, to the satisfaction of the Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division; and

 

ii.         a Letter of Credit guaranteeing the implementation of the forest stewardship plan shall be submitted prior to Phase 3 site plan approval, to the satisfaction of the Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division;

 

i.          the landscape master plan valued at a minimum of $1,500,000 to form the basis for detailed landscape plans for on site landscape improvements which will be secured through an agreement pursuant to Section 41 of the Planning Act and Section 114 of the City of Toronto Act;

 

j.          buildings E and J will be marketed as seniors residences.  The buildings will include common and shared facilities such as kitchens and common dining rooms;

 

k.         the owner agrees to provide a certified cheque to the Toronto Transit Commission (T.T.C.) for $50,000 for transit signal priority intersection improvements as noted in the memorandum of the Toronto Transit Commission dated December 23, 2008.  This is to be paid to the T.T.C. prior to the issuance of any building permit;

 

l.          provide a revised stormwater management plan as part of master site plan approval to the satisfaction of the Toronto and Region Conservation Authority and the Director, Technical Services, North York District; and

 

m.        the owner agrees that the above noted facilities, services and/or matters shall be provided with no pass through of related costs to the tenants of the existing buildings.

 

6.         City Council recommend to the Chief Planner that the Draft Plan of Subdivision be approved, generally as illustrated on Attachment 3 to the report (October 8, 2009) from the Director, Community Planning, North York District, subject to:

 

a.         the conditions as generally listed in Attachment 11 to the report (October 8, 2009) from the Director, Community Planning, North York District, which except as otherwise noted, must be fulfilled prior to the release of the plan of subdivision for registration; and

 

b.         such revisions to the proposed plan of subdivision or additional or modified conditions as the Chief Planner may deem to be appropriate to address matters arising from the on-going technical review of the development.

 

7.         City Council require that the indoor amenity space for Phase I of the development be 1.5 m² per unit.

 

8.         City Council direct that prior to the construction of Phase II, the City Planning Division shall, at the expense of the applicant, undertake a review of the existing rental buildings and the occupancy of Phase I buildings (excluding the seniors building) to determine the number of units that are occupied by university students.

 

9.         City Council direct that the number of m² of indoor amenity above 1.5 m² per dwelling unit for Phase II shall be determined by this review in order to ensure that amenities of the type that can provide study and recreation facilities suitable for students are included in Phase II.

 

10.       City Council direct that should it be found that there are a significant number of students, Phase II amenity space ratio shall be increased up to 2.5 m² per dwelling unit to accommodate students in Phase I and the rental buildings as well as the anticipated university occupants of Phase II.

 

11.       City Council direct that approvals for on-site tree replacement and planting shall be subject to a report from Urban Forestry to be considered by the North York Community Council.

 

12.       City Council authorize the City Solicitor and any necessary witnesses to attend at the Ontario Municipal Board to support the decision of Council.

 

13.       City Council receive for information, the supplementary report (May 10, 2010) from the City Solicitor, and direct that Confidential Attachments 1 and 2 to the report remain confidential in their entirety, in accordance with the provisions of the City of Toronto Act, 2006, as they relate to litigation or potential litigation that affects the City or one of its agencies, boards and commissions, and contain advice or communications that are subject to solicitor-client privilege.

 

Confidential Attachments 1 and 2 to the report (May 10, 2010) from the City Solicitor remains confidential in their entirety, in accordance with the provisions of the City of Toronto Act, 2006, as they relates to litigation or potential litigation that affects the City or one of its agencies, boards and commissions, and contain advice or communications that are subject to solicitor-client privilege.

City Council Decision Advice and Other Information

City Council recessed its public session and met as Committee of the Whole in closed session on May 11, 2010, and considered confidential information on this Item as it relates to litigation or potential litigation that affects the City or one of its agencies, boards and commissions, and contains advice that is subject to solicitor-client privilege.

 

Confidential Attachment - Litigation or potential litigation, including matters before administrative tribunals, affecting the municipality or local board; receiving of advice that is subject to solicitor-client privilege.

Background Information (Community Council)

Final Report & Attachments 1-11 - 470 Sentinel Rd & 1, 35 & 40 Fountainhead Rd
https://www.toronto.ca/legdocs/mmis/2010/ny/bgrd/backgroundfile-29097.pdf

Background Information (City Council)

(May 10, 2010) supplementary report from the City Solicitor (NY33.46d)
https://www.toronto.ca/legdocs/mmis/2010/cc/bgrd/backgroundfile-30160.pdf

Communications (Community Council)

(October 22, 2009) E-mail from John Newton (NY.Main.NY33.46.1)
(October 23, 2009) Letter from M. Armstrong (NY.Main.NY33.46.2)
(October 30, 2009) E-mail from Robert Calderan (NY.Main.NY33.46.3)
(November 1, 2009) E-mail from Uri Zellermayer (NY.Main.NY33.46.4)
(November 2, 2009) E-mail from Hodari Clarke (NY.Main.NY33.46.5)
(November 3, 2009) E-mail from Xin (Melissa) Chang (NY.Main.NY33.46.6)
(November 4, 2009) E-mail from Uri Zellermayer (NY.Main.NY33.46.7)
(November 7, 2009) E-mail from Ruth Nusbaum and Rita Boudreau (NY.Main.NY33.46.8)
(November 10, 2009) E-mail from Michael Tilley (NY.Main.NY33.46.9)
(November 10, 2009) Letter from Michael J. Spence (NY.Main.NY33.46.10)
(November 10, 2009) Submission from Elizabeth Ujvari (NY.Main.NY33.46.11)
(November 10, 2009) Petition from Peter Wolfl, signed by 282 area residents in opposition to the proposed application (NY.Main.NY33.46.12)
(November 10, 2009) Submission from Peter Wolfl (NY.Main.NY33.46.13)
(November 10, 2009) Submission from Katherine Chisholm (NY.Main.NY33.46.14)
(January 8, 2010) E-mail from Peter Wolfl (NY.Main.NY33.46.15)
(January 12, 2010) Submission from Elizabeth Ujvari (NY.Main.NY33.46.16)
(January 18, 2010) E-mail from Peter Wolfl (NY.Main.NY33.46.17)
(January 25, 2010) Letter from Kim Kovar, Aird & Berlis, LLP, on behalf of the applicant (NY.Main.NY33.46.18)
(January 25, 2010) Letter from Katherine Chisholm (NY.Main.NY33.46.19)
(January 22, 2010) E-mail from Peter Wolfl, addressed to Councillor Perruzza (NY.Main.NY33.46.20)
(April 25, 2010) E-mail from Elizabeth Ujvari (NY.New.NY33.46.21)
(April 26, 2010) E-mail from Elizabeth Ujvari (NY.New.NY33.46.22)

Motions (City Council)

Report of Committee of the Whole

May 11, 2010 at 9:30 p.m. - Deputy Speaker Lindsay Luby advised Council that Committee of the Whole had completed its closed session consideration of confidential information related to this Item.  Council would now proceed with the public debate on this Item.


1 - Motion to Amend Item moved by Councillor Howard Moscoe (Carried)

That City Council:

 

1.         adopt the recommendations of the North York Community Council;

 

2.         authorize the City Solicitor and any necessary witnesses to attend at the Ontario Municipal Board to support the decision of Council;

 

3.         receive for information, the supplementary report (May 10, 2010) from the City Solicitor, and direct that Confidential Attachments 1 and 2 to the report remain confidential in their entirety, in accordance with the provisions of the City of Toronto Act, 2006, as they relate to litigation or potential litigation that affects the City or one of its agencies, boards and commissions, and contain advice or communications that are subject to solicitor-client privilege.


2 - Motion to Amend Item moved by Councillor Anthony Perruzza (Lost)

That City Council refuse the applications for Official Plan and rezoning amendments and the draft plan of subdivision.

Vote (Amend Item) May-12-2010 7:44 PM

Result: Lost Majority Required - NY33.46 - Perruzza - Motion 2
Total members that voted Yes: 6 Members that voted Yes are Mike Del Grande, Frank Di Giorgio, A.A. Heaps, Cliff Jenkins, Ron Moeser, Anthony Perruzza
Total members that voted No: 27 Members that voted No are Paul Ainslie, Brian Ashton, Maria Augimeri, Shelley Carroll, Raymond Cho, Janet Davis, Mike Feldman, Paula Fletcher, Mark Grimes, Suzan Hall, Doug Holyday, Norman Kelly, Gloria Lindsay Luby (Chair), Pam McConnell, Peter Milczyn, Denzil Minnan-Wong, Howard Moscoe, Frances Nunziata, Cesar Palacio, John Parker, Gord Perks, Kyle Rae, Bill Saundercook, David Shiner, Karen Stintz, Michael Thompson, Adam Vaughan
Total members that were Absent: 12 Members that were absent are Sandra Bussin, Glenn De Baeremaeker, John Filion, Rob Ford, Adam Giambrone, Chin Lee, Giorgio Mammoliti, Joe Mihevc, David Miller, Case Ootes, Joe Pantalone, Michael Walker

Motion to Adopt Item as Amended (Carried)

That City Council adopt Item NY33.46, as amended by motion 1 by Councillor Moscoe.

Vote (Adopt Item as Amended) May-12-2010 7:45 PM

Result: Carried Majority Required - NY33.46 - Adopt the Item, as amended by Moscoe Motion 1
Total members that voted Yes: 30 Members that voted Yes are Paul Ainslie, Brian Ashton, Maria Augimeri, Shelley Carroll, Raymond Cho, Janet Davis, Frank Di Giorgio, Mike Feldman, Paula Fletcher, Adam Giambrone, Mark Grimes, Suzan Hall, A.A. Heaps, Doug Holyday, Norman Kelly, Gloria Lindsay Luby (Chair), Pam McConnell, Peter Milczyn, Denzil Minnan-Wong, Howard Moscoe, Frances Nunziata, Cesar Palacio, John Parker, Gord Perks, Kyle Rae, Bill Saundercook, David Shiner, Karen Stintz, Michael Thompson, Adam Vaughan
Total members that voted No: 4 Members that voted No are Mike Del Grande, Cliff Jenkins, Ron Moeser, Anthony Perruzza
Total members that were Absent: 11 Members that were absent are Sandra Bussin, Glenn De Baeremaeker, John Filion, Rob Ford, Chin Lee, Giorgio Mammoliti, Joe Mihevc, David Miller, Case Ootes, Joe Pantalone, Michael Walker

46a - Staff Report - Official Plan Amendment and Rezoning Applications - 470 Sentinel Road and 1, 35 and 40 Fountainhead Road and Draft Plan of Subdivision Application - 35 Fountainhead Road

Background Information (Community Council)
Staff Report & Attachment 1 - 470 Sentinel Rd and 1, 35 & 40 Fountainhead Rd
https://www.toronto.ca/legdocs/mmis/2010/ny/bgrd/backgroundfile-29101.pdf
Attachment 2 - 470 Sentinel Rd & 1, 35 & 40 Fountainhead Rd
https://www.toronto.ca/legdocs/mmis/2010/ny/bgrd/backgroundfile-29102.pdf

46b - Staff Report - Official Plan Amendment and Rezoning Applications and 35 Fountainhead Road Draft Plan of Subdivision Application - 470 Sentinel Road and 1, 35 and 40 Fountainhead Road

Background Information (Community Council)
Staff Report & Attachment 1 - 470 Sentinel Rd & 1, 35 & 40 Fountainhead Rd
https://www.toronto.ca/legdocs/mmis/2010/ny/bgrd/backgroundfile-29103.pdf

46c - Staff Report - Official Plan Amendment and Rezoning Applications and 35 Fountainhead Road Draft Plan of Subdivision Application - 470 Sentinel Rd and 1, 35 and 40 Fountainhead Road

Background Information (Community Council)
Staff Report - Official Plan Amendment & Rezoning Applications - 470 Sentinel Rd, 1, 35 & 40 Fountainhead Rd and Draft Plan of Subdivision Application - 35 Fountainhead Rd
https://www.toronto.ca/legdocs/mmis/2010/ny/bgrd/backgroundfile-29074.pdf

NY33.46 - Final Report - 470 Sentinel Road and 1, 35 and 40 Fountainhead Road Official Plan Amendment and Rezoning Applications and 35 Fountainhead Road Draft Plan of Subdivision Application

Decision Type:
ACTION
Status:
Amended
Ward:
8 - York West

Community Council Recommendations

North York Community Council recommends that:

 

1.         City Council amend the Official Plan substantially in accordance with the draft Official Plan Amendment attached as Attachment No. 9 to the report (October 8, 2009) from the Director, Community Planning, North York District.

 

2.         City Council amend the Zoning By-law for the lands at 470 Sentinel Road and 1, 35 and 40 Fountainhead Road substantially in accordance with the draft Zoning By-law Amendment attached as Attachment No. 10 to the report (October 8, 2009) from the Director, Community Planning, North York District, with the following amendment:

 

a.         That the parking ratios at the existing rental buildings remain as at present.

 

3.         City Council authorize the City Solicitor to make such stylistic and technical changes to the draft Official Plan and Zoning By-law Amendments as may be required.

 

4.         Before introducing the necessary Bills to City Council for enactment, City Council require that the owner of the lands shall enter into an agreement with the City pursuant to Section 37 of the Planning Act, to the satisfaction of the City Solicitor, to secure and provide the following community benefits:

 

a.         the rental tenure of the four existing apartment buildings on the site and the maintenance of their affordable and mid-range rents for a minimum of 25 years from the date any by-law to permit additional development comes into effect, and agreement by the owner that during this time period no application for condominium conversion or application to demolish the existing buildings will be made;

 

b.         design, construct, provide and maintain at its own cost a new private recreation centre building of a minimum 2,200 m2 of gross floor area which is to include a minimum 1,100 m2 private recreation centre facility.  The recreation centre facility is for use by the residents of the existing rental apartment buildings at no cost to the tenants.  The recreation centre facility is to include an indoor swimming pool and change rooms;

 

The recreation centre building is to be constructed as part of Phase 1.  Prior to or together with the issuance of a building permit for Building L, and prior to the issuance of any building permit for Buildings I, J, K, E and F in Phases 2 and 3, construction shall have commenced on the recreation centre building.  The recreation centre facility shall be completed and ready for operation by the completion and occupancy of Building L and prior to the issuance of any building permit for Buildings I, J, K, E and F in Phases 2 and 3;

 

c.         construct and provide, to the satisfaction of Children’s Services Division, in the private recreation centre building a fully furnished and equipped 66 space non-profit child care centre of a minimum 1,100 m2 of gross floor area and a minimum 345 m2 of outdoor play space which will be appropriately surfaced and equipped and subject to City design criteria.  The child care centre is to be secured for a period of 99 years;

 

The child care centre is to be constructed and in operation as part of Phase 1.  Prior to or together with the issuance of a building permit for Building L, and prior to the issuance of any building permit for Buildings I, J, K, E and F in Phases 2 and 3, construction shall have commenced on the child care centre.  The child care centre shall be completed and ready for operation by the completion and occupancy of Building L and prior to the issuance of any building permit for Buildings I, K, E and F in Phases 2 and 3.

 

The owner agrees to provide a monetary contribution, indexed to the Statistics Canada Non-residential Construction Price Index for Toronto from the date this By-law comes into force, to the child care centre of:

 

i.          $150,000 for start up costs; and

ii.         $50,000 to a capital reserve equipment fund to provide for the replacement of equipment

by the completion and occupancy of Building L and prior to issuance of any building permit for Buildings I, K, E and F in Phases 2 and 3;

 

d.         the owner agrees to provide to the City a financial contribution of $700,000, indexed to the Statistics Canada Non-residential Construction Price Index for Toronto from the date this By-law comes into force, to be used towards the construction of an artificial outdoor ice rink in Fountainhead Park.  The financial contribution is to be provided as part of Phase 1 prior to the issuance of a building permit for Building L and prior to the issuance of any building permit for Buildings I, J, K, E and F in Phases 2 and 3, to the satisfaction of the General Manager, Parks, Forestry and Recreation;

 

e.         the owner agrees to provide to the City a financial contribution of a maximum of $1 million in instalments, for deposit to the City’s Capital Revolving Fund for Affordable Housing, with each instalment to be paid prior to issuance of the related above-grade building permit.  For Buildings E, F, G, H, I, J, K and L, each instalment amount is based on $1,000 per dwelling unit included in the related building permit to be issued, to a total for all of the buildings not to exceed $1 million, together with the indexing amount for that instalment.  Each instalment shall be indexed to the Statistics Canada New Housing Construction Price Index for Toronto from the date this By-law comes into force to the date of payment;

 

f.          a public art contribution of $250,000, indexed to the Statistics Canada Non-residential Construction Price Index for Toronto from the date this By-law comes into force, in accordance with the City of Toronto’s Percent For Public Art Program;

 

g.         prepare and implement a ravine stewardship plan for the public lands located in the valley and the lands located below and above the staked top-of-bank line being conveyed to the Toronto and Region Conservation Authority, to the satisfaction of the Toronto and Region Conservation Authority and Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division:

 

i.          a Letter of Credit to secure the preparation of the ravine stewardship plan shall be submitted to the Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division prior to master site plan approval, to the satisfaction of the Toronto and Region Conservation Authority and Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division; and

 

ii.         a Letter of Credit guaranteeing the implementation of the ravine stewardship plan shall be submitted to the Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division prior to Phase 1 site plan approval, to the satisfaction of the Toronto and Region Conservation Authority and Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division; and

 

h.         the owner agrees that the above noted facilities, services and/or matters shall be provided with no pass through of related costs to the tenants of the existing buildings.

 

5.         Before introducing the necessary Bills to City Council for enactment, City Council require that the owner of the lands shall enter into an agreement with the City pursuant to Section 37 of the Planning Act, to the satisfaction of the City Solicitor, to secure and provide the following:

 

a.         net improvements to the existing rental buildings that are to be maintained and their related facilities with no pass through of related costs to the tenants, to the satisfaction of the Director, Community Planning, North York District.  These improvements are generally as set out in Attachment 8 and are to have a minimum value of $5 million.  The improvements are to be completed prior to the issuance of a building permit for Buildings E and F in Phase 3;

 

b.         construction shall proceed in accordance with the development Phasing Plan;

 

c.         the owner agrees to convey to the City for nominal consideration:

 

i.          lands for the extension of Fountainhead Road to Finch Avenue;

ii.          lands for road widenings; and

iii.         lands to provide a cul-de-sac at the west end of Fountainhead Road

 

as set out in the Technical Services Division memorandum dated May 14, 2009 to the satisfaction of the Director, Technical Services, North York District;

 

d.         the owner agrees to commence construction of the extension of Fountainhead Road to Finch Avenue including a new signalized intersection, road widenings, and a cul-de-sac at the west end of Fountainhead Road, all as part of Phase 1 and to complete these road works prior to the issuance of any building permit for Buildings I, J, K, E and F in Phases 2 and 3 to the satisfaction of the Director, Technical Services, North York District;

 

e.         develop and implement an appropriate construction mitigation and communications strategy for the tenants of the existing buildings and residents of the new residential buildings at the owner’s cost and expense, to the satisfaction of the Director, Transportation Services, North York District;

 

f.          the owner agrees to provide and maintain a green roof with a continuous coverage of vegetation over at least 50% of the roof of the recreation centre building, to be implemented through site plan approval, to the satisfaction of the Director, Community Planning, North York District;

 

g.         dedicate and convey to the Toronto and Region Conservation Authority for nominal consideration, all the lands below and above the staked top of bank line as shown on Zoning By-law Schedules RM6(182)A, RM6(182)B, and RM6(182)C having an area of approximately 0.475 hectares, to the satisfaction of the Toronto and Region Conservation Authority and the City Solicitor, prior to the registration of the first condominium in Phase 1;

 

h.         prepare and implement a forest stewardship plan for the forested areas on the site north of Fountainhead Road and south of the hydro corridor, to the satisfaction of the Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division:

 

i.          a Letter of Credit to secure the preparation of the forest stewardship plan shall be submitted prior to master site plan approval, to the satisfaction of the Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division; and

 

ii.         a Letter of Credit guaranteeing the implementation of the forest stewardship plan shall be submitted prior to Phase 3 site plan approval, to the satisfaction of the Parks, Forestry and Recreation, Urban Forestry, Ravine and Natural Feature Protection Division;

 

i.          the landscape master plan valued at a minimum of $1,500,000 to form the basis for detailed landscape plans for on site landscape improvements which will be secured through an agreement pursuant to Section 41 of the Planning Act and Section 114 of the City of Toronto Act;

 

j.          buildings E and J will be marketed as seniors residences.  The buildings will include common and shared facilities such as kitchens and common dining rooms;

 

k.         the owner agrees to provide a certified cheque to the Toronto Transit Commission (T.T.C.) for $50,000 for transit signal priority intersection improvements as noted in the memorandum of the Toronto Transit Commission dated December 23, 2008.  This is to be paid to the T.T.C. prior to the issuance of any building permit;

 

l.          provide a revised stormwater management plan as part of master site plan approval to the satisfaction of the Toronto and Region Conservation Authority and the Director, Technical Services, North York District; and

 

m.        the owner agrees that the above noted facilities, services and/or matters shall be provided with no pass through of related costs to the tenants of the existing buildings.

 

6.         City Council recommend to the Chief Planner that the Draft Plan of Subdivision be approved, generally as illustrated on Attachment 3 to the report (October 8, 2009) from the Director, Community Planning, North York District, subject to:

 

a.         the conditions as generally listed in Attachment 11 to the report (October 8, 2009) from the Director, Community Planning, North York District, which except as otherwise noted, must be fulfilled prior to the release of the plan of subdivision for registration; and

 

b.         such revisions to the proposed plan of subdivision or additional or modified conditions as the Chief Planner may deem to be appropriate to address matters arising from the on-going technical review of the development.

 

7.         City Council require that the indoor amenity space for Phase I of the development be 1.5 m² per unit.

 

8.         City Council direct that prior to the construction of Phase II, the City Planning Division shall, at the expense of the applicant, undertake a review of the existing rental buildings and the occupancy of Phase I buildings (excluding the seniors building) to determine the number of units that are occupied by university students.

 

9.         City Council direct that the number of m² of indoor amenity above 1.5 m² per dwelling unit for Phase II shall be determined by this review in order to ensure that amenities of the type that can provide study and recreation facilities suitable for students are included in Phase II.

 

10.       City Council direct that should it be found that there are a significant number of students, Phase II amenity space ratio shall be increased up to 2.5 m² per dwelling unit to accommodate students in Phase I and the rental buildings as well as the anticipated university occupants of Phase II.

 

11.       City Council direct that approvals for on-site tree replacement and planting shall be subject to a report from Urban Forestry to be considered by the North York Community Council.

Origin

(October 8, 2009) Report from Director, Community Planning, North York District

Summary

The rezoning application was submitted on July 17, 2006 and is therefore not subject to the new provisions of the Planning Act and the City of Toronto Act, 2006.  The Official Plan Amendment and Draft Plan of Subdivision applications were submitted after this date and are subject to these Acts.

 

The proposal for 470 Sentinel Road and 1, 35 and 40 Fountainhead Road is to permit 1,035 new residential units in 8 condominium apartment buildings with heights ranging from 6 to 12 storeys.  The proposal also includes a new public road connecting the west end of Fountainhead Road to Finch Avenue.  The four existing 22 storey rental apartment buildings on the lands will be maintained and upgraded.

 

The proposal also includes the construction of a new private indoor recreational centre for the existing rental buildings, a 66 space child care facility, 93 m2 of commercial space, a financial contribution of $700,000 to be used towards the construction of an artificial ice rink at Fountainhead Park and a financial contribution of a maximum of $1 million to the City’s Capital Revolving Fund for Affordable Housing.

 

This report reviews and recommends approval of the applications to amend the Official Plan and Zoning By-law and for Draft Plan of Subdivision.

Background Information

Final Report & Attachments 1-11 - 470 Sentinel Rd & 1, 35 & 40 Fountainhead Rd
https://www.toronto.ca/legdocs/mmis/2010/ny/bgrd/backgroundfile-29097.pdf

Communications

(October 22, 2009) E-mail from John Newton (NY.Main.NY33.46.1)
(October 23, 2009) Letter from M. Armstrong (NY.Main.NY33.46.2)
(October 30, 2009) E-mail from Robert Calderan (NY.Main.NY33.46.3)
(November 1, 2009) E-mail from Uri Zellermayer (NY.Main.NY33.46.4)
(November 2, 2009) E-mail from Hodari Clarke (NY.Main.NY33.46.5)
(November 3, 2009) E-mail from Xin (Melissa) Chang (NY.Main.NY33.46.6)
(November 4, 2009) E-mail from Uri Zellermayer (NY.Main.NY33.46.7)
(November 7, 2009) E-mail from Ruth Nusbaum and Rita Boudreau (NY.Main.NY33.46.8)
(November 10, 2009) E-mail from Michael Tilley (NY.Main.NY33.46.9)
(November 10, 2009) Letter from Michael J. Spence (NY.Main.NY33.46.10)
(November 10, 2009) Submission from Elizabeth Ujvari (NY.Main.NY33.46.11)
(November 10, 2009) Petition from Peter Wolfl, signed by 282 area residents in opposition to the proposed application (NY.Main.NY33.46.12)
(November 10, 2009) Submission from Peter Wolfl (NY.Main.NY33.46.13)
(November 10, 2009) Submission from Katherine Chisholm (NY.Main.NY33.46.14)
(January 8, 2010) E-mail from Peter Wolfl (NY.Main.NY33.46.15)
(January 12, 2010) Submission from Elizabeth Ujvari (NY.Main.NY33.46.16)
(January 18, 2010) E-mail from Peter Wolfl (NY.Main.NY33.46.17)
(January 25, 2010) Letter from Kim Kovar, Aird & Berlis, LLP, on behalf of the applicant (NY.Main.NY33.46.18)
(January 25, 2010) Letter from Katherine Chisholm (NY.Main.NY33.46.19)
(January 22, 2010) E-mail from Peter Wolfl, addressed to Councillor Perruzza (NY.Main.NY33.46.20)
(April 25, 2010) E-mail from Elizabeth Ujvari (NY.New.NY33.46.21)
(April 26, 2010) E-mail from Elizabeth Ujvari (NY.New.NY33.46.22)

Motions

Motion to Adopt Item moved by Councillor Shelley Carroll (Carried)

That:

 

1.         The staff recommendations in the Recommendation Section of the report (October 8, 2009) from the Director, Community Planning, North York District, be adopted.

Vote (Adopt Item) Apr-27-2010

Result: Carried Majority Required
Total members that voted Yes: 7 Members that voted Yes are Maria Augimeri (Chair), Shelley Carroll, Mike Feldman, Denzil Minnan-Wong, John Parker, David Shiner, Karen Stintz
Total members that voted No: 4 Members that voted No are John Filion, Cliff Jenkins, Howard Moscoe, Anthony Perruzza
Total members that were Absent: 0 Members that were absent are

Motion to Amend Item moved by Councillor Howard Moscoe (Carried)

That:

 

1.         The indoor amenity space for Phase I of the development be 1.5 m² per unit.

 

2.         Prior to the construction of Phase II, the Planning Division shall, at the expense of the applicant, undertake a review of the existing rental buildings and the occupancy of Phase I buildings (excluding the seniors building) to determine the number of units that are occupied by university students.

 

3.         The number of m² of indoor amenity above 1.5 m² per dwelling unit for Phase II shall be determined by this review in order to ensure that amenities of the type that can provide study and recreation facilities suitable for students are included in Phase II.

 

4.         Should it be found that there are a significant number of students, Phase II amenity space ratio shall be increased up to 2.5 m² per dwelling unit to accommodate students in Phase I and the rental buildings as well as the anticipated university occupants of Phase II.

 

5.         Approvals for on site tree replacement and planting shall be subject to a report from Urban Forestry to be considered by the North York Community Council.

 

6.         The parking ratios at the existing rental buildings remain as at present.

 


Motion to Amend Item moved by Councillor Anthony Perruzza (Lost)

That:

 

1.         City Council refuse the Official Plan Amendment and Rezoning Applications at 470 Sentinal Road and 1, 35 and 40 Fountainhead Road and the Draft Plan of Subdivision Application at 35 Fountainhead Road.

 

2.         City Council authorize the City Solicitor to hire outside planning consultants to uphold Council’s decision at the Ontario Municipal Board Hearing.

Vote (Amend Item) Apr-27-2010

Result: Lost Majority Required
Total members that voted Yes: 4 Members that voted Yes are John Filion, Cliff Jenkins, Howard Moscoe, Anthony Perruzza
Total members that voted No: 7 Members that voted No are Maria Augimeri (Chair), Shelley Carroll, Mike Feldman, Denzil Minnan-Wong, John Parker, David Shiner, Karen Stintz
Total members that were Absent: 0 Members that were absent are

46a - Staff Report - Official Plan Amendment and Rezoning Applications - 470 Sentinel Road and 1, 35 and 40 Fountainhead Road and Draft Plan of Subdivision Application - 35 Fountainhead Road

Origin
(January 6, 2010) Report from Director, Community Planning, North York District
Summary

This report addresses a direction from North York Community Council referring a motion to the Director, Community Planning, North York District for a report back to Community Council on the above applications.

Background Information
Staff Report & Attachment 1 - 470 Sentinel Rd and 1, 35 & 40 Fountainhead Rd
https://www.toronto.ca/legdocs/mmis/2010/ny/bgrd/backgroundfile-29101.pdf
Attachment 2 - 470 Sentinel Rd & 1, 35 & 40 Fountainhead Rd
https://www.toronto.ca/legdocs/mmis/2010/ny/bgrd/backgroundfile-29102.pdf

46b - Staff Report - Official Plan Amendment and Rezoning Applications and 35 Fountainhead Road Draft Plan of Subdivision Application - 470 Sentinel Road and 1, 35 and 40 Fountainhead Road

Origin
(February 12, 2010) Report from Director, Community Planning, North York District
Summary

On January 27, 2010 City Council referred these applications back to the North York Community Council and requested the Chief Planner and Executive Director, City Planning to report back on additional matters.  This report advises that staff will report back on these matters when the review is completed.

Background Information
Staff Report & Attachment 1 - 470 Sentinel Rd & 1, 35 & 40 Fountainhead Rd
https://www.toronto.ca/legdocs/mmis/2010/ny/bgrd/backgroundfile-29103.pdf

46c - Staff Report - Official Plan Amendment and Rezoning Applications and 35 Fountainhead Road Draft Plan of Subdivision Application - 470 Sentinel Rd and 1, 35 and 40 Fountainhead Road

Origin
(April 9, 2010) Report from Director, Community Planning, North York District
Summary

An October 8, 2009 report from the Director, Community Planning, North York District recommended approval of Official Plan and Zoning By-law amendments and a Draft Plan of Subdivision for these lands.  On March 9, 2010 North York Community Council deferred these applications to allow the Chief Planner and Executive Director, City Planning Division to report as directed by City Council on additional matters.  On February 10, 2010 the applicant appealed these applications to the OMB and a hearing has now been scheduled to commence on June 21, 2010.  This report addresses Council’s direction.

Background Information
Staff Report - Official Plan Amendment & Rezoning Applications - 470 Sentinel Rd, 1, 35 & 40 Fountainhead Rd and Draft Plan of Subdivision Application - 35 Fountainhead Rd
https://www.toronto.ca/legdocs/mmis/2010/ny/bgrd/backgroundfile-29074.pdf