Skip to content

Tracking Status

  • City Council adopted this item on January 26 and 27, 2010 without amendments.
  • This item was considered by the Executive Committee on January 4, 2010 and adopted without amendment. It will be considered by City Council on January 26 and 27, 2010.

EX39.4 - Licence Agreement-Toronto Hydro Energy Services Inc.

Decision Type:
ACTION
Status:
Adopted

City Council Decision

City Council on January 26 and 27, 2010, adopted the following:

 

1.         City Council approve a Licence Agreement with Toronto Hydro Energy Services Inc. (THESI) to design, build and operate a Photovoltaic System on the roof of the Better Living Centre (BLC) on the terms and conditions as detailed in the report (December 9, 2009) from the Chief Executive Officer, Exhibition Place, and any other terms as may be satisfactory to the Chief Executive Officer and the City Solicitor.

 

2.         City Council give authority for the Board of Governors of Exhibition Place (“the Board”) to enter into any interconnection/embedded generation agreement which may be required by the electricity distributor (e.g. Toronto Hydro-Electric System Limited) which may be required as a result of the Photovoltaic System, on such terms as may be satisfactory to the Chief Executive Officer and the City Solicitor.

Background Information (Committee)

Licence Agreement-Toronto Hydro Energy Services Inc.
https://www.toronto.ca/legdocs/mmis/2010/ex/bgrd/backgroundfile-26068.pdf

Motions (City Council)

1 - Motion to Receive Item moved by Councillor Rob Ford (Lost)
That this Item be received for information.

Vote (Receive Item) Jan-26-2010 11:16 AM

Result: Lost Majority Required - EX39.4 - Ford - Motion 1
Total members that voted Yes: 2 Members that voted Yes are Rob Ford, Case Ootes
Total members that voted No: 34 Members that voted No are Paul Ainslie, Brian Ashton, Raymond Cho, Janet Davis, Glenn De Baeremaeker, Mike Del Grande, Frank Di Giorgio, John Filion, Paula Fletcher, Adam Giambrone, Mark Grimes, Suzan Hall, A.A. Heaps, Doug Holyday, Cliff Jenkins, Norman Kelly, Chin Lee, Gloria Lindsay Luby (Chair), Giorgio Mammoliti, Pam McConnell, Joe Mihevc, Peter Milczyn, David Miller, Ron Moeser, Howard Moscoe, Frances Nunziata, Joe Pantalone, Gord Perks, Anthony Perruzza, Kyle Rae, Bill Saundercook, David Shiner, Michael Thompson, Michael Walker
Total members that were Absent: 9 Members that were absent are Maria Augimeri, Sandra Bussin, Shelley Carroll, Mike Feldman, Denzil Minnan-Wong, Cesar Palacio, John Parker, Karen Stintz, Adam Vaughan

Motion to Adopt Item (Carried)

Vote (Adopt Item) Jan-26-2010 11:17 AM

Result: Carried Majority Required - EX39.4 - Adopt Item
Total members that voted Yes: 35 Members that voted Yes are Paul Ainslie, Brian Ashton, Raymond Cho, Janet Davis, Glenn De Baeremaeker, Mike Del Grande, Frank Di Giorgio, John Filion, Paula Fletcher, Adam Giambrone, Mark Grimes, Suzan Hall, A.A. Heaps, Doug Holyday, Cliff Jenkins, Norman Kelly, Chin Lee, Gloria Lindsay Luby (Chair), Giorgio Mammoliti, Pam McConnell, Joe Mihevc, Peter Milczyn, David Miller, Ron Moeser, Howard Moscoe, Frances Nunziata, Joe Pantalone, Gord Perks, Anthony Perruzza, Kyle Rae, Bill Saundercook, David Shiner, Michael Thompson, Adam Vaughan, Michael Walker
Total members that voted No: 2 Members that voted No are Rob Ford, Case Ootes
Total members that were Absent: 8 Members that were absent are Maria Augimeri, Sandra Bussin, Shelley Carroll, Mike Feldman, Denzil Minnan-Wong, Cesar Palacio, John Parker, Karen Stintz

EX39.4 - Licence Agreement-Toronto Hydro Energy Services Inc.

Decision Type:
ACTION
Status:
Adopted

Committee Recommendations

The Executive Committee recommends that:

 

1.         City Council approve a Licence Agreement with Toronto Hydro Energy Services Inc. (THESI) to design, build and operate a Photovoltaic System on the roof of the Better Living Centre (BLC) on the terms and conditions as detailed in the report (December 9, 2009) from the Chief Executive Officer, Exhibition Place, and any other terms as may be satisfactory to the Chief Executive Officer and the City Solicitor.

 

2.         City Council give authority for the Board of Governors of Exhibition Place (“the Board”) to enter into any interconnection/embedded generation agreement which may be required by the electricity distributor (e.g. Toronto Hydro-Electric System Limited) which may be required as a result of the Photovoltaic System, on such terms as may be satisfactory to the Chief Executive Officer and the City Solicitor.

Origin

(December 9, 2009) Report from the Chief Executive Officer, Exhibition Place

Summary

With the introduction of the Green Energy and Green Economy Act, 2009 and the passing of the Feed-In-Tariff (FIT) regulations, Exhibition Place and Toronto Hydro Energy Services Inc. (THESI) began discussions to enter an agreement which would result in the licensing of the roof of the Better Living Centre (BLC) to THESI which would then design, construct and operate totally at the cost of THESI a photovoltaic plant (PV System) covering the roof.

 

In 2008/09, Exhibition Place reroofed the BLC adding insulation and upgraded the building structure to allow for additional loads all in preparation of adding a PV System as part of the Board’s long-term goal of energy self-sufficiency.  Partnering with THESI will now allow this PV System to be built by the end of 2010.  All power from the PV System will be sold to the Ontario Power Authority (OPA) through the FIT regulations although, like the wind turbine, the PV System will be connected through the BLC substation and therefore, used to power the facilities at Exhibition Place through the Exhibition Place electrical grid.

 

Financial Impact

All costs associated with the design, build and operation of the nominal 500kW PV System estimated to be in the range of $3M will be paid by THESI. The Board will receive a royalty fee for the BLC roof based on 2% of energy production revenues with a guaranteed annual base fee of $3,000.00 adjusted annually for CPI.

 

 

Background Information

Licence Agreement-Toronto Hydro Energy Services Inc.
https://www.toronto.ca/legdocs/mmis/2010/ex/bgrd/backgroundfile-26068.pdf